Force Main Assessment Civil Work

Location: California
Posted: Jun 15, 2026
Due: Jul 10, 2026
Agency: West County Wastewater
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.


Project ID:

Title: Force Main Assessment Civil Work

Addenda: 1

Release Date: 6/15/2026

Due Date: 7/10/2026

Follow
Force Main Assessment Civil Work
Last updated by Addendum #1 on Jun 16, 2026 7:34 AM See what changed
Infrastructure and Planning
22 , 221 , 237 , 23711 , 237110 ... show all
Project ID: 26-IFB-029
Release Date: Monday, June 15, 2026
ยท Due Date: Friday, July 10, 2026 2:00pm
Posted Monday, June 15, 2026 12:57pm
All dates & times in Pacific Time
Draft Response Events RSVP No Bid24 days, 19 hours, 18 minutes


Post Information

Posted At:Mon, Jun 15, 2026 12:57 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

West County Wastewater ("WCW") is accepting sealed bids via their e-Procurement Portal, ProcureNow until Friday, July 10, 2026 , 2:00 pm PST. Late submissions shall not be accepted.

WCW has contracted with Pressure Pipe Consulting Company (PPCC) to perform an inline assessment of the Tara Hill Force Main. The assessment will require launching and receiving a series (approximately 3) progressive pigs and one (1) diagnostic and mapping pig (probe). To perform this in line phase of the assessment, Civil work is required to install a Launch Barrel, install a Receive Barrel and remove a plug valve and replace it with a full port gate valve. By passes and line-stops will be required to perform this work. Additional scope to assess the pipe condition will also be performed by Electro Magnetic Thickness Testing. For the consultant to perform this exterior analysis phase of the condition assessment, potholing will need to be provided by the Civil Contractor to enable access to the crown of the pipeline. The civil work scope also includes assisting the assessment pigging/probe consultant to launch and retrieve the pigs and probe. The Civil Contractor will also be required to restore site conditions at the (3) locations where civil work is performed and at the location of potholes. The location of the proposed work sites are specified in the bid documents. The Civil Contractor will also assist Assessment Consultant by providing support with tasks to insert and retrieve pigs and probe and to supply supplemental water.



Background

West County Wastewater (WCW) provides wastewater collection and treatment services to approximately 93,000 residents. WCW was created December 19, 1921, pursuant to authority of the State of California. Today, WCW operates as a political subdivision of the State of California as an independent special district. WCW's current political boundaries are comprised of the City of San Pablo, a portion of the City of Richmond, a portion of the City of Pinole and some unincorporated areas within western Contra Costa County.

WCW's system includes 249 miles of gravity sewer pipelines, 17 lift stations, 6 miles of pressurized force mains, and a water quality resource recovery plant with an NDPES permitted capacity of 12.5 million gallons per day (MGD).



Timeline

Release Project Date:
June 15, 2026
Pre-Bid Meeting (Mandatory):
June 23, 2026, 10:00am
2250 Tara Hills Dr. San Pablo CA, 94806
Question Submission Deadline:
June 26, 2026, 5:00pm
Question Response Deadline:
July 2, 2026, 5:00am
Proposal Submission Deadline:
July 10, 2026, 2:00pm
Notice to Proceed (Tentative):
July 27, 2026
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Bid Details WD-2922A 8-inch Ductile Iron Water Main Replacement on Lincoln Way and ...

San Francisco Public Utilities Commission

Bid Due: 8/06/2026

...Project ID: 2026-IFB-LM-0221 Title: Installation of Ductile Iron Water Mains in Villa Street... ...

City of Pasadena

Bid Due: 7/21/2026

...POTABLE WATER SEPARATION FOR " JAMACHA FORCE MAIN AND GRAVITY MAIN SEWER IMPROVEMENTS ...

County of San Diego

Bid Due: 8/13/2026

...on-going water main replacement, seismic improvements, water service and hydrant replacements... of transmission ...

City of Palo Alto

Bid Due: 8/07/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.