| Location: | California |
|---|---|
| Posted: | Jun 15, 2026 |
| Due: | Jul 10, 2026 |
| Agency: | West County Wastewater |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Force Main Assessment Civil Work
Addenda: 1
Release Date: 6/15/2026
Due Date: 7/10/2026
West County Wastewater ("WCW") is accepting sealed bids via their e-Procurement Portal, ProcureNow until Friday, July 10, 2026 , 2:00 pm PST. Late submissions shall not be accepted.
WCW has contracted with Pressure Pipe Consulting Company (PPCC) to perform an inline assessment of the Tara Hill Force Main. The assessment will require launching and receiving a series (approximately 3) progressive pigs and one (1) diagnostic and mapping pig (probe). To perform this in line phase of the assessment, Civil work is required to install a Launch Barrel, install a Receive Barrel and remove a plug valve and replace it with a full port gate valve. By passes and line-stops will be required to perform this work. Additional scope to assess the pipe condition will also be performed by Electro Magnetic Thickness Testing. For the consultant to perform this exterior analysis phase of the condition assessment, potholing will need to be provided by the Civil Contractor to enable access to the crown of the pipeline. The civil work scope also includes assisting the assessment pigging/probe consultant to launch and retrieve the pigs and probe. The Civil Contractor will also be required to restore site conditions at the (3) locations where civil work is performed and at the location of potholes. The location of the proposed work sites are specified in the bid documents. The Civil Contractor will also assist Assessment Consultant by providing support with tasks to insert and retrieve pigs and probe and to supply supplemental water.
West County Wastewater (WCW) provides wastewater collection and treatment services to approximately 93,000 residents. WCW was created December 19, 1921, pursuant to authority of the State of California. Today, WCW operates as a political subdivision of the State of California as an independent special district. WCW's current political boundaries are comprised of the City of San Pablo, a portion of the City of Richmond, a portion of the City of Pinole and some unincorporated areas within western Contra Costa County.
WCW's system includes 249 miles of gravity sewer pipelines, 17 lift stations, 6 miles of pressurized force mains, and a water quality resource recovery plant with an NDPES permitted capacity of 12.5 million gallons per day (MGD).

With GovernmentContracts, you can:
...Follow Industrial Water Treatment Services Active Contract Opportunity Notice ID 36C26126Q0875... for industrial ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/17/2026
...Title Waste Water Treatment Management Services Provider Available Date 7/6/2026 2:00 PM... Description ...
Merced County
Bid Due: 8/04/2026
...Bid Number: 2026-06 Bid Title: Water Treatment Plant Filter Unit Rehabilitation 2026 Category... ...
City of Shasta Lake
Bid Due: 8/13/2026
...Water Treatment Plant Residual Solids Removal and Disposal Department: Operations, Finance....), hereby gives ...
El Dorado Irrigation District
Bid Due: 7/17/2026