| Location: | Maryland |
|---|---|
| Posted: | Apr 24, 2026 |
| Due: | May 20, 2026 |
| Agency: | Washington County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PUR-1786 Addendum 1 |
| Publication URL: | To access bid details, please log in. |
Bid Information
| Type | Invitation to Bid |
| Status | Issued |
| Number | PUR-1786 Addendum 1 (Washington County Office Building Roof Repair) |
| Issue Date & Time | 4/22/2026 11:16:44 AM (ET) |
| Close Date & Time | 5/20/2026 02:00:00 PM (ET) |
| Question Cut Off Date | 5/6/2026 04:00:00 PM (ET) |
| Notes |
Bidders shall be required to provide a Bid Bond, a Performance Bond, and a Labor and Material Bond.
All Bidders shall submit their list of subcontractors within 48 hours of Bid submission to the Washington County Purchasing Department. No change or deviation from this list shall be allowed except as determined by the Owner or the Owner’s Representative.
A site tour will be held immediately following the Pre-Bid Conference.
|
| Name | Lisa Brown Procurement Technician |
| Address |
100 West Washington Street
Hagerstown, MD 21740 USA |
| Phone | |
| Fax | |
| lbrown@washco-md.net |
| Document name | Format | ||
|
|||
|
Bid Invitation
|
Acrobat / PDF | BINVAVL | 9329167 |
| File Name | Description | File Size | ||
|
||||
|
(1) PUR-1786 33-35 Roof Replacement Final.pdf
|
Roof Replacement Document | 640 KB | 346038 | 7357930 |
|
(2) Cover and Index Final.pdf
|
Cover and Index | 199 KB | 346038 | 7357931 |
|
(3) Div 00 Conditions of the Contract.pdf
|
Conditions of the Contract | 82 KB | 346038 | 7357932 |
|
(4) Div 01 General Requirements.pdf
|
General Requirements | 331 KB | 346038 | 7357933 |
|
(5) Div 02 Existing Conditions.pdf
|
Existing Conditions | 130 KB | 346038 | 7357934 |
|
(6) Div 04 Masonry.pdf
|
Masonry | 210 KB | 346038 | 7357935 |
|
(7) Div 05 Metals.pdf
|
Metals | 173 KB | 346038 | 7357936 |
|
(8) Div 06 Wood, Plastic and Components.pdf
|
Wood, Plastic and Components | 162 KB | 346038 | 7357937 |
|
(9) Div 07 Thermal and Moisture Protection.pdf
|
Thermal and Moisture Protection | 482 KB | 346038 | 7357938 |
|
(10) Div 09 Finishes.pdf
|
Finishes | 131 KB | 346038 | 7357939 |
|
(11) Div 022 Plumbing.pdf
|
Plumbing | 201 KB | 346038 | 7357940 |
|
(12) Div 023 Mechanical.pdf
|
Mechanical | 144 KB | 346038 | 7357941 |
|
(13) 00 10 00 Directory Final.pdf
|
Directory | 93 KB | 346038 | 7357942 |
|
(14) 00 30 00_1 AIA Doc A701.pdf
|
AIA Document | 1.16 MB | 346038 | 7357943 |
|
(15) 00 40 00 Supplemental Conditions Final.pdf
|
Supplemental Conditions | 177 KB | 346038 | 7357944 |

With GovernmentContracts, you can:
..., and select MEP). The 2nd phase will consist of Surveying, SOE, Structural ...
Maryland Stadium Authority
Bid Due: 6/17/2026
...on the following bid packages: 02A Demolition 04A Masonry 09A Drywall and General ...
Maryland Stadium Authority
Bid Due: 6/05/2026