| Location: | North Carolina |
|---|---|
| Posted: | Feb 26, 2025 |
| Due: | Mar 14, 2025 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 70Z04725RPCNI0001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Amendment 0008 for Solicitation 70Z04725RPCNI0001 - Additional Clauses Updates
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1.
Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf. The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).
Option Item 0001: RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade. New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.

With GovernmentContracts, you can:
...- Rigging, Orchestra Shell and Lighting - BP116143 & 116144 - Theater Drapery ...
North Carolina State University
Bid Due: 6/12/2026