PALMER HALL DUPLEX CONDENSATE TANK REPLACEMENT

Location: New York
Posted: Aug 19, 2025
Due: Aug 27, 2025
Agency: TRANSPORTATION, DEPARTMENT OF
Type of Government: Federal
Category:
  • N - Installation of Equipment
Solicitation No: 6923G225Q000014
Publication URL: To access bid details, please log in.
Follow
PALMER HALL DUPLEX CONDENSATE TANK REPLACEMENT
Active
Contract Opportunity
Notice ID
6923G225Q000014
Related Notice
Department/Ind. Agency
TRANSPORTATION, DEPARTMENT OF
Sub-tier
MARITIME ADMINISTRATION
Office
6923G2 DOT MARITIME ADMINISTRATION
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
  • Original Published Date: Aug 19, 2025 04:20 pm EDT
  • Original Date Offers Due: Aug 27, 2025 09:00 am EDT
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Sep 11, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: N045 - INSTALLATION OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
  • NAICS Code:
    • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
  • Place of Performance:
    Kings Point , NY 11024
    USA
Description

BACKGROUND

The United States Merchant Martine Academy (USMMA) is an agency of the Maritime Administration

(MARAD) managed by the United States Department of Transportation.

The USMMA is listed on the National Register of Historic Places. Therefore, all work shall be

consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties

(36 CFR part 68)

http://www.nps.gov/tps/standards/four-treatments/treatment-guidelines.pdf.

All work shall meet or exceed the standards provided in the Secretary of the Interior’s Standards

for Rehabilitation and guidelines for applying the standards published by the National Park

Service, U.S. Department of the Interior 36 CFR 67.7 - Standards for rehabilitation.

SCOPE

The USMMA seeks a qualified and experienced contractor to provide labor, material, transportation,

tools, equipment and supervision to perform a replacement of the steam condensate return tank and

pumps inside of the mechanical room of Palmer Hall. The

contractor will also replace the existing sump pump with a new two pump system and cover.



STATEMENT OF WORK

3

DELIVERABLES





The Contractor is responsible for the following;

Condensate return tank

1. Disconnect prewired unit control panel from duplex condensate tank.

2. Disconnect steam supply and condensate return lines from condensate tank.

3. Remove and replace duplex condensate return tank with contractor supplied new unit.

4. Replace all steam traps on condensate tank.

5. Replace all isolation valves for condensate tank.

6. Remove old discharge check valves and replace.

7. Reconnect and energize prewired unit control panel supplied with new condensate return tank.

8. All fittings, pumps, steam traps, and valves to be supplied as new from contractor.

9. Replacement of any pipe insulation and pipe hangers which require removal to complete any

repairs. All insulation shall be replaced with fiberglass pipe wrap or approved equal.

10. Leak checking and ensuring all installed piping and fittings are free from leaks.

Sump Pump

11. Remove drain piping to access sump pit cover and pump.

12. Remove existing pump and cover

13. Install new sump pump with a two-pump system that can handle high temperatures.

14. Install new cover that works with new system.

15. Reconnect to all existing branches.

16. All fittings, pumps, steam traps, and valves to be supplied as new.

17. Leak test.





Please see attached pictures



STATEMENT OF WORK

5

1. The contractor shall provide all labor and material, transportation and supervision in the

performance of all tasks detailed in this statement of work.

2. All work is to conform to federal, state and local regulations and codes.

3. Maintain a work area compliant with safety standards.

4. Areas worked on shall be cleaned and secured on a daily basis.

5. Any damage to existing facilities or appurtenances shall be repaired or replaced in kind, by the

contractor at no cost to the Government.



6. Examine existing conditions prior to any repair activities, site visit will be scheduled to

inspect the site where services are to be performed.



7. Excess material and debris shall be disposed of in accordance with local and state ordinances.



8. No vehicles shall be driven on the sidewalks or grass.



9. Make every effort to minimize the impact to the daily routine of the Academy.

CLOSE OUT:

The contractor shall provide a signed warranty of any damage, defective material and improper

workmanship on any material provided in this contract.

Materials and labor to be warranted for one year after installation, and equipment to be warranted

per manufacturer

SUBMITTALS

1. N/A

GOVERNMENT FURNISHED PROPERTY, MATERIAL, EQUIPMENT OR INFORMATION.

N/A

CONSIDERATIONS



STATEMENT OF WORK

6

• Maintain communication with the COR (and immediately inform the COR of any unforeseen issues or

problems that arise).

• Inform COR of any anticipated disruption in services for construction at least three (3) days in

advance



PLACE OF PERFORMANCE



Contractor will perform the task at located at the USMMA, 300 Steamboat Road, Kings Point,

N.Y. 11024



PERIOD OF PERFORMANCE



Work is to be completed within 90 calendar days after NTP is approved. Work is to be performed

during normal business hours 0700 to 1630, Monday through Friday unless approval is granted by the Contracting Officer.



Appplicable wage determination WD# 2015-4157 Rev# 29, dated 7/8/2025



Please see attached SCOPE OF WORK along with pictures


Attachments/Links
Contact Information
Contracting Office Address
  • USMMA PROCUREMENT 300 STEAMBOAT ROAD
  • KINGS POINT , NY 11024
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Aug 19, 2025 04:20 pm EDTCombined Synopsis/Solicitation (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Feedwater pumps and associated equipment including motors, bases, valves, piping modifications, controls.... Contractor ...

The City of New York

Bid Due: 7/09/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.