Brownfield Remediation for Fulton St. Complex

Location: Florida
Posted: Apr 14, 2025
Due: May 1, 2025
Agency: City of Sanford
Type of Government: State & Local
Category:
  • F - Natural Resources and Conservation Services
Solicitation No: RFP 24/25-03
Publication URL: To access bid details, please log in.
Main

Agency
City of Sanford
Status
Active
Fiscal Year
2025
Primary Contact
Michael Cash
Title
Brownfield Remediation for Fulton St. Complex
Secondary Contact

Number
RFP 24/25-03
Tertiary Contact

Type
Announcement
Department

Online Submissions
No
Project Estimate
Piggyback Solicitation
No
Insurance Required
No
Bid Bond Required
No
Bid Bond Amount

Performance Bond Required
No
Performance Bond Amount

Construction Bond Required
No
Construction Bond Amount

Scope of Services
PUBLIC NOTICE is hereby given by the City of Sanford, Florida, a municipal corporation existing under the

laws of the State of Florida, inviting interested, licensed and qualified firms to submit competitive sealed

proposals in response to RFP 24/25-03, Brownfield Remediation for Fulton St. Complex, which consists of site

work for the Sanford Public Works Operations and Emergency Response Facility as outlined in the bidding

documents. The Work includes the clearing and grubbing of the site, preparation of a final site remediation and

cleanup plan, removal and proper disposal of contaminated soils in accordance with the final cleanup and

remediation plan, and grading of the site to leave in a pad ready state in accordance with the “Construction

Plans for the City of Sanford Rosemond Property” dated October 13, 2023. Bidding documents are available

for download from the web site www.myvendorlink.com under “Bid Solicitations” and under the Agency “City

of Sanford”. Sealed responses shall be submitted to the City of Sanford, Attention: Purchasing Division,

located at 300 N. Park Ave., Ste. 243, 2nd Floor, Sanford, Florida 32771. In lieu of sealed responses, Bidders

have the option to upload complete bid submittals to the website www.myvenderlink.com. Bids shall be

submitted or uploaded no later than 05/01/2025 at 2:00 P.M. Local Time. All questions shall be

submitted on VendorLink no later than 04/22/2025 at 2:00 P.M. Local Time.

Dates(All times are listed as EST )

Broadcast Date
4/1/2025 7:00 PM EST
Question End Date
4/22/2025 2:00 PM EST
Due Date
5/1/2025 2:00 PM EST
Bid Opening Date

Pre-Bid Conferences

Total: 1 (All times are listed as EST )
Date Time Mandatory Location
4/10/2025 10:00 AM No Non-Mandatory Meeting is scheduled for Thursday, April 10, at 10:00AM on site.
City of Sanford - Fleet
Across the street from
800 W. Fulton St.
Sanford, FL 32771
Documents

Total: 3
Type Name Description File Type
Bid Schedule Form RFP 24 25-03 Brownfield Remediation for Fulton Street Complex Revised 1.pdf RFP 24/25-03 Brownfield Remediation for Fulton St. Complex PDF
Correspondence Orlando Legal Ad 7790111proof.pdf Orlando Legal Ad PDF
Pre-Bid Sign-In Sheet Public Meeting Sign in Sheet.pdf Non-Mandatory Meeting Sign-in Sheet PDF
Questions & Answers

Total: 0
Question Date Asked Answer Date Answered
Commodity Codes

Total: 6
Code Description
[926-78] Remediation Services, Environmental (Including Rehabilitation Services Hazardous Waste and Mold Remediation)
[926-90] Subsurface Testing, Environmental
[890-17] Contaminated Groundwater Treatment Equipment
[925-42] Foundation Engineering
[913-48] Construction, Special Foundation
[917-26] Contracted Services, Research Foundation
Publications

Total: 0
Publication Date
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...elements include mobilization, maintenance of traffic, erosion control, clearing and grubbing...

County of Lake

Bid Due: 6/25/2026

...construction elements include mobilization, maintenance of traffic, erosion control, clearing and grubbing...

County of Lake

Bid Due: 6/25/2026

..., erosion control, clearing and grubbing, embankment, and sod. 1.6. All pedestrian facilities ...

County of Lake

Bid Due: 6/25/2026

...control, clearing and grubbing, embankment, and sod. 1.6. All pedestrian facilities shall adhere...

County of Lake

Bid Due: 6/25/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.