The project consists of removal and replacement of approximately 34,000 sf of gravel parking lot surface to an 8” depth, installation of concrete curbing, asphalt approaches at entrance and exit, installation of ADA compliant sidewalk, regarding existing water detention areas, regrading of site to improve drainage, jet-vac existing stormwater pipes and inlets and other items associated with the repair work.
Addendum 1 - Issued Tuesday, January 27, 2026
A Non-Mandatory Pre-Bid Meeting is scheduled for 10:00 am on Wednesday, January 21, 2026. Attendees shall meet in the overflow lot located at 361 NE 35 th Avenue, Camas WA 98607.

With GovernmentContracts, you can:
..., and the construction and installation of new precast concrete deck panels and ...
State Government of Washington
Bid Due: 8/13/2026
...concrete footings, shotcrete walls, and precast concrete cover), and electrical. Engineer's Estimate...
City of Seattle
Bid Due: 7/29/2026
..., culvert construction consisting of cast-in-place concrete footings, shotcrete walls, and precast... concrete ...
City of Seattle
Bid Due: 8/12/2026
...of the bridge. Work involves crack injection, concrete spall repair, Carbon Fiber Reinforced ...
City of Seattle
Bid Due: 8/05/2026