| Location: | Georgia |
|---|---|
| Posted: | Oct 12, 2026 |
| Due: | Oct 29, 2026 |
| Agency: | Forsyth County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-80-1514 |
| Publication URL: | To access bid details, please log in. |
Project Description: Providing all materials, equipment and labor for construction of the proposed widening and reconstruction of Post Road from SR 9/S Atlanta Road to CR 5/Kelly Mill Road located in Forsyth County. The proposed design includes two lanes in each direction with a 16-foot wide raised median. The proposed outside shoulder will be a 19-foot wide urban shoulder on the east side, containing curb and gutter with a 10-foot wide multi-use path, and on the west side will be a 10-foot wide urban shoulder containing curb and gutter with 5-foot wide sidewalks. The project also includes the installation of drainage structures, storm drainpipes, water lines and appurtenances, asphalt, traffic signals and markings, landscaping, erosion, sedimentation and pollution control measures, and other associated work.

With GovernmentContracts, you can:
...Dunwoody Road Gap Fill Sidewalk T6026-2 Sandy Springs, City Of Oct 13, 2026 ...
State Government of Georgia
Bid Due: 11/13/2026
...Reconstruction and Rehabilitation 91327 Construction, Highway and Road 91350 Construction, Streets..., Major and ...
State Government of Georgia
Bid Due: 1/15/2027
..., and equipment for the Haralson Mill Road Covered Bridge Rehabilitation (Bridge Deck ...
State Government of Georgia
Bid Due: 11/05/2026
...Reconstruction and Rehabilitation 91319 Construction, Curb and Gutter, Including Maintenance, Repair..., and Removal ...
State Government of Georgia
Bid Due: 12/17/2026