HVAC Repair by Replacement - 147th MSG
| Location: |
Texas |
| Posted: |
Sep 23, 2026 |
| Due: |
Sep 24, 2026 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- Z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No: |
W50S7726Q1CKX |
| Publication URL: |
To access bid details, please log in. |
HVAC Repair by Replacement - 147th MSG
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
NATIONAL GUARD BUREAU
Sub Command
JFHQ USPFO TX
Sub Command 2
USPFO TX PROCUREMENT
Office
W7N2 USPFO ACTIVITY TXANG 147
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
-
Updated Published Date: Sep 23, 2026 09:10 am CDT
-
Original Published Date: Sep 15, 2026 11:54 am CDT
-
Updated Date Offers Due: Sep 24, 2026 10:00 am CDT
-
Original Date Offers Due: Sep 22, 2026 10:00 am CDT
-
Inactive Policy: 15 days after date offers due
-
Updated Inactive Date: Oct 09, 2026
-
Original Inactive Date:
Oct 07, 2026
-
Initiative:
Classification
-
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
-
-
Product Service Code: Z2NB - REPAIR OR ALTERATION OF HEATING AND COOLING PLANTS
-
NAICS Code:
-
238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Houston
,
TX
77034
USA
Description View Changes
Amendment 00001
-
Is temporary cooling required? There will be a temporary chiller, coordination when this needs to be removed for the permanent will need to be coordinated with CE.
-
Is new electrical conductors required from the disconnect to the new unit.? Contractor to see SOW section 3 and 5.
-
Is flexible weather resistant conduit approved for any electrical work need to be performed for the chiller replacement? All installs shall be per NEC and Local Code. The contractor shall submit the proposed raceway type and intended installation location for Government review before installation.
-
Is a new wye strainer going to be required to prevent partials from the existing system from entering the new chiller? The contractor shall field verify whether a serviceable strainer is already installed upstream of the chiller and confirm the replacement chiller manufacturer’s filtration requirements.
-
Is a new check valve going to be required at the new chiller? The contractor shall verify the existing piping arrangement and the manufacturer’s requirements for the dual VFD pump package.
A check valve shall be provided if required to:
-
Prevent reverse flow through the chiller
-
Protect the integral pump package
-
Prevent flow through an inactive chiller
-
Maintain proper system hydraulic operation
-
Comply with the manufacturer’s installation diagram
If a new check valve is necessary, the contractor shall submit the proposed valve type, size, location, pressure rating, and pressure-drop information for Government review and written authorization.
-
Does the base have a designated controls contractor they are currently working with? TekPlan
-
Is the chiller currently on a BAS system ? Yes
-
Is the chiller currently running just off of local controls? Yes, but will be integrated into the DDC system.
-
Is there a certain percentage of glycol that needs to be blended into the system? The current system is not glycol. Before filling the new chiller, the contractor shall sample and test the existing chilled-water solution to determine whether glycol is present and document its existing concentration and condition. The contractor shall also review the replacement chiller manufacturer’s freeze-protection and water-quality requirements.
-
Is the base going to assure that the chiller can isolated with having to drain the whole system? Contractor to field verify.
-
If the base is going to require temporary cooling is there going to be chiller isolation valves added? Yes, Temporary chilling will be required as stated, isolation valves will be contractor responsibility to meet the requirements.
1. Are Press fittings permitted: Press fittings are not permitted
Please see attachments for changes. All changes were higlighted in Red.
This is a combined synopsis/solicitation for HVAC Repair by Replacement. Please see all attached documents.
Attachments/Links
Contact Information
Contracting Office Address
-
KO FOR TXANG DO NOT DELETE 14667 SNEIDER ST BLDG 12
-
HOUSTON , TX 77034-5586
-
USA
Secondary Point of Contact
History
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...Project: VALVE CHECK 1/4""npt FEMALE MA | 2101115 Ref. #: 2101115 Type: RFQ ...
Dallas Area Rapid Transit
Bid Due: 9/30/2026
...Booster Pump System, which includes new pumps, motors, valves, DI piping and PVC ...
City of League City
Bid Due: 10/01/2026
..., valves, & associated fittings, pressure blasting and coating of existing wet well, ...
City of League City
Bid Due: 9/30/2026
..., replacement of all pumps, piping, valves, and hardwired control panels, and installation ...
JUSTICE, DEPARTMENT OF
Bid Due: 10/13/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.