1412084647 (RFP) Design Services for the Arlington East Water Purification Facility

Location: Florida
Posted: Feb 10, 2026
Due: Feb 19, 2026
Agency: JEA
Type of Government: State & Local
Category:
  • 68 - Chemicals and Chemical Products
  • C - Architect and Engineering Services - Construction
Publication URL: To access bid details, please log in.
1412084647 (RFP) Design Services for the Arlington East Water Purification Facility

JEA is soliciting qualifications for professional engineering and permitting services for the Arlington East Water Purification Facility (WPF). JEA will award one (1) contract to the most highly qualified firm with which JEA is able to successfully negotiate a contract. The new WPF will be designed to treat an influent average flow of eight (8) million gallons per day. The new WPF will consist of the following purification processes:

  • Membrane Filtration (MF)
  • Reverse Osmosis (RO)
  • Ultraviolet (UV) light advanced oxidation process (AOP)
  • Membrane degasification
  • Post purification stabilization

    For further information on the work please refer to Appendix A - 10 Percent Design Document - December 2025.

  • JEA does not want the selected firm to re-evaluate the treatment process, however post-treatment optimization will be considered. JEA will be actively piloting and testing components as part of the H2.0 Center once online to assist in further refining the design. The 10 percent SDD should be used to explain the path intended by JEA moving forward and document decisions made to date. Elements which are firm are noted below.
  • Design conditions presented herein are preliminary. The Company is responsible for performing all process, pumping, and piping sizing and preparation of supporting design calculations.
  • This facility is not modeled after the H2.0 Center. This is a production facility and is not intended for demonstration, education, or public engagement as a visitor center.
  • WPF capacity of 8 mgd with core treatment process is firm: Membrane Filtration, Reverse Osmosis (RO), and UV Advanced Oxidation Process (UV AOP). While the process is set, there are opportunities for optimization and areas requiring further evaluation as follows:
    o Location for chemical injection within the process.
    o        WPF process layout within the building.
    o Site layout.

    The scope for the work may include, but is not limited to:
    •        Surveys
    •        Geotechnical investigations
    •        Process modeling and hydraulic modeling
    •        Design services for WPF, pumping stations, pipelines including 30% basis of design report, design drawings and specifications
    •        Permitting activities and applications for construction
    •        Site work including stormwater, paving, grading, and landscaping design
    •        All supporting discipline design including structural, architectural, HVAC, plumbing, fire protection, electrical and I&C
    •        Services during construction
    o        Inspection will be facilitated by JEA’s Owner Advisory team and not required
    •        Coordination with CMAR firm who will be responsible for constructing the improvements
    •        Compliance with the JEA project delivery management system including design phase drawings, specifications, and calculations.

    USE THIS LINK TO ACCESS THE SOLICITATION ON ZYCUS:

    https://zsn.zycus.com/guest/genericRegister/JEA074/iSource/1009811/

    Mandatory Pre-Response Meeting: January 8, 2026, at 11:00am
    Optional Site Visit – January 8, 2026, at 1:00pm
    Response Due Date: February 3, 2026
    Response Due Date: February 17, 2026
    Response Due Date: February 19, 2026

1412084647 Solicitation
1412084647 Addendum 3 - Due Date Extended
1412084647 Addendum 4 - Due Date Extended






Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Description: South County Reclaimed Water Transmission Pipeline Phase 1B Department: Water... for Prequalifications ...

Palm Beach County

Bid Due: 2/03/2030

...Description: SEWER PIPELINE, MANHOLE CLEANING AND INSPECTON SERVICES, Department: Purchasing Buyer... (RPQ) Category: ...

Palm Beach County

Bid Due: 2/03/2030

...Description: SEWER PIPELINE, MANHOLE CLEANING AND INSPECTON SERVICES, Department: Purchasing Buyer... Closing Date ...

Palm Beach County

Bid Due: 2/03/2030

...Description: S Co RCWM Pipeline Ph 2 & Lyons Rd FM, Yamato to ...

Palm Beach County

Bid Due: 6/22/2031

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.