| Location: | Washington |
|---|---|
| Posted: | Feb 10, 2026 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project consists of removal and replacement of approximately 34,000 sf of gravel parking lot surface to an 8” depth, installation of concrete curbing, asphalt approaches at entrance and exit, installation of ADA compliant sidewalk, regarding existing water detention areas, regrading of site to improve drainage, jet-vac existing stormwater pipes and inlets and other items associated with the repair work.
Addendum 1 - Issued Tuesday, January 27, 2026
A Non-Mandatory Pre-Bid Meeting is scheduled for 10:00 am on Wednesday, January 21, 2026. Attendees shall meet in the overflow lot located at 361 NE 35 th Avenue, Camas WA 98607.

With GovernmentContracts, you can:
...and grading; pavement sawcutting and trenching for the new stormwater treatment system; procurement... ...
Port of Tacoma
Bid Due: 6/02/2026
.... The project consists of grading; stormwater improvements; curb and sidewalk construction; ITS, ...
City of Spokane Valley
Bid Due: 6/03/2026
...paving, concrete paving, roundabout construction, stormwater facilities, structures over Yelm Creek...
State Government of Washington
Bid Due: 6/24/2026
..., grading, asphalt concrete paving, electrical, communications, stormwater, detention vaults...
Spokane International Airport
Bid Due: 6/02/2026