| Location: | Georgia |
|---|---|
| Posted: | Jun 27, 2025 |
| Due: | Jul 30, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-33552-NONST-2025-000000010 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-33552-NONST-2025-000000010 | PEACH COUNTY WATER INFRASTRUCTURE IMPROVEMENTS | Fort Valley Utility Commission |
Jun 27, 2025 @ 12:13 PM
|
Jul 30, 2025 @ 10:00 AM
|
Start Date: Jun 27, 2025 @ 12:13 PM ET
End Date:
Jul 30, 2025 @ 10:00 AM ET
The Fort Valley Utility Commission (FVUC) is seeking Sealed proposals for the construction of new water supply wells, elevated water storage tank, water treatment plants, and water mains located along Fulwood Road and River Road in Peach County, GA. Sealed Proposals will be accepted at the Fort Valley Utility Commission, in the Meeting Room, 500 Anthoine Street, Fort Valley, Georgia 31030 until 10:00 AM, July 30, 2025, atwhich time they will be opened publicly. Peach County Water Infrastructure Improvements: River Road Water Treatment Plant and InterconnectionThe scope of work in Division I includes construction of a new water treatment plant along River Road in Peach County, GA. Work shall consist of permitting, clearing, grassing, earthwork, grading, erosion control, gravel access road, landscaping, fencing, painting, chemical treatment equipment, equipment building, electrical components, SCADA, piping, fittings, valves, and all necessary material, labor, and appurtenances associated with a new water treatment plant as shown on the plans and in the specifications. This work also includes the interconnection between the existing 18¿ raw water main and the existing 8¿ water main, including all necessary material, labor, and appurtenances. The scope of work in Division II includes construction of a new water treatment plant, one(1) new 1,500 gallon per minute (GPM) potable water supply well adjacent to GA Hwy 49/PeachParkway in Peach County, GA. -one (1) new 1,500 GPM gravel-packed well, wellhead piping, well building,connection to elevated storage tank, paintingA Pre¿Bid Meeting will be held on Wednesday, July 16, 2025, at 10:00 A.M. at the Fort Valley Utility Commission, in the Meeting Room, 500 Anthoine Street, FV, Georgia 31030. Following the Pre¿Bid Conference will be a visit to the Project site. The Pre¿Bid Conference is not mandatory for the potential Bidders. All prospective bidders are encouraged to attend. Last day JULY 23 2025 AT 5PM
| Code | Description |
| 95115 | Infrastructure and Infrastructure Improvements |
| 96891 | Water Supply Analysis, Infrastructure Analysis, Water Quality Analysis, and Long Term Planning |
Tara Giles
tgiles@fvutil.com
478-825-7701 ext 250

With GovernmentContracts, you can:
...SCADA System Upgrades Fort Valley Utility Commission May 22, 2026 @ 10:38 AM ...
State Government of Georgia
Bid Due: 6/19/2026
...FVUC SCADA SYSTEM REPLACEMENT PROJECT Fort Valley Utility Commission May 15, 2026 @ ...
State Government of Georgia
Bid Due: 6/12/2026
...RFPQ 26040 Water Treatment Facilities SCADA & PLC Upgrade & Integration Athens-Clarke... SCADA ...
State Government of Georgia
Bid Due: 6/09/2026
...26-010 SCADA System Equipment Upgrade for Water System Flowery Branch, City Of May ...
State Government of Georgia
Bid Due: 6/30/2026