| Location: | Florida |
|---|---|
| Posted: | Nov 12, 2026 |
| Due: | Nov 26, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | HARBSS-2027-01 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
AMENDMENT 1
The purpose of this amendment is to add Attachment 3 Spec 26 41 01.0010 Lightning Protection System
-----------------------------------------------------------------------------------------------------------
Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support
Notice Type: Sources Sought / Market Research
Notice Number: HARBSS-2027-01
Contracting Office: 482d CONF/PK
Location of Performance: Homestead Air Reserve Base, Florida
Response Due Date/Time: November 26, 2026, 5:00 PM EST
Response Submission: Nika Salemi, nika.salemi.2@us.af.mil
Proposed NAICS Code: 236220, Commercial and Institutional Building Construction
Proposed Product Service Code (PSC): 5670 Building Components, Prefabricated
1. Notice Purpose
THIS IS A SOURCES SOUGHT NOTICE ISSUED FOR MARKET-RESEARCH AND PLANNING PURPOSES ONLY. THIS NOTICE IS NOT A SOLICITATION, REQUEST FOR PROPOSAL, REQUEST FOR QUOTATION, INVITATION FOR BID, OR COMMITMENT BY THE GOVERNMENT TO AWARD A CONTRACT.
The 482d Contracting Flight, Homestead Air Reserve Base (HARB), FL, seeks information from capable commercial sources, including all small-business socioeconomic categories, to determine the availability and capability of firms that can perform the requirement described in Attachment 1 KYJM19-9003 Outdoor Fitness SOW, Red Horse Project, 12 Nov 2026. Responses will be used to support acquisition planning, including consideration of the appropriate contract type, acquisition approach, and potential small-business set-aside strategy.
The Government will not reimburse respondents for any costs associated with preparation or submission of information in response to this notice. A response to this notice is not required to respond to a future solicitation, if issued. Any future solicitation will be announced separately.
2. Requirement Overview
The 482d Contracting Flight, Homestead Air Reserve Base (HARB), FL is conducting market research for the Outdoor Fitness Facility, Building 389 project at Homestead Air Reserve Base (HARB), Florida.
The anticipated requirement is primarily for the procurement, delivery, and associated submittals for construction materials and equipment required to support construction of an outdoor fitness facility. Air Force RED HORSE personnel will perform the majority of construction and installation activities. Contractor installation responsibilities are limited principally to the steel picket fence and, if applicable, a separate lightning-protection system.
The contractor would be expected to:
The provided BOM identifies, among other materials and equipment, rubber fitness flooring, concrete masonry materials, electrical distribution materials, outdoor fans, motion-activated lighting, concrete, base course, PEB-related items, and construction-equipment rentals.
3. Anticipated Scope
3.1 Material Procurement and Delivery
The contractor shall be capable of procuring, delivering, and warranting the materials and equipment identified in the Government-furnished BOM. The contractor shall provide required material and equipment submittals before ordering materials, and the Government will approve final submittals in writing before purchase.
Anticipated submittals include:
3.2 Pre-Engineered Building Package
The contractor shall be capable of providing a complete PEB material package based on Government design drawings, including digitally signed and sealed shop drawings prepared by a Professional Engineer.
The PEB package is expected to include, at a minimum:
The PEB shall be designed in accordance with the SOW’s specified structural and high-velocity-wind requirements. The SOW requires a minimum 20-year material warranty, a current Miami-Dade Notice of Acceptance for the PEB and insulation, and a roof assembly capable of the stated uplift and wind criteria. Zinc-plated metal is prohibited.
3.3 Lightning Protection System — Conditional Installation
If a compliant PEB with built-in lightning protection is unavailable, the contractor shall be capable of furnishing and installing a conventional lightning-protection and grounding system following completion of RED HORSE construction activities.
The contractor’s capability should include:
3.4 Steel Picket Fence Installation and Site Restoration
The contractor shall be capable of furnishing and installing a steel picket fence around the outdoor-fitness-facility overhang structure. The fence must be located at least five feet from the roof overhang and include an accessible, lockable gate/door.
The fence-related scope includes required access and equipment doors, hardware, and restoration of disturbed areas using St. Augustine sod.
3.5 Construction Equipment
The contractor shall be capable of furnishing the construction equipment identified in the BOM for the stated rental periods or project duration. Anticipated equipment includes a 12,000-pound telehandler forklift, skid loaders with buckets and forks, a water truck, scissor lifts, straight-track manlifts, a double-drum roller, a mini excavator with hammer, a dump truck, and concrete forms with pins.
Equipment shall be delivered to the project site, fueled, and ready for operation. The contractor will not be responsible for subsequent refueling unless otherwise established in a future solicitation.
3.6 Installation Access and On-Site Requirements
Potential sources should be capable of working on an active military installation and complying with applicable installation access, identification, safety, security, and operations-security requirements.
For contractor-performed installation work, the contractor must be capable of providing an English-fluent site superintendent who remains on site during contract performance. Excavation, if required, will require coordination and permits before work begins; the SOW specifies that permit requests must be submitted at least three weeks before excavation.
Normal anticipated work hours for fence installation are 0730–1630, Monday through Friday, excluding Federal holidays, unless alternate hours are approved in writing.
4. Requested Capability Statement Information
Interested firms should submit a capability statement of no more than 10 pages, excluding product literature and certifications. Responses should address the following:
5. Response Instructions
Submit responses via email to nika.salemi.2@us.af.mil no later than 5:00 PM EST on November 26, 2026.
Use the following subject line:
Sources Sought Response – Outdoor Fitness Facility B-389 – [Company Name] Email X of X (insert number of the email and total number of emails)
Do not submit classified information. If a respondent believes its submission contains proprietary information, the respondent shall clearly identify the specific proprietary portions of its submission.
6. Government Reservation of Rights
This Sources Sought notice is issued solely for planning and market-research purposes. The Government may use information received in response to this notice to refine the requirement, determine the appropriate acquisition strategy, assess the availability of capable small-business concerns, and determine whether to issue a future solicitation.
The Government is not obligated to issue a solicitation or award a contract as a result of this notice. The Government may revise, cancel, or take no further action regarding this requirement.
7. System for Award Management
Firms are encouraged to provide their SAM registration status and expiration date with their response. While SAM registration is not required to submit a response to this Sources Sought notice, any firm submitting an offer or quotation under a future solicitation must be registered in the System for Award Management at the time required by the applicable solicitation and Revolutionary FAR Overhaul requirements.

With GovernmentContracts, you can:
Notice: 31366713 Notice of Bid/Request for Proposal Division: Florida Sheriffs Association View Notice
Florida Department of State
Bid Due: 3/01/2027
Follow Fiscal Year (FY) 2027 Florida Panhandle Optimized Remediation Contract (ORC) and Military
DEPT OF DEFENSE
Bid Due: 12/18/2026
Follow Request for Information - Potential Research and Technology Partnership Opportunities Active Contract
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Bid Due: 11/20/2026
Follow Replace Elevators at FDC Miami Active Contract Opportunity Notice ID 15BBNF26Q31000001 Related
JUSTICE, DEPARTMENT OF
Bid Due: 12/03/2026