| Location: | District of Columbia |
|---|---|
| Posted: | Sep 10, 2025 |
| Due: | Oct 14, 2025 |
| Agency: | Metropolitan Washington Airports Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB-25-24751 |
| Publication URL: | To access bid details, please log in. |
IFB-25-24751: Apron W Glycol Recovery System Rehabilitation, IAD
NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment, & supervision to provide turnkey construction for the Rehabilitation of the existing Glycol Recovery & Disposal System serving Apron W Deicing Pad at Washington Dulles International Airport (IAD). Work includes but not limited to the selective demolition, cast-in-place concrete, core drilling, installation of an Aeration blower package, installation of chemical dosing, installation of FRP baffle wall and columns, installation of a new siemens EMCS/Control Panel and modifications to the existing control panels in the Apron W Glycol Control Building and EMCS Panel in the glycol recycle building, provide a permanent pre-engineered gantry, miscellaneous mechanical, electrical, instrumentation, and control improvement, and provide start-up system commissioning and training to service personnel.
Solicitation Issue Date: September 10, 2025
Due Date for Submissions: October 14, 2025
Amendments Issued: None
SLBE Requirement: 25%
Additional Information - See in MWAA Contract Lifecycle Management System

With GovernmentContracts, you can: