Santa Margarita River Levee System Repair, Marine Corps Air Station Camp Pendleton, CA

Location: California
Posted: Feb 9, 2026
Due: Mar 3, 2026
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: W912PL26S0005
Publication URL: To access bid details, please log in.
Follow
Santa Margarita River Levee System Repair, Marine Corps Air Station Camp Pendleton, CA
Active
Contract Opportunity
Notice ID
W912PL26S0005
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION SOUTH PACIFIC
Sub Command 2
ENDIST LOS ANGELES
Office
W075 ENDIST LOS ANGELES
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Sources Sought (Updated)
  • Updated Published Date: Feb 09, 2026 02:28 pm PST
  • Original Published Date: Feb 09, 2026 01:56 pm PST
  • Updated Response Date: Mar 03, 2026 04:30 pm PST
  • Original Response Date: Mar 03, 2026 04:30 pm PST
  • Inactive Policy: Manual
  • Updated Inactive Date: Aug 09, 2026
  • Original Inactive Date: Aug 09, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    Camp Pendleton Marine Corps Base, CA 92055 92055
Description View Changes
SOURCES SOUGHT NOTICE: Santa Margarita River Levee System Erosion/Scour Protection Marine Corps Air Station Camp Pendleton, CA. This is a SOURCES SOUGHT announcement for market survey information only, it will be used by this agency for preliminary planning purposes. No contract will be awarded from this notice. No reimbursement will be made for any costs associated with providing information in response to this notice or any follow up information requests. (Respondents will not be notified of the results of the evaluation). The purpose of this Sources Sought Notice is to gain knowledge of the experience and qualification of the various members of the construction industry, including Large Business concerns, Small Business concerns, HUBZone, 8(a), Women-owned, Economically Disadvantage Women-owned, and Service-Disabled Veteran owned firms. The Government strives to ensure that there is adequate competition among the potential pool of available contractors. The type of set-aside decision will depend upon the public?s response to this notice. The Government is seeking to identify qualified sources either singularly or as part of an assembled team under North American Industry Classification System (NAICS) code 237990, Other Heavy and Civil Engineering Construction, which has a small business size standard of $36,500,000.00.Project Description: In accordance with FAR 36.204, and DFARS 236.204, the estimated construction price range for each project is between $100,000,000 and $250,000,000.00. The estimated total contract performance period is 1096 calendar days. Location of this work is Camp Pendleton, San Diego County, CAThe original levee was constructed in response to the 1993 flood that caused disastrous damages to infrastructure, aircraft, support equipment and suspended crucial national security Marine Corps aviation operations. The existing SMR Levee system was constructed between 1998 to 2001 as an emergency response after the 1998 flood event. Since construction completion of the levee system, maintenance of the levee and its appurtenances have been minimal. As a result, the waterside and some sections of the landside of the levee system exists with heavy vegetation and tree overgrowth that appears to impact the levee. The SMR levee system is approximately 3 miles long with 3 segments, i.e., West Segment, Air Station Segment, and East Segment, (Figure 1) and two project features, i.e., Floodwall and the Pump Station. The SMR levee system was constructed with 1:1 (Horizontal: Vertical) gradient embankment slopes comprised of either all soil-cement or a combination of geogrid reinforced earth and a soil cement shell on the riverside of the levee and crown. The Flood Wall project feature is a reinforced-concrete cantilevered retaining wall, approximately 21 feet high, and approximately 0.5 miles long. At the riverside of the levee, a stone revetment was placed at the toe of the embankment and flood wall to protect against erosion and scour. At the landside of the embankment, a toe berm was constructed and a subdrain system was installed at the toe. The levee is owned, operated, and maintained by MCAS Camp Pendleton. Proposed anticipated repairs to the Santa Margarita River System include the following: a) A levee raise to increase height about 2.5-4.5 feet vertical in the levee profile downstream of the Basilone Bridge and at the East Levee segment with soils Cement, this includes a stability berm approximately 3 feet vertical by 10 feet along at the east levee for about ~1100 feet long. A borrow site is identified about a mile away for soils cement use. It is anticipated that approximate 50K cubic yards of materials will be used for soil cement and general fill materials. An onsite soils cement batch plant will be required. b) Installation of several relief wells on the Air Station Segment. c) Replace and install a new toe drain and or abandoned existing toe drain along the interior of the levee system. d) Construct a graded gravel filter ditch at the landside of the Air Station Segment and Floodwall. e) Scour and erosion mitigation measures for armoring the riverside of the entire levee system with Launch Stone with approximate 36-inch diameter graded stone. The launch stone would vary with approximately 5-8 feet high located at the riverside of the levee. f) The existing Floodwall Structural would be strengthened and improved by adding addition rebar and concrete. g) Existing cracks will be filled in with a cement grout mix with an expandable sealant to prevent future cracks. h) Project Maintenance Paths and Access. Several 10-12 feet wide maintenance paths and ramps will be constructed for access to the riverside and landside of the levee. i) A 15-foot-wide vegetation clearance pathway would be required from the proposed project features. j) Vegetation restoration within the temporary impact areas. k) NEPA and Environmental Compliance. l) Air Station Camp Pendleton Compliance and criteria. Prior Government contract work is not required for submitting a response to this sources sought notice. Interested firms should submit answers to the questions found attached to this presolicitation notice located in the PIEE solicitation module. Submissions are requested no later than 4:30 PST, Tuesday February 3, 2026. The submission should address all questions in the sources sought questionnaire. All interested firms must be registered in System for Award Management (SAM) to be eligible for award of Government contracts. No hard copy or facsimile submissions will be accepted. Cover letters and extraneous materials (brochures, etc.) will not be considered. Questions concerning submissions should be directed to Mr. Michael Robinson, Contract Specialist at Michael.G.Robinson@usace.army.mil. Personal visits for the purpose of discussing this announcement will not be scheduled. Emails or phone calls requesting personal visits will not receive a reply. An Industry Day is scheduled for March 10, 2026, at Camp Pendleton, San Diego County, California. Further details will be provided.
Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING DIVISION 915 WILSHIRE BLVD SUITE 1109
  • LOS ANGELES , CA 90017-3409
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Feb 10, 2026[Sources Sought (Updated)] Santa Margarita River Levee System Repair, Marine Corps Air Station Camp Pendleton, CA
Mar 3, 2026[Sources Sought (Updated)] Santa Margarita River Levee System Repair, Marine Corps Air Station Camp Pendleton, CA
Apr 6, 2026[Sources Sought (Updated)] Santa Margarita River Levee System Repair, Marine Corps Air Station Camp Pendleton, CA
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Install Water Softener and Hot Water Heaters at FCI Mendota Active Contract

JUSTICE, DEPARTMENT OF

Bid Due: 6/17/2026

Follow Repair ADM Baker Pool Complex Active Contract Opportunity Notice ID NAVMWR-26-R-0029 Related

DEPT OF DEFENSE

Bid Due: 6/05/2026

Project ID: MHC/039 Title: ATLAS (Access, Treatment, Linkage, and Stabilization): Integrated Children's Specialty

Sacramento County

Bid Due: 6/10/2026

CDBG 602748-25 - Sidewalk ADA Ramps Project (6-03-26) 1 Item(s)

City of Lawndale

Bid Due: 6/03/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.