2026 Installation of Traffic Striping, Pavement Markers and Pavement Markings Project

Location: California
Posted: Aug 21, 2026
Due: Sep 3, 2026
Agency: City of Delano
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid Title: 2026 Installation of Traffic Striping, Pavement Markers and Pavement Markings Project
Category: Engineering and Public Works
Status: Open
Description:

NOTICE IS HEREBY GIVEN that the City of Delano (“City”) is accepting sealed proposals (bids) in the City Clerk’s office at 1015 Eleventh Avenue, Delano, California 93215, up to the hour of 2:00 P.M. on September 3, 2026 for the 2026 Installation of Traffic Striping, Pavement Markers and Pavement Markings Project

There will be a non-mandatory pre-bid job walk/meeting scheduled on August 27, 2026, at 10:00 A.M. at 1015 Eleventh Avenue, Delano, CA, 93215.

General Description of Work:

The work involves installation of traffic lines and pavement markers and markings as described in the project plans and specifications at various streets in the City of Delano.

Estimated Project Cost Range: $150,000.00 to $160,000.00

Publication Date/Time:
8/20/2026 12:00 AM
Closing Date/Time:
9/3/2026 2:00 PM
Pre-bid Meeting:
8/27/2026 @10 AM Nonmandatory
Contact Person:
Ed Galero
Engineering Department
1015 11th Avenue
Delano, CA 93215
661-720-2221
egalero@cityofdelano.org
Download Available:
Free download on City website.
Fee:
$0.00
Plan & Spec Available:
City of Delano
Engineering Department
1015 11th Avenue
Delano, CA 93215
661-720-2223
Business Hours:
8:00 to 6:00 Monday -Thursday
Related Documents:

Attachment Preview

ENGINEERING CONTRACT DOCUMENTS
FOR
2026 INSTALLATION OF TRAFFIC STRIPING,
PAVEMENT MARKERS AND MARKINGS AT VARIOUS
STREETS IN DELANO
CITY OF DELANO
Advertised: August 20, 2026
Non-Mandatory Pre-Bid Job Walk: August 27, 2026 @ 10:00
am Bid Due/Opening: September 3, 2026 @ 2:00 pm
1015 ELEVENTH AVENUE
DELANO, CALIFORNIA 93215
AUGUST 2026

MASTER LIST OF CONTENTS
1. NOTICE INVITING SEALED PROPOSALS (BIDS)
2. BID FORM
3. SPECIAL PROVISIONS
4. BID SCHEDULE
5. CONTRACTOR'S LICENSE DECLARATION
6. SUBCONTRACTORS
7. INFORMATION REQUIRED OF BIDDER
8. BIDDER'S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS
9. EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
10.PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT
11.PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
12.PUBLIC CONTRACT CODE SECTION 10232 STATEMENT
13.NON-COLLUSION AFFIDAVIT
14.PROPOSAL GUARANTEE - ACKNOWLEDGMENT
15.PROPOSAL GUARANTEE - BID BOND
16.AGREEMENT FORM
17.PERFORMANCE BOND
18.PAYMENT (LABOR & MATERIALS BOND)
19.WORKER'S COMPENSATION CERTIFICATION
20.CERTIFICATE OF INSURANCE (WORKERS' COMPENSATION/EMPLOYERS' LIABILITY)
21.INSURANCE ENDORSEMENT (WORKERS' COMPENSATION/EMPLOYERS' LIABILITY)
22.CERTIFICATE OF INSURANCE (GENERAL/AUTO LIABILITY)
23.INSURANCE ENDORSEMENT (GENERAL/AUTO LIABILITY)
24.CERTIFICATE OF INSURANCE (BUILDER'S RISK/INSTALLATION FLOATER)
25.INSURANCE ENDORSEMENT (BUILDER'S RISK/INSTALLATION FLOATER)
26.GENERAL PROVISIONS
27.SPECIAL PROVISIONS - PART I AND PART II

NOTICE INVITING SEALED PROPOSALS (BIDS)
FOR THE
2026 INSTALLATION OF TRAFFIC STRIPING, PAVEMENT MARKERS AND
MARKINGS AT VARIOUS STREETS
IN THE CITY OF DELANO
PROJECT NO.: 2026_STR_008
NOTICE IS HEREBY GIVEN that the City of Delano ("City") is accepting sealed
proposals (bids) in the City Clerk's office at 1015 Eleventh Avenue, Delano, California
93215, up to the hour of 2:00 P.M. on September 3, 2026.
At such times, sealed proposals will be publicly opened and read aloud at the office of
the City Clerk. Bids will not be accepted after that time.
Bids shall conform to and be responsive to the Contract Documents for the work. Copies of
the Contract Documents are on file and available at the City of Delano Engineering
Department, at 1015 Eleventh Avenue, Delano, California 93215. Copies can be obtained
via the city website online at https://www.cityofdelano.org/Bids.aspx?
CatID=All&txtSort=Category&showAllBids=&Status=.
There will be a non-mandatory pre-bid job walk/meeting scheduled on August 27, 2026, at
10:00 A.M. at 1015 Eleventh Avenue, Delano, CA, 93215.
General Description of Work:
The work involves installation of traffic lines and pavement markers and markings as
described in the project plans and specifications at various streets in the City of Delano.
Estimated Project Cost Range: $150,000.00 to $160,000.00
Within a period of 15 calendar days after the opening of bids, the city will accept or reject the
bids. The City plans to issue a "Notice to Proceed" by October 2026. The project shall be
substantially completed within 30 working days.
Each bid shall be submitted on a form furnished as part of the Contract Documents
and must be accompanied by cash, a cashier's check, a certified check, or a bidder's bond
executed by an admitted surety insurer or substitute pursuant to Section 995.710 of the
Code of Civil Procedure, in an amount not less than 10% of the amount of the bid, made
payable to the order of or for the benefit of the City. The security of unsuccessful
bidders will be returned by the City no later than 60 days following the date of the award.
Each bid shall be sealed and delivered to the City at the location designated in this notice
for the opening of proposals at or before the time in this notice provided. The check,
bond, or substitute shall be given as security that the bidder will enter into a contract with
the City and furnish the required payment and performance bonds, or substitutes in
lieu thereof, certificates of insurance and endorsements if awarded the work. Such
check, bond, or substitute will be declared forfeited if the bidder refuses to timely enter into
a contract or furnish the required bonds or substitutes, certificates of insurance and
endorsements if their bid is accepted.

Seal the bid in an envelope addressed to the City and marked:
City of Delano
Attn: City Clerk
1015 Eleventh Avenue
Delano, CA 93215
"BID FOR THE 2026 INSTALLATION OF TRAFFIC STRIPING AND PAVEMENT MARKINGS
AND MARKERS DO NOT OPEN UNTIL THE BID OPENING AT 2:00 PM ON SEPTEMBER 3,
2026"
Pursuant to Public Contract Code Section 22300, equivalent securities may be substituted
for monies withheld to ensure performance of the contract. The City reserves the right to
solely determine the adequacy of the securities being proposed by the Contractor and the value
of those securities. The City shall also be entitled to charge an administrative fee, as
determined by City in its sole discretion, for substituting equivalent securities for retention
amounts. The City's decisions with respect to the administration of the provisions of Section
22300 shall be final and shall include, but not be limited to, determinations of what securities are
equivalent, the value of the securities, the negotiability of the securities, the costs of
administration and the determination of whether or not the administration should be
accomplished by an independent agency or by the City. The City shall be entitled, at any time,
to request the deposit of additional securities of a value designated by City, in City's sole
discretion, to satisfy this requirement. If the City does not receive satisfactory securities within
twelve (12) consecutive days of the date of the written request, City shall be entitled to
withhold the amounts due Contractor until securities of satisfactory value to City have
been received.
The City Council has obtained from the Director of the California Department of
Industrial Relations a determination of the general prevailing rate of per diem
wages and the general prevailing rate for legal holiday and overtime work in the
locality in which said work is to be performed for each craft, classification, or type of
worker needed. Not less than the determined rates shall be paid to all workers employed in
the performance of the contract. Such rates of wages are on the file with the Department of
Industrial Relations and in the office of the City and are available to any interested party upon
request.
The Contractor's duty to pay State prevailing wages can be found under Labor
Code Section 1770 et. Seq. and Labor Code Sections 1775 and 1777.7 outline the
penalties for failure to pay prevailing wages and employ apprentices including
forfeitures and debarment.
Bidders are further notified that this project is subject to compliance monitoring and
enforcement by the Department of Industrial Relations. No contractors or subcontractors may
be listed on bid proposal unless registered with the Department of Industrial Relations and the
City must find bids failing to comply with all applicable labor code requirements including Labor
Code sections 1725.5 and 1771.4 to be nonresponsive. Any contract entered into pursuant to
this notice will incorporate the provisions of the State Labor Code. Compliance with the
prevailing rates of wages and apprenticeship employment standards established by the State
Director of Industrial Relations will be required.
No bid will be accepted from a Contractor who has not been licensed in accordance with
the provisions of the State Business and Professions Code. The Contractor's license
classification(s) required for this project are as follows: Class A - General Contractor or Class
C32 - Parking and Highway Improvement Contractor. These classifications are provided for
information purposes only. The Engineer does not warrant that all classifications required for
the project are listed.

The successful Contractor and his Sub-Contractors will be required to possess the correct license
for their project classifications, and valid City Business Licenses from the City of Delano.
All inquiries regarding the plans and specifications shall be directed to Ed Galero at
egalero@cityofdelano.org and Michael Hernandez at mihernandez@cityofdelano.org.
The City Council of the City reserves the right to select the schedule(s) under which the bids are
to be compared, and contract(s) awarded, to reject any and all bids, and to waive any
nonmaterial irregularities in any bid.
Ricardo Chavez, City Clerk

BID FORM
FOR THE
2026 INSTALLATION OF TRAFFIC STRIPING, PAVEMENT MARKERS AND MARKINGS
PROJECT
PROJECT NO.: 2026_STR_008
DATE _________________________
NAME OF BIDDER
CONTRACTOR LICENSE NO.
TO THE CITY OF DELANO:
Pursuant to and in compliance with your Notice Inviting Sealed Proposals (Bids) and the other
documents relating thereto, the undersigned bidder, being fully familiar with the terms of the
Contract Documents, local conditions affecting the performance of the contract, the character,
quality, quantities, and scope of the work, and the cost of the work at the place where the work is
to be done, hereby proposes and agrees to perform within the time stipulated in the contract,
including all of its component parts and everything required to be performed, and to furnish any
and all of the labor, material, tools, equipment, transportation, services, permits, utilities, and all
other items necessary to perform the contract and complete in a workmanlike manner, all of the
work required in connection with the construction of said work all in strict conformity with the plans
and specifications and other contract documents, including Addenda Nos. , , ,
for the prices hereinafter set forth.
Submittal of this bid shall be considered evidence that the Bidder has satisfied himself regarding
the contract documents, access and any other field conditions which may affect bid prices. If this
proposal is accepted for award, Bidder agrees to enter into a contract with the City of Delano at
the unit and/or lump sum prices set forth in the following Bid Schedule.
The City Council of the City of Delano reserves the right to reject any and all bids, and to waive
any nonmaterial irregularities in any bid.
The work for which this proposal is submitted is for construction in conformance with the general
and special provisions (including the payment of not less than the State general prevailing wage
rates), the project plans described below, including any addenda thereto and the contract attached
hereto.

SPECIAL PROVISIONS
The bidder shall set forth for each unit basis item of work a unit price and a total for the item, and
for each lump sum item a total for the item, all in clearly legible figures in the respective spaces
provided for that purpose. In the case of unit basis items, the amount set forth under the "Item
Total" column shall be the product of the unit price bid and the estimated quantity for the item.
In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit
price shall prevail, except as provided in (a) or (b), as follows:
(a) If the amount set forth as a unit price is unreadable or otherwise unclear, or is omitted, or
is the same as the amount as the entry in the item total column, then the amount set forth
in the item total column for the item shall prevail and shall be divided by the estimated
quantity for the item and the price thus obtained shall be the unit price;
(b) (Decimal Errors) If the product of the entered unit price and the estimated quantity is
exactly off by a factor of ten, one hundred, etc., or one-tenth, or one- hundredth, etc. from
the entered total, the discrepancy will be resolved by using the entered unit price or item
total, whichever most closely approximates percentage wise the unit price or item total in
the City's Final Estimate of cost.
If both the unit price and the item total are unreadable or otherwise unclear, or are omitted, the
bid may be deemed irregular. Likewise, if the item total for a lump sum item is unreadable or
otherwise unclear, or is omitted, the bid may be deemed irregular unless the project being bid has
only a single item and a clear, readable total bid is provided.
Symbols such as commas and dollar signs will be ignored and have no mathematical significance
in establishing any unit price or item total or lump sums. Written unit prices, item totals and lump
sums will be interpreted according to the number of digits and, if applicable, decimal placement.
Cents symbols also have no significance in establishing any unit price or item total since all figures
are assumed to be expressed in dollars and/or decimal fractions of a dollar. Bids on lump sum
items shall be item totals only; if any unit price for a lump sum item is included in a bid and it differs
from the item total, the item total shall prevail.
The foregoing provisions for the resolution of specific irregularities cannot be so comprehensive
as to cover every omission, inconsistency, error or other irregularity which may occur in a bid. Any
situation not specifically provided for will be determined in the discretion of the City, and that
discretion will be exercised in the manner deemed by the City to best protect the public interest in
the prompt and economical completion of the work. The decision of the City respecting the amount
of a bid, or the existence or treatment of an irregularity in a bid, shall be final.
If this proposal shall be accepted and the undersigned shall fail to enter into the contract or furnish
the two required bonds in the sums required by the State Contract Act, with surety satisfactory to
the City, within 8 days after the bidder has received notice from the City that the contract has been
awarded, not including Saturdays, Sundays and legal holidays, the City may determine that the
bidder has abandoned the contract, and thereupon this proposal and the acceptance thereof shall
be null and void, and the forfeiture of the security accompanying this proposal shall be the property
of the City.
The undersigned, as bidder, declares that the only persons or parties interested in this proposal
as principals are those named herein; that this proposal is made without collusion with any other
person, firm, or corporation; that the bidder has carefully examined the location of the proposed
work, the attached proposed form of contract, and the plans therein referred to; and the bidder
proposes and agrees if this proposal is accepted, that they will contract with the City in the form

of the contract attached hereto, to provide all necessary machinery, tools, apparatus and other
means of construction, and to do all the work and furnish all the materials specified in the contract,
in the manner and time therein prescribed, and according to the requirements of the Engineer as
therein set forth.
Bidder understands that a bid is required for the entire work, that the estimated quantities set forth
in the bid form are solely for the purpose of comparing bids, and that final compensation under the
contract will be based upon the actual quantities of work satisfactorily completed. THE CITY OF
DELANO RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY
QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT.
It is agreed that the unit and/or lump sum prices bid include all apparent expenses, taxes, royalties,
and fees. Notwithstanding anything to the contrary in these special provisions, full compensation
for performing all work as specified in the Contract Documents and as directed by the Engineer is
considered to be included in the various bid items, and no additional payment will be made.
Bids will be compared on the basis of the Total Base Bid amount exclusive of additive bid items.
The project will be awarded to the lowest responsible, responsive bidder.
The bidder's execution on the signature portion of this proposal shall also constitute an
endorsement and execution of those certifications which are a part of this proposal.

Item No. Quantity Unit Item Description Unit Price Total Price
A-1 1 LS Mobilization/demobilization, bonds & insurance $_________ $_________
A-2 1 LS Traffic Control and Signing $_________ $_________ _
A-3 186,078 LF Furnish all labor, materials, and equipment for installation of 4" broken centerlines (4" yellow reflective), Detail 1 of the Standard Plans and Specification. $_________ $_________
A-4 72,200 LF Furnish all labor, materials, and equipment for installation of double centerline (2-4" yellow reflective, 1-3" black non-reflective), Detail 21 of the Standard Plans and Specification. $_________ $_________
A-5 38,186 LF Furnish all labor, materials, and equipment for installation of 2-way left turn double line (2-4" yellow reflective, 1-3" black non-reflective), Detail 31 of the Standard Plans and Specification $_________ $_________
A-6 3,124 LF Furnish all labor, materials, and equipment for installation of median islands (4-4" yellow reflective, 2-3" black non-reflective), Detail 28 of the Standard Plans and Specification $_________ $_________
A-7 15,988 LF Furnish all labor, materials, and equipment for installation of solid white line (8" reflective), Detail 38A of the Standard Plans and Specification $_________ $_________
A-8 43,835 LF Furnish all labor, materials, and equipment for installation of white broken lane line (4" reflective), Detail 8 of the Standard Plans and Specification $_________ $_________
A-9 36,894 LF Furnish all labor, materials, and equipment for installation of edge line (4" white reflective), Detail 27B of the Standard Plans and Specification $_________ $_________

CITY OF DELANO
2026 INSTALLATION OF TRAFFIC STRIPING, PAVEMENT MARKERS AND MARKINGS
PROJECT
BID SCHEDULE
Item Quantity Unit Unit Price Total
No. Item Description Price
Mobilization/demobilization, bonds &
A-1 1 LS $_________ $_________
insurance
$_________
A-2 1 LS Traffic Control and Signing $_________
_
Furnish all labor, materials, and equipment for
installation of 4" broken centerlines (4" yellow
A-3 186,078 LF $_________ $_________
reflective), Detail 1 of the Standard Plans and
Specification.
Furnish all labor, materials, and equipment
for installation of double centerline (2-4"
A-4 72,200 LF yellow reflective, 1-3" black non-reflective), $_________ $_________
Detail 21 of the Standard Plans and
Specification.
Furnish all labor, materials, and equipment for
installation of 2-way left turn double line (2-4"
LF
A-5 38,186 yellow reflective, 1-3" black non-reflective), $_________ $_________
Detail 31 of the Standard Plans and
Specification
Furnish all labor, materials, and equipment
for installation of median islands (4-4"
LF
A-6 3,124 yellow reflective, 2-3" black non-reflective), $_________ $_________
Detail 28 of the Standard Plans and
Specification
Furnish all labor, materials, and equipment
for installation of solid white line (8"
A-7 15,988 LF $_________ $_________
reflective), Detail 38A of the Standard
Plans and Specification
Furnish all labor, materials, and equipment for
installation of white broken lane line (4"
A-8 43,835 LF $_________ $_________
reflective), Detail 8 of the Standard Plans and
Specification
Furnish all labor, materials, and equipment
for installation of edge line (4" white
A-9 36,894 LF $_________ $_________
reflective), Detail 27B of the Standard
Plans and Specification

A-10 3,980 LF Furnish all labor, materials, and equipment for installation of one-way pass - double line (2-4" yellow reflective, 1-3" black non- reflective), Detail 18 of the Standard Plans and Specification $_________ $_________
A-11 71,890 LF Furnish all labor, materials, and equipment for installation of Bike Lane Line (6" white line), Detail 39 of the Standard Plans and Specification. $_________ $_________
A-12 8,400 LF Furnish all labor, materials, and equipment for installation of Broken Bike Lane Intersection (6" white line), Detail 39A of the Standard Plans and Specification. $_________ $_________
A-13 4,000 EA Furnish all labor, materials, and equipment for installation of additional Type "D"; "H" and "G" raise pavement markers to replace missing markers at various streets per Standard Plans and Specifications $_________ $_________
TOTAL BASE BID $____________

Furnish all labor, materials, and equipment
for installation of one-way pass - double
LF
A-10 3,980 line (2-4" yellow reflective, 1-3" black non- $_________ $_________
reflective), Detail 18 of the Standard Plans
and Specification
Furnish all labor, materials, and equipment
for installation of Bike Lane Line (6" white
A-11 71,890 LF $_________ $_________
line), Detail 39 of the Standard Plans and
Specification.
Furnish all labor, materials, and equipment
for installation of Broken Bike Lane
A-12 8,400 LF $_________ $_________
Intersection (6" white line), Detail 39A of
the Standard Plans and Specification.
Furnish all labor, materials, and equipment
for installation of additional Type "D"; "H"
A-13 4,000 EA and "G" raise pavement markers to replace $_________ $_________
missing markers at various streets per
Standard Plans and Specifications
TOTAL BASE BID $____________
Notes: Mobilization Lump Sum Item No. 1 shall not exceed 5% of Total Base Bid.
TOTAL BASE BID AMOUNT (written in words) is
Dollars and Cents.
In the event of discrepancy between words and figures, the words shall prevail.

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Consisting of Demo, Overlay and Striping for 2276,2273,2278 and 2283 in accordance with ...

DEPT OF DEFENSE

Bid Due: 9/24/2026

...asphalt concrete digouts, traffic control, storm water pollution control, pavement striping...

Marin County

Bid Due: 9/22/2026

...at www.acquisition.gov. CLIN 0001 Repair AC Paving, Area 1 Consisting of Demo, Overlay ...

DEPT OF DEFENSE

Bid Due: 9/24/2026

..., installation of ADA-compliant curb ramps, signing and striping, traffic loop restoration, new ...

La County

Bid Due: 9/29/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.