Bid No. NA-2024-012 Phase 3 Senior Center Improvements
| Location: |
Massachusetts |
| Posted: |
Sep 25, 2024 |
| Due: |
Oct 23, 2024 |
| Agency: |
Commonwealth of Massachusetts |
| Type of Government: |
State & Local |
| Category: |
- Y - Construction of Structures and Facilities
|
| Solicitation No: |
BD-19-1371-OCD-OCD-107884 |
| Publication URL: |
To access bid details, please log in. |
Bid Solicitation: BD-19-1371-OCD-OCD-107884
|
|
Header Information
|
|
Bid Number:
|
BD-19-1371-OCD-OCD-107884
|
Description:
|
Bid No. NA-2024-012 Phase 3 Senior Center Improvements
|
Bid Opening Date:
|
10/23/2024 10:30:00 AM
|
|
Purchaser:
|
Michael Nuvallie
|
Organization:
|
City of North Adams
|
|
Department:
|
OCD - Community Development
|
Location:
|
OCD - City Hall
|
|
Fiscal Year:
|
19
|
Type Code:
|
|
Allow Electronic Quote:
|
Yes
|
|
Alternate Id:
|
|
Required Date:
|
09/25/2024
|
Available Date
:
|
09/25/2024 12:00:00 PM
|
|
Info Contact:
|
Michael F. Nuvallie, Director OCD at 413-662-3000 x-3227
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
Wed; 10/09/24 at 10:30 at the senior center situate at 116 Ashland Street, as hosted by the architectural design firm, Clark-Green+BEK of Great Barrington, MA (Steve McAlister, 413-528-5100)
|
|
Bulletin Desc:
|
Interior renovations to kitchen, bathrooms and basement. Installation of a new storefront system at the side entrance. Renovation of existing ramp and stair surfaces and handrails. Replacement of panels at exterior soffits and installation of new metal flashing. Exterior improvement, including a new exterior deck, a new concrete sidewalk, fencing, and plantings. The total number of days to Final Completion is set at two hundred ten
|
|
|
Ship-to Address:
|
Mike Nuvallie
10 Main Street
North Adams, MA 01247
US
Email: ocd@northadams-ma.gov
Phone: (413)662-3000 Ext. 3227
|
Bill-to Address:
|
|
Print Format:
|
Bid Print
|
|
Required Quote Attachments
|
|
|
|
Item # 1:
(
72-13
-
00
)
|
The Project consists of: Interior renovations to kitchen, bathrooms and basement. Installation of a new storefront system at the side entrance. Renovation of existing ramp and stair surfaces and handrails. Replacement of panels at exterior soffits and installation of new metal flashing. Exterior improvement, including a new exterior deck, a new concrete sidewalk, fencing, and plantings. The total number of days to Final Completion is set at two hundred ten (210) days. One filed Sub-bid for Painting. Technical questions go to the architect, CGB at 413-528-5100.
|
|
U N S P S C Code:
|
72-13
-
00
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|
|
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...HOLYOKE INVITATION FOR BIDS (IFB) IFB NO. 2026-58 Annex Painting 4 th Floor ...
City of Holyoke
Bid Due: 6/30/2026
...HOLYOKE INVITATION FOR BIDS (IFB) IFB NO. 2026-58 Annex Painting 4 th Floor ...
City of Holyoke, MA
Bid Due: 6/30/2026
...replacement, flooring, doors, ceiling refinishing, painting and code compliance. The selected contractor..., bathroom ...
Commonwealth of Massachusetts
Bid Due: 6/18/2026
..., kitchen replacement, bathroom replacement, flooring, doors, ceiling refinishing, painting and code... if ...
Cambridge Housing Authority
Bid Due: 6/18/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.