| Location: | Illinois |
|---|---|
| Posted: | Apr 15, 2025 |
| Due: | Apr 30, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W519TC-25-R-A006 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This is a notice that a solicitation is anticipated to be forth coming and will have all the necessary documents, including a scope of work.
IAW FAR 36.204(f), the magnitude of this project is between $1,000,000.00 and $5,000,000.00.
Performance and Payment Bonds are required.
The scope of the project is to grade and pave Beck Avenue from the east side of the Sylvan Drive intersection to the east entrance of building 212. Construction shall also include removing and installing new storm and sanitary sewer from the south side of building 212 to building 295. The Contractor shall provide construction services for the project. The premise for this project is to remove the existing pavement, regrade Beck Avenue, remove all storm and sanitary sewer. Install new storm and sanitary sewer and place new pavement. Beck Avenue along with existing parking lots and parking lot entrances shall be 9-inch Portland Cement Concrete (P.C.C.) with reinforcement at the joints with a standard 6-inch curb and gutter at 30-inch width, placed on a 12-inch modified subbase. The parking lot pavement of lot 2G shall be 2-3” lifts of hot mix asphalt (HMA). Subdrain tile shall be installed along the Beck Avenue gutter line and tied into new storm intakes. All green space areas disturbed during construction shall receive 6” of topsoil and hydro seed, fertilizer and mulch. The project shall be constructed using the Iowa State Urban Design and Specifications Program (SUDAS) 2024.
| Mar 14, 2025 | [Sources Sought (Original)] Repair Beck Avenue – Sylvan Drive to Building 212 East Entrance |
| May 5, 2025 | [Solicitation (Original)] Repair Beck Avenue – Sylvan Drive to Building 212 East Entrance |
| Jun 2, 2025 | [Solicitation (Updated)] Repair Beck Avenue – Sylvan Drive to Building 212 East Entrance |
| Jun 3, 2025 | [Solicitation (Updated)] Repair Beck Avenue – Sylvan Drive to Building 212 East Entrance |
| Jun 5, 2025 | [Solicitation (Updated)] Repair Beck Avenue – Sylvan Drive to Building 212 East Entrance |
| Jun 9, 2025 | [Solicitation (Updated)] Repair Beck Avenue – Sylvan Drive to Building 212 East Entrance |

With GovernmentContracts, you can:
Follow AMC/A6 Information Technology Needs Commercial Solutions Opening (CSO) Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 2/26/2031
Bids due in 3 months 7/10/26 10:30am CDT RR-23-4920R - Design-Build RFP Bids
Illinois Tollway
Bid Due: 7/10/2026
Bid Solicitation # 26-448DOIT-INFOT-B-51931 Bid Solicitation # 26-448DOIT-INFOT-B-51931 Organization Name DoIT - Department
State Government of Illinois
Bid Due: 7/08/2026
Follow AMC/A6 Information Technology Needs Commercial Solutions Opening (CSO) - Amendment 02 Active
DEPT OF DEFENSE
Bid Due: 2/26/2031