| Location: | Mississippi |
|---|---|
| Posted: | Mar 6, 2026 |
| Due: | Mar 20, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | EEPZ252131 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete the renovation of B230 to be
converted into a consolidated Flying Training Squadron (FTS) facility. Work includes replacing interior finishes, upgrading electrical
fixtures, demolishing and erecting interior partition walls and doors, mechanical and plumbing work, among others. Perform all work
according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.
This is a sources sought. No award will be made off this posting. This is for market research purposes only.

With GovernmentContracts, you can:
...), the Concept Design Drawings, and all related AF requirements and other codes ...
DEPT OF DEFENSE
Bid Due: 7/01/2026
...roof, and roof coping. Perform all work according to this Statement of Work ...
DEPT OF DEFENSE
Bid Due: 6/16/2026
...to the Statement of Work (SOW), the Concept Design Drawings, and all related ...
DEPT OF DEFENSE
Bid Due: 6/25/2026
...according to the SOW, the Concept Design Drawings, and all related AF requirements ...
DEPT OF DEFENSE
Bid Due: 6/25/2026