| Location: | California |
|---|---|
| Posted: | Nov 25, 2025 |
| Due: | Dec 5, 2025 |
| Agency: | LA Metro |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PS127177(2) |
| Publication URL: | To access bid details, please log in. |
| Number | Title | Type | NAICS Code(s) | Due Date | Issue Date | Status |
| PS127177(2) | Uninterruptible Power Supply (UPS) and Batteries Installation for Metro E Line. Pre-Bid Documents added. Q&A 1 and 2 added. update 11/10 | IFB | 335999, 335910 | 05-Dec-2025, 10:30:00 | 16-Oct-2025 | Active |

With GovernmentContracts, you can:
...lifecycle. Relevant capabilities include electrical power systems (EPS), solar arrays, batteries... Follow Spacecraft ...
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Bid Due: 10/02/2026
..., Battery Energy Storage System (BESS), Modernize / Automate Sulphur Hexafluoride (SF6) Power ...
DEPT OF DEFENSE
Bid Due: 10/14/2026
..., but are not limited to, battery management, cabin temperature control, and standby ...
California Energy Commission
Bid Due: 10/28/2026