B1130 ROOF REPLACEMENT

Location: South Carolina
Posted: Mar 6, 2026
Due: Mar 13, 2026
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: VLSB260069
Publication URL: To access bid details, please log in.
Follow
B1130 ROOF REPLACEMENT
Active
Contract Opportunity
Notice ID
VLSB260069
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE AIR FORCE
Major Command
AIR COMBAT COMMAND
Office
FA4803 20 CONS LGCA
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Sources Sought (Updated)
  • Updated Published Date: Mar 06, 2026 02:07 pm EST
  • Original Published Date: Mar 06, 2026 02:05 pm EST
  • Updated Response Date: Mar 13, 2026 04:00 pm EDT
  • Original Response Date: Mar 13, 2026 04:00 pm EDT
  • Inactive Policy: 15 days after response date
  • Updated Inactive Date: Mar 28, 2026
  • Original Inactive Date: Mar 28, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Z2AZ - REPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
  • NAICS Code:
    • 238160 - Roofing Contractors
  • Place of Performance:
    Sumter , SC 29151
    USA
Description

1. Description:



This is a Sources Sought Notice and is issued solely for market research and planning purposes to identify potential sources capable of providing the construction needs for a Design-Build (DB) contract to execute a complete roof replacement for Section A of Building 1130 (highlighted in the Condition Assessment Report) at Shaw AFB.



The contractor shall provide all design, engineering, labor, materials, equipment, and supervision necessary to:



a) Completely demolish the existing roofing system down to the structural concrete deck to include the elevator shaft roof.



b) Repair the spalls and cracks on the existing concrete deck. Prepare the concrete deck with a new air & vapor barrier and insulation board for a standing seam metal roofing retro fit/hugger system.



c) Design and install a new, fully compliant, Single Sloped Hydrostatic Standing Seam Metal Roofing hugger system incorporating an adequate slope to ensure positive water drainage/flow. The slope of the new SSMR will be directed to the back of the building. The height of the new SSMR must not be higher than the existing front building’s parapet wall height primarily to maintain the overall aesthetic of the building’s front. Demolish all parapet wall in the rear building area to incorporate a new external drainage system at the rear of the building. All existing drainage and appurtenances of the building is to be sealed and removed.



d) Design and install a new, 2-ply, cold-applied SBS Modified Bitumen roofing system, complete with new insulation for the elevator shaft. The system shall be drained via new scuppers designed to discharge water onto the new main standing seam metal roof.



e) Engineer and execute a comprehensive redesign of the drainage system, demolishing the 25 existing internal drains, in its entirety. The new external drainage system will be located at the back of the building. The sizing of the gutters, downspouts and tie-in locations to the storm drains must be designed to handle the massive volume and velocity of water from a 100-year storm event impacting the entirety of the new roof.



f) Demolish the existing penthouse roof access. Demolish all existing access past the floor below the roof as these appurtenances are no longer required. Provide all necessary renovations and additions to structurally frame and fill the opening left from the penthouse demolition. Provide all necessary renovations and additions to retain stairway functions, fire rating and overall operations after transformation (drop down ceiling, lights, fire protection system etc).



g) Remove and replace all metal coping on all the remaining parapet walls, including the elevator shaft.



h) Extend existing vents, roof curbs, ducts and other penetrations as required and flash properly.



i) Install a new Horizontal Lifeline System / Fall Protection System.



j) Ensure all work complies with the Unified Facilities Criteria (UFC), UFC 3-110-03 Roofing, the Shaw AFB Design and Construction Guide, and all attached specifications.



k) Accomplish the work while omitting/minimizing operational impact on the fully functional, 24/7 mission-critical B1130 facility.





2. Submission Requirements:



Interested vendors are invited to submit the following information:



Company Information




  • Company name, address, and point of contact (name, email, phone)

  • CAGE code and UEI (if available)

  • Applicable NAICS codes

  • Capabilities Statement

  • Description of your ability to fulfill the listed requirements in the Statement of Work

  • Indicate your ability to perform at Shaw, AFB.





3. Submission Instructions:



Response Deadline: 13 March 2026, 4:00 PM EST



Submission Method: Email responses to hutton.cobb@us.af.mil



Subject Line: Sources Sought Response - B1130 Roof Replacement.



Disclaimer: This Sources Sought is issued solely for information and planning purposes and does not constitute a solicitation. This notice shall not be construed as a commitment by the Government to issue a solicitation or award a contract. The Government will not reimburse any costs incurred.


Attachments/Links
Contact Information
Contracting Office Address
  • ADMIN ONLY NO REQTN CP 803 895 5403 321 CULLEN ST BLDG 216
  • SHAW AFB , SC 29152-5125
  • USA
Primary Point of Contact
Secondary Point of Contact


History
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Bid:No Overview Summary Beaufort County is soliciting sealed proposals from qualified Design-Build firms ...

Beaufort County

Bid Due: 7/02/2026

...Project ID: Title: Design-Build Services for a New Greenwood County Fire Station-523 Whitehall ...

Greenwood County

Bid Due: 6/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.