| Location: | North Carolina |
|---|---|
| Posted: | Mar 6, 2026 |
| Due: | Apr 6, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | N4008526R0002 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
***Two (2) offerors have been pre-qualified for Segment II. The offerors for Segment II are ECC Atlantic Construction and Walsh Federal.** The F35 Sustainment Center is a 255,461 SF depot level hangar to support (20) F-35 aircraft. In addition to the hangar maintenance bays, the project will also include 4 paint booths, administrative space, aircraft part modification and tool shops, and a secure area built to ICD705 standards. The main facility is a precast structural concrete panel with a pile supported foundation, slab on grade, and cross laminated timber roof deck. The structure is a single story with a two-story administrative space. The site development scope includes utility improvements to support entire Hancock Village, taxiway with a bridge and aircraft parking apron. The 105,755 SF Composite Repair Facility is a new consolidated depot-level facility for advanced composites and rotor blade repair. The project consists of two major sections, a composite repair and manufacturing shop that will include a disassembly area, parts kitting area, production control/clean parts area, assembly area to include climate controlled dirty room, bonding room, clean room, depot and fleet classrooms and engineering/laboratory space. Also included is an aircraft rotor blade repair shop that includes a disassembly and staging area, dirty room, sanding pit, and bonding room. Shared spaces that include painting, parts wash, freezer, hygiene facility, bathrooms, and breakrooms to minimize construction costs and improve sustainability.

With GovernmentContracts, you can:
...Date: Jun 11th 2026, 2:00 PM EDT Project Description: Charlotte Water is currently ...
City of Charlotte
Bid Due: 6/11/2026
...Date: Jun 11th 2026, 2:00 PM EDT Project Description: Charlotte Water is currently ...
City of Charlotte
Bid Due: 6/11/2026
...Testing/ Geotechnical Engineering - Building Envelope - Structural Engineering - Surveying App State.../Engineering ...
North Carolina State University
Bid Due: 7/30/2026
...Description: Pender County seeks qualifications from highly qualified engineering firms licensed... to practice ...
County of Pender
Bid Due: 6/25/2026