P-591 Water Treatment Plant MCAS Yuma

Location: Arizona
Posted: Jan 31, 2025
Due: Feb 25, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: N62473-25-R-WTPY
Publication URL: To access bid details, please log in.
Follow
P-591 Water Treatment Plant MCAS Yuma
Active
Contract Opportunity
Notice ID
N62473-25-R-WTPY
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE NAVY
Major Command
NAVFAC
Sub Command
NAVFAC PACIFIC CMD
Sub Command 2
NAVFAC SOUTHWEST SW
Office
NAVFACSYSCOM SOUTHWEST
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Sources Sought (Original)
  • Original Published Date: Jan 31, 2025 07:49 am PST
  • Original Response Date: Feb 25, 2025 02:00 pm PST
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Mar 12, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1NE - CONSTRUCTION OF WATER SUPPLY FACILITIES
  • NAICS Code:
    • 237110 - Water and Sewer Line and Related Structures Construction
  • Place of Performance:
    Yuma , AZ 85369
    USA
Description

Construct new water treatment plant that produces up to five (5) MGD of potable water to support MCAS Yuma and construct three (3) water storage tanks with a total capacity of 7.5 million gallons.



Construction of a low-rise steel-frame structure with a mix of Concrete Masonry Unit (CMU) and cast-in-place concrete exterior walls sheathed in split face CMU veneer with insulated metal panel above and sloped standing seam metal roof. The new Water Treatment Plant (WTP) will produce up to 5-million gallons per day (MGD) of potable water and will include a new supply water intake structure connecting to a United States Bureau of Reclamation water source and a production well. Constructs three (3) ground finished water storage tanks and one (1) elevated finished water storage tank with aggregate capacity of 7.5 million gallons.



Construction of three (3) ground raw water storage tanks with aggregate capacity of 7.5 million gallons. Facility-related control systems include cybersecurity features in accordance with current Department of Defense (DoD) criteria. Information Systems include a Supervisory Control and Data Acquisition system for the water treatment plant. This project will provide Antiterrorism (AT) features and comply with applicable service and Geographic Combatant Commander policies and directive per Unified Facilities Criteria for DoD Minimum Antiterrorism Standards for Buildings.


Attachments/Links
Contact Information
Contracting Office Address
  • 750 PACIFIC HIGHWAY
  • SAN DIEGO , CA 92132-0001
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Jan 31, 2025 07:49 am PSTSources Sought (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...hours, 23 minutes Post Information Posted At:Wed, Jun 3, 2026 1:16 PM Sealed ...

Pendergast Elementary School District # 92

Bid Due: 6/23/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.