| Location: | Florida |
|---|---|
| Posted: | Dec 11, 2024 |
| Due: | Jan 17, 2025 |
| Agency: | State Government of Florida |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFP-09897 |
| Publication URL: | To access bid details, please log in. |
| Code | Description |
| 72141001 | Highway and road new construction service |
| 72141002 | Highway and road sign or guardrail construction and repair service |
| 72141003 | Highway and road maintenance service |
| 72141103 | Highway and road paving service |
| 72141104 | Highway and road resurfacing service |
| 72141105 | Sidewalk construction and repair service |
| 72141107 | Bridge construction and repair service |
| 72152705 | Sidewalk or ramp construction service |
The following link is to our new bidding platform, hosted by PlanetBids™, where you can find the bid documents: BID LINK HERE.
The scope of work for the 2025 Milling & Resurfacing Pavement Program includes, but is not limited to:
Osceola Parkway from BVD to World Drive milling & resurfacing includes milling depths ranging from 4” to 1.5” and shall utilize the following asphalt courses: SP Structural (Traffic E) (PG76-22), Friction Course FC-5 (PG 82-22) and Friction Course FC-12.5 (Traffic E) (PG82-22).
The guardrail requiring replacement, in order to meet updated guardrail specifications, span across the following locations: northbound and southbound World Drive corridor, east and westbound Epcot Center Drive and as well as east and westbound Osceola Parkway. NOTE: The guardrail shall be bid as separate bid alternates with cost broken out for each run as described in Division 1 Specification Section 1100, as well as noted in the bid form and Table 1.
Existing guardrail shall be removed, miscellaneous asphalt pad removed and new asphalt replaced and rolled in prior to new guardrail installation. All removed guardrail runs shall be replaced within the same shift, or will otherwise need barrier wall installed to protect existing conditions (to be designed and submit as part of the Contractor’s TTC Plan).
Embankments adjacent to all guardrail pads shall be graded to meet required slopes. Fill dirt may be required as needed. Some minor curb and gutter replacement work, as well as tree clearing work is to be performed as noted in the plans.
Please direct all questions to:| Description | Date/Time |
| C006658 MFMP Bid Flyer | Dec 11, 2024, 10:59:50 PM |

With GovernmentContracts, you can:
...Project: Canal Clearing (Re-Bid) Ref. #: 35-ITB-26 Department: Procurement Type: ITB Status: Open... ...
City of Palm Bay
Bid Due: 6/23/2026
...to perform litter and debris removal; mowing; edging; line trimming; blowing; tree pruning; ...
City of Jacksonville
Bid Due: 6/05/2026
...required to perform litter and debris removal; mowing; edging; line trimming; blowing; tree ...
City of Jacksonville
Bid Due: 6/05/2026
...required to perform litter and debris removal; mowing; edging; line trimming; blowing; tree ...
City of Jacksonville
Bid Due: 6/05/2026