| Location: | California |
|---|---|
| Posted: | Mar 10, 2025 |
| Due: | Apr 10, 2025 |
| Agency: | Ventura County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RD25-09 |
| Publication URL: | To access bid details, please log in. |
Project Description: Construction of sidewalk and buffered bike lanes on the eastern side of Ventura Avenue, along with curb ramps for pedestrian safety, and drainage improvements. Work includes Potholing, Roadway Preparation, Tree Removal, Chain Link Fence, Drive Gate, Removal of Existing Structures, Crushed Miscellaneous Base, PCC Curb and Gutter, Curb Drain, PCC Sidewalk, PCC Driveway Approach, PCC Cross Gutter, PCC Curb Ramps, Minor Concrete, Earthen Swale, Reinforced Concrete Pipe, Storm Drain Manhole, Curb Opening Catch Basin, Drop Inlet for Concrete Pipe, Surface Preparation & Crack Treatment, Tack Coat, Mill & Fill, AC Widening, AC Miscellaneous Paving, Type II Emulsion-Aggregate Slurry, Roadside Mailbox, Pavement Delineation, Striping & Signing, and appurtenant work

With GovernmentContracts, you can:
...including shoring, construction of concrete storm drain collars, junction structures, and manhole...),Storm Drain ...
City of Yorba Linda
Bid Due: 9/24/2026
...PDT Close Date: Sep 24th 2026, 2:00 PM PDT Project Description: Construction of ...
Ventura County
Bid Due: 9/24/2026
...Project ID: Title: Moorpark Road Storm Drain Pipe (CMP) Lining and Repair at ...
City of Thousand Oaks
Bid Due: 10/21/2026
...trenching including shoring, construction of concrete storm drain collars, junction structures, and manhole...: ...
City of Yorba Linda
Bid Due: 9/24/2026