Four Rivers Sanitation Authority
ses Rockford, Illinois
ing purpo Bidding Requirements and Contract Forms
or bidd for
e used f Scum Separator Building
b HVAC and Roof Replacement
Not to Capital Project No. 2502
Bid Doc. No. 26-412
Four Rivers Sanitation Authority
Rockford, Illinois
Bidding Requirements and Contract Forms
s and
e General Provisions and Technical Specifications
s for
o Sanitary Sewer Construction
rp for
HVSAcuCmaSnedpRaroaotfoRr eBpudlaiilcndeigmngpenut Capital Project No. 2502
bid Board of Trustees
r Richard Pollack
fo Ben Bernsten
Richard Mowris
d Ginger Haas
e Brad Long
. . . . . . . . . . . . . . . . . . President
. . . . . . . . . . . . . . . . . . Vice President
. . . . . . . . . . . . . . . . . . Clerk/Treasurer
. . . . . . . . . . . . . . . . . . Trustee
. . . . . . . . . . . . . . . . . . Trustee
e us Official
b Christopher T. Baer, PE . . . . . . . . . . . . . . . . . . Executive Director
Not to Matthew L. Campbell, PE . . . . . . . . . . . . . . . . . . Director of Engineering
Bid Doc. No. 26-412
Table of Contents
I. Bidding Requirements
Article 1 Notice to Bidders
oses Article 2
Instructions to Bidders
1 General
2 Legal Requirements
3 General Instructions
ing purp Article 3
Detailed Specifications
01 10 00 Summary
01 33 00 Submittal Procedures
01 42 00 References
01 50 00 Temporary Facilities and Controls
01 60 00 Product Requirements
01 74 00 Cleaning and Waste Management
d 02 41 19 Selective Demolition
id 05 52 13 Metal Railings
b 07 01 50
r 07 54 23
o 07 62 00
f 07 72 33
d 07 84 13
Preparation for Re-Roofing
Thermoplastic Polyolefin Roofing
Metal Flashings
Roof Hatches
Penetration Firestopping
se 23 05 53
23 05 93
u 23 07 13
e23 09 23
23 09 31
b23 09 93
o 23 11 23
t 23 31 13
t 23 33 00
23 34 23
o 23 37 13
N 23 74 23
Identification for HVAC Ductwork and Equipment
Testing, Adjusting, and Balancing for HVAC
Duct Insulation
Direct Digital Control (DDC) System for HVAC
Temperature Instruments
Sequence of Operations for HVAC
Natural Gas Piping
Metal Ducts
Air Duct Accessories
HVAC Power Ventilators
Registers and Grilles
Packaged, Indirect-Fired, Outdoor, Heating-Makeup-Air Units
23 82 39 Suspended Unit Heaters
26 05 19
26 05 23
26 05 26
Low-Voltage Electrical Power Conductors and Cables
Control-Voltage Electrical Power Cables
Grounding and Bonding for Electrical Systems
Bid Doc. No. 26-412
Scum Separator Building HVAC and Roof Replacement
Capital Project No. 2502
26 05 29 Hangers and Supports for Electrical Systems
26 05 33 Raceways and Boxes for Electrical Systems
26 05 44 Sleeves and Sleeve Seals for Electrical Raceways
26 05 53 Identification for Electrical Systems
26 28 16 Enclosed Switches and Circuit Breakers
s II. Contract Forms
e Proposal
s Fair Employment Practices Affidavit of Compliance
Bid Bond
o Agreement
p Labor & Material Payment Bond
r Performance Bond
pu III. Exhibits
FRSA Plant Site Map
ing IV. General Provisions and Technical Specifications for Sanitary Sewer
Not to be used for bidd Construction (separate document incorporated by reference)
Bid Doc. No. 26-412
Table of Contents / Page 2 of 2
Not to bBeidudsinegSdeRfcoetiqorunbirIiedmdeinntsg purposes
Bid Doc. No. 26-412
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.