| Location: | California |
|---|---|
| Posted: | Mar 10, 2025 |
| Due: | Apr 10, 2025 |
| Agency: | Ventura County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RD25-09 |
| Publication URL: | To access bid details, please log in. |
Project Description: Construction of sidewalk and buffered bike lanes on the eastern side of Ventura Avenue, along with curb ramps for pedestrian safety, and drainage improvements. Work includes Potholing, Roadway Preparation, Tree Removal, Chain Link Fence, Drive Gate, Removal of Existing Structures, Crushed Miscellaneous Base, PCC Curb and Gutter, Curb Drain, PCC Sidewalk, PCC Driveway Approach, PCC Cross Gutter, PCC Curb Ramps, Minor Concrete, Earthen Swale, Reinforced Concrete Pipe, Storm Drain Manhole, Curb Opening Catch Basin, Drop Inlet for Concrete Pipe, Surface Preparation & Crack Treatment, Tack Coat, Mill & Fill, AC Widening, AC Miscellaneous Paving, Type II Emulsion-Aggregate Slurry, Roadside Mailbox, Pavement Delineation, Striping & Signing, and appurtenant work

With GovernmentContracts, you can:
...FY2026 Sewer Lining Project and On-Call Sewer and Storm Drain Lining Services Department: ...
City of Glendale
Bid Due: 6/17/2026
...Avenues, West of Grantland Avenue, Fresno, CA consists of Storm Drain Facilities and ...
Fresno Metropolitan Flood Control District
Bid Due: 6/17/2026
..., Installation, and Maintenance of Small Full Trash Capture Devices in Port of ...
Port of Oakland
Bid Due: 6/26/2026
...project will include the installation of a new 24-inch HDPE storm drain pipe ...
Napa County
Bid Due: 7/07/2026