Fawcett Center Renovations

Location: Ohio
Posted: Sep 22, 2026
Due: Oct 7, 2026
Agency: Ohio Facility Construction Commission
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: OSU-270004
Publication URL: To access bid details, please log in.
Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated Project Cost Q&A Short List Notes
2026/09/21 2026/10/07 OSU-270004 The Ohio State University Local Higher Education Fawcett Center Renovations A/E $6,500,000 N/A TBD

Attachment Preview

Design BIM Use Case Required A dditional Notes
2.3.1.1. Model Authoring - Design Intent BIMs (Required for the Architectural team and the Engineering team) X
2.3.1.2. Model Authoring - Design Intent BIMs (Required for the architectural team, preferred for the engineering team)
2.3.2. Existing Conditions Documentation/Modeling X
2.3.3. Program of Requirements (PoR) Validation X
2.3.4. Site Design
2.3.5. Model Based User Group Meetings/Reviews X

Request for Qualifications (Registered Design Professional*)
State of Ohio Standard Forms and Documents
Administration of Project: Local Higher Education
Project Name Fawcett Center Renovations Response Deadline 10/07/2026 2:00 PM local time
Project Location Fawcett Center for Tomorrow (0284) Project Number OSU-270004
City / County Columbus / Franklin Project Manager Ross Quellhorst
Owner The Ohio State University Contracting Authority Local Higher Education
Delivery Method Construction Manager at Risk Prevailing Wages State
No. of paper copies requested (stapled, not bound) 0 No. of electronic copies requested (PDF) 1
* "Registered Design Professional includes any architect holding a certificate issued under section 4703.10 of the Revised
Code, any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or any engineer
holding a certificate issued under section 4733.14 of the Revised Code." (Ohio Building Code section 4101:1-2-01 Definitions)
Submit the Statements of Qualifications (Form F110-330) via email to:
Fawcett_Center_Renovations_-_Enabling.01_Selection@docs.e-builder.net
In the subject line, include the project number and name for RFQ you are responding to. See Section J of this RFQ for
additional submittal instructions.
Submit all questions regarding this RFQ in writing to Ross Quellhorst at quellhorst.9@osu.edu with the project number
included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the
OFCC website at https://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the party
submitting a question will not be included on the Q&A document.
Project Overview
A. Project Description
The Fawcett Center serves as a versatile event venue and the home of The Ohio State University's Athletics Administration.
To better support collaboration among administrators and student-athletes, the Department of Athletics is planning to renovate
the west wing of the facility.
The project will transform approximately 18,000 square feet of currently vacant space, formerly occupied by WOSU, into a
modern, collaborative workplace. The renovated area will consolidate Athletic Administration/Business Administration (BA), the
Eugene D. Smith Leadership Institute (EDSLI), and the Content Creation Team into the basement and first floor of the Fawcett
Center.
The renovated space will include private offices, open work areas, conference rooms, video and photography studios,
collaboration spaces, and supporting amenities designed to enhance communication, innovation, and operational efficiency.
To accommodate the new program, the project will include new and upgraded mechanical, electrical, and plumbing (MEP)
systems to support the functional and technical requirements of the renovated spaces.
This project is required to be designed and delivered within a collaborative BIM-enabled environment following The Ohio
State University BIM Project Delivery Standards. The Primary firm submitting for the project will be required to have the
BIM expertise capable of meeting the aforementioned standards. The Ohio State University BIM Project Delivery
Standards can be accessed via the OSU FOD website: BIM Project Delivery Standards.
The minimum required BIM Use Cases for this project are noted below. Details on the BIM Uses Cases are outlined in
Section 2 of the Ohio State University BIM Project Delivery Standards.
Design BIM Use Case Required A dditional Notes
2.3.1.1. Model Authoring - Design Intent BIMs (Required for the X
Architectural team and the Engineering team)
2.3.1.2. Model Authoring - Design Intent BIMs (Required for the
architectural team, preferred for the engineering team)
2.3.2. Existing Conditions Documentation/Modeling X
2.3.3. Program of Requirements (PoR) Validation X
2.3.4. Site Design
2.3.5. Model Based User Group Meetings/Reviews X
F110-02-2024-OCT Publish Date: 9/21/2026 Page 1 of 5

Design BIM Use Case Required A dditional Notes
2.3.6. Sustainability (Energy Modeling/Simulation and Performance)/ Design Simulation/Analysis
2.3.7. Clash Prevention X
2.3.8 Quantity Schedule
Construct BIM Use Case Required A dditional Notes
2.4.1. Model Authoring - Trade Coordination BIMs X
2.4.2. Model Authoring - Shop/Fabrication BIMs
2.4.3. Clash Detection X
2.4.4. Model-based Scheduling (Sequencing/Simulation)
2.4.5. Model-based Estimating (Quantification/Cost Estimating)
2.4.6. Site Analysis Planning
Deliverable Required
BIM Execution Plan X
Design Intent BIMs X
Revit Model Rule Set Results X
Interim Architectural and Structural Conformed Design Intent BIMs X
Project Base Point X
Conformed Design Intent BIMs X
Interim Asset Worksheet X
Final Asset Worksheet X

Request for Qualifications (Registered Design Professional) continued
Design BIM Use Case Required A dditional Notes
2.3.6. Sustainability (Energy Modeling/Simulation and
Performance)/ Design Simulation/Analysis
2.3.7. Clash Prevention X
2.3.8 Quantity Schedule
Construct BIM Use Case Required A dditional Notes
2.4.1. Model Authoring - Trade Coordination BIMs X
2.4.2. Model Authoring - Shop/Fabrication BIMs
2.4.3. Clash Detection X
2.4.4. Model-based Scheduling (Sequencing/Simulation)
2.4.5. Model-based Estimating (Quantification/Cost Estimating)
2.4.6. Site Analysis Planning
The minimum required deliverables for this project are noted below. Details on the BIM deliverables are outlined in
Section 4 of the Ohio State University BIM Project Delivery Standards
Deliverable Required
BIM Execution Plan X
Design Intent BIMs X
Revit Model Rule Set Results X
Interim Architectural and Structural X
Conformed Design Intent BIMs
Project Base Point X
Conformed Design Intent BIMs X
Interim Asset Worksheet X
Final Asset Worksheet X
This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of
meeting this prerequisite and is responsible to support their consultants to meet this requirement. The Asset Tagging
Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website
(https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards;
Building Information Modeling (BIM).
B. Scope of Services
The project and construction budget as listed in this RFQ is estimated. A detailed study has been completed by the
University for this project. Upon award of the Agreement, it is anticipated that the AE meet with the university to confirm
and further complete definition of all requirements of the project.
The project has been approved for design services only. This request is for Registered Design Professional to provide
design and project management to establish the schematic design concept, design development, construction documents,
bidding, construction contract administration and post-construction services.
For projects advertised with an appropriately developed Program of Requirements (POR) or study, upon award of the
Agreement, commence with Design.
The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf.
The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and
clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed
cost components to address the Owner's project requirements. Participate in the Encouraging Growth, Diversity & Equity
(EDGE) Program as required by statute and the Agreement. Required Professional Liability Insurance will be per Exhibit A
- A/E Terms and Conditions Article 7.2.6.
As required by the Agreement, and as properly authorized, provide the following categories of services: Program
Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support,
Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types.
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required
for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.
The selected A/E will be required to sign the standard agreement. No modifications to the requirements in the agreement
will be accepted.
F110-02-2024-NOV Publish Date: [leave blank] Page 2 of 5

Request for Qualifications (Registered Design Professional) continued
During the construction period, provide not less than 4 hours (excluding travel time) on-site construction administration
services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site
representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having
relevant and appropriate types of construction administration experience.
The project team (Owner / A/E / Contractor) will be required to utilize the University's Project Management System, for all
compatible services required by the University.
The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors,
and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within
Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here:
https://fod.osu.edu/resources, under the section titled "Construction Site Safety Requirements."
Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using the
e-Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio
State University Project Closeout Standards can be accessed via the OSU FOD vender resource website
(https://fod.osu.edu/resources) under Post Construction / Close Out.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Experience delivering CMR or Design-Build Deliver Method for The Ohio State University
2. Projects delivered in a collaborative BIM-enabled environment
3. Experience in designing and delivering multi-office and collaborative space projects
4. Renovation of an occupied building
For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330),
projects must be designed by the Lead Firm.
C. Estimated Budget / Funding D. Anticipated Schedule
State Funding: $0 Professional Services Start: 11 / 26
Other Funding: $6,500,000 Construction Notice to Proceed: 05 / 27
Construction Cost: $4,500,000 Substantial Completion of all Work: 03 / 28
Total Project Cost: $6,500,000 Professional Services Completed: 05 / 28
E. Estimated Basic Fee Range (see note below) F. EDGE Participation Goal
7.1% to 7.3% Percent of initial Total A/E Fee: 5%
NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents,
(5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. The
Basic Fee includes all professional design services and consultant services necessary for proper completion of the Basic Services, including
validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules for the
project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above. The Basic
Fee excludes any Additional Services required for the project.
G. Basic Service Providers Required (see note below) H. Additional Service Providers Required
Lead A/E Discipline: Architecture Interior Furniture Design
Secondary Mechanical/Electrical/Plumbing Engineering Hazardous Materials
Disciplines: Data / Communications / Security Graphics Design
NOTE: The lead A/E shall be (1) any architect holding a certificate issued under section 4703.10 of the Revised Code, (2) any landscape
architect holding a certificate issued under section 4703.36 of the Revised Code, or (3) any engineer holding a certificate issued under section
4733.14 of the Revised Code.
I. Evaluation Criteria for Selection
* Demonstrated ability to meet Owner's programmed project vision, scope, budget, and schedule on previous
projects.
* Demonstrated ability to meet Owner's Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf.
* Previous experience compatible with the proposed project (e.g., type, size).
F110-02-2024-NOV Publish Date: [leave blank] Page 3 of 5

Request for Qualifications (Registered Design Professional) continued
* Relevant past work of prospective firm's proposed consultants.
* Past performance of prospective firm and its proposed consultants.
* Qualifications and experience of individuals directly involved with the project.
* Proposer's previous experience (numbers of projects, sizes of projects) when working with its proposed
consultants.
* Design quality and demonstrated ability of prospective firm and its proposed consultants to provide design
services which represent the University's Design Guidelines for Buildings and Landscape buildings-
landscape.pdf
* Specification writing credentials and experience.
* Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPM
schedules as a project management resource.
* Approach to and success of using partnering and Alternative Dispute Resolution.
* Proximity of prospective firms to the project site.
* Proposer's apparent resources and capacity to meet the needs of this project.
* The selected A/E and all its consultants must have the capability to use the Internet within their normal business
location(s) during normal business hours.
Interested firms are required to address their BIM project delivery experience and how they will implement Building
Information Modeling ("BIM") on the project by documenting:
* The ability for the entire team to effectively collaborate and share models and data.
* Each discipline's model manager and their relevant experience.
* How the A/E will support a consultant that does not have sufficient BIM experience to meet the above
expectations.
Interested A/E firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program
form in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract
with and use EDGE-certified Business Enterprise(s), as a part of the A/E's team. The Intent to Contract and to Perform
and / or waiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must be
attached to the A/E's Technical Proposal. Both forms can be accessed via the OFCC website at https://ofcc.ohio.gov. The
Intent to Contract and to Perform form is again required at the Fee Proposal stage.
If the A/E firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a
completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform forms
signed by both parties with its Statement of Qualifications.
For all Statements of Qualifications, please identify the EDGE-certified Business Enterprises, by name, which will
participate in the delivery of the proposed professional services solicited in the RFQ.
Interested A/E firms must indicate on their Statement of Qualifications, the locations where their services will be
performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D
related to providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting
purchases from or investment in any Russian institution or company. Failure to do so may cause their Statement of
Qualifications to be rejected.
J. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at https://ofcc.ohio.gov.
Electronic submittals should be combined into one PDF file saved with the form name, project number listed on the RFQ
and your firm's name (ex. F110-330_OSU-nnnnnn_Firm Name). Use the "print" feature of Adobe Acrobat or similar
software for creating a PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go
to Advanced, then PDF Optimizer.
Statements of Qualifications must be submitted electronically by email. Submittals are limited to one email with a
maximum file size of 25 MB.
Firms are requested to identify professional registrations, memberships, and credentials including: LEED GA, LEED AP,
LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.
Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.
F110-02-2024-NOV Publish Date: [leave blank] Page 4 of 5

Selection Criteria Value Score
1. Primary Firm Location, Workload and Size (Maximum 10 points)
a. Proximity of firm to project site Less than 50 miles 5
50miles to 100 miles 2
More than 100 miles 0
b. Amount of fees awarded by Contracting Authority in previous 24 months Less than $200,000 2
$200,000 to $1,000,000 1
More than $1,000,000 0
c. Number of licensed professionals Less than 2 professionals 0 Max = 3
2 to 10 professionals 1
More than 10 professionals 2
2. Primary Firm Qualifications (Maximum 30 points)
a. Project management lead Experience / ability of project manager to manage scope / budget / schedule / quality 0 - 10
b. Project design lead Experience / creativity of project designer to achieve owner's vision and requirements 0 - 10 Max = 20
c. Technical staff Experience / ability of technical staff to create fully coordinated construction documents 0 - 5
d. Construction administration staff Experience / ability of field representative to identify and solve issues during construction 0 - 5
3. Key Consultant Qualifications (Maximum 20 points)
a. Key discipline leads Experience / ability of key consultants to perform effectively and collaboratively 0 - 15
b. Proposed EDGE-certified Consultant participation* One point for every 2 percent increase in 0 - 5
professional services over the EDGE
participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration Less than 2 sample projects 1 Max = 3
2 to 4 sample projects 2
More than 4 sample projects 3
b. OSU Sustainability Standards or LEED** project experience LEED v4.0 or v4.1 projects 0 Max = 2
OSU Sustainability Standards projects 2
c. BIM project experience Training and knowledge 0 Max = 3
Direct project experience 3
d. Team organization Clarity of responsibility / communication demonstrated by table of organization 0 - 2
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance Past performance as indicated by evaluations and letters of reference 0 - 10
b. Experience with similar projects / delivery methods Less than 2 projects 0 - 3
2 to 6 projects 4 - 6
More than 6 projects 7 - 10
c. Budget and schedule management Performance in completing projects within original construction budget and schedule 0 - 5
d. Knowledge of Ohio Capital Improvements process Less than 3 projects 0 - 1
3 to 6 projects 2 - 3
More than 6 projects 4 - 5
Subtotal

Architect / Engineer Selection Rating Form
State of Ohio Standard Forms and Documents
Project Name Fawcett Center Renovations - Enabling Proposer Firm
Project Number OSU-270004 City, State, Zip
Selection Criteria Value Score
1. Primary Firm Location, Workload and Size (Maximum 10 points)
Less than 50 miles 5
a. Proximity of firm to project site 50miles to 100 miles 2
More than 100 miles 0
Less than $200,000 2
b. Amount of fees awarded by Contracting Authority in
$200,000 to $1,000,000 1
previous 24 months
More than $1,000,000 0
Less than 2 professionals 0
Max
c. Number of licensed professionals 2 to 10 professionals 1
= 3
More than 10 professionals 2
2. Primary Firm Qualifications (Maximum 30 points)
Experience / ability of project manager to
a. Project management lead 0 - 10
manage scope / budget / schedule / quality
Experience / creativity of project designer to
b. Project design lead 0 - 10
achieve owner's vision and requirements
Experience / ability of technical staff to create Max
c. Technical staff 0 - 5
fully coordinated construction documents = 20
Experience / ability of field representative to
d. Construction administration staff 0 - 5
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 20 points)
Experience / ability of key consultants to
a. Key discipline leads 0 - 15
perform effectively and collaboratively
One point for every 2 percent increase in
b. Proposed EDGE-certified Consultant participation* professional services over the EDGE 0 - 5
participation goal
4. Overall Team Qualifications (Maximum 10 points)
Less than 2 sample projects 1
Max
a. Previous team collaboration 2 to 4 sample projects 2
= 3
More than 4 sample projects 3
b. OSU Sustainability Standards or LEED** project LEED v4.0 or v4.1 projects 0 Max
experience OSU Sustainability Standards projects 2 = 2
Training and knowledge 0 Max
c. BIM project experience
Direct project experience 3 = 3
Clarity of responsibility / communication
d. Team organization 0 - 2
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
Past performance as indicated by
a. Previous team performance 0 - 10
evaluations and letters of reference
Less than 2 projects 0 - 3
b. Experience with similar projects / delivery methods 2 to 6 projects 4 - 6
More than 6 projects 7 - 10
Performance in completing projects within
c. Budget and schedule management 0 - 5
original construction budget and schedule
Less than 3 projects 0 - 1
d. Knowledge of Ohio Capital Improvements process 3 to 6 projects 2 - 3
More than 6 projects 4 - 5
* Must be comprised of professional design services consulting firm(s) and NOT the lead firm - For more
information on scoring this and other criteria refer to Document F199-01 - PS Selection Rating Rubric. Subtotal
** Leadership in Energy & Environmental Design administered by Green Building Certification Inc.
Notes: Evaluator:
Name
Signature Date
F110-02-2024-OCT Publish Date: 9/21/2026 Page 5 of 5

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Education Basic Renovations A/E N/A N/A TBD Request for Qualifications (Registered Design Professional... ...

Ohio Facility Construction Commission

Bid Due: 11/06/2026

...Renovation Department Dept Of Public Recreation Type Invitation to Bid (ITB) Issue Date ...

City of Cincinnati

Bid Due: 10/21/2026

...TK26SEP30 Lakeland Community College Breakers Food Service Renovation Kirtland/Lake SOL DOCs TBD...

Ohio Facility Construction Commission

Bid Due: 10/23/2026

...RENOVATION Requesting Department FACILITIES MANAGEMENT DIVISION Expiry Date Time (ET) 10/30/2026, 1..., October ...

City of Columbus

Bid Due: 10/30/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.