| Location: | Washington |
|---|---|
| Posted: | Feb 10, 2026 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project consists of removal and replacement of approximately 34,000 sf of gravel parking lot surface to an 8” depth, installation of concrete curbing, asphalt approaches at entrance and exit, installation of ADA compliant sidewalk, regarding existing water detention areas, regrading of site to improve drainage, jet-vac existing stormwater pipes and inlets and other items associated with the repair work.
Addendum 1 - Issued Tuesday, January 27, 2026
A Non-Mandatory Pre-Bid Meeting is scheduled for 10:00 am on Wednesday, January 21, 2026. Attendees shall meet in the overflow lot located at 361 NE 35 th Avenue, Camas WA 98607.

With GovernmentContracts, you can:
..., pavement repair, inlay with hot mix asphalt (HMA), installing pavement markings, installing ...
State Government of Washington
Bid Due: 10/07/2026
..., installation of concrete wheel stops, repair and replacement of curbs, lift and ...
Port of Seattle
Bid Due: 9/29/2026
...bituminous pavement, pavement repair, inlay with HMA, installing pavement markings, installing high... working ...
State Government of Washington
Bid Due: 10/07/2026
...Equipment (Not Otherwise Classified) Maintenance and Repair 929-29-Concrete Equipment: Buckets..., Screeding Machines, Curbers, ...
State Government of Washington
Bid Due: 11/20/2026