| Location: | Illinois |
|---|---|
| Posted: | Feb 9, 2026 |
| Due: | Feb 25, 2026 |
| Agency: | City of Aurora |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Star Ave Water Main Replacement
Addenda: 0
Release Date: 2/9/2026
Due Date: 2/25/2026
The City of Aurora seeks a qualified contractor to perform water main replacement. The project limits are on Star Ave, from Constellation Dr to Reckinger Rd. The length of water main is approximately 720LF installed on the east side of Star Ave. Transfer of existing copper services as well as lead service replacement will be needed. IDOT prequalification is required at time of bid for this project.

With GovernmentContracts, you can:
Follow 88TH RD US ARMY RESERVE CENTER ARLINGTON HEIGHTS, IL WATER INFRASTRUCTURE IMPROVEMENTS-
DEPT OF DEFENSE
Bid Due: 9/16/2026
DEPARTMENT OF WATER MANAGEMENT Construction 76305 1334862 1334862: Block Level Lead Service Line
City of Chicago
Bid Due: 10/01/2026
Project: C26FI103384111 - Request for Proposals (RFP) for Construction Services for the Red
Chicago Transit Authority
Bid Due: 10/07/2026
Project: Mechanical Engineering Design Services Ref. #: 214619 Department: Purchasing Type: Other Status:
Metra Rail
Bid Due: 9/25/2026