| Location: | Washington |
|---|---|
| Posted: | Feb 10, 2026 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project consists of removal and replacement of approximately 34,000 sf of gravel parking lot surface to an 8” depth, installation of concrete curbing, asphalt approaches at entrance and exit, installation of ADA compliant sidewalk, regarding existing water detention areas, regrading of site to improve drainage, jet-vac existing stormwater pipes and inlets and other items associated with the repair work.
Addendum 1 - Issued Tuesday, January 27, 2026
A Non-Mandatory Pre-Bid Meeting is scheduled for 10:00 am on Wednesday, January 21, 2026. Attendees shall meet in the overflow lot located at 361 NE 35 th Avenue, Camas WA 98607.

With GovernmentContracts, you can:
...System, removal of asphalt pavement, concrete sidewalk, and concrete curb and gutter, construction... ...
City of West Richland
Bid Due: 10/13/2026
...and removal of two (2) tensile fabric tents (3,880 SF), concrete tent foundations, ...
City of Seattle
Bid Due: 9/30/2026
...crack seal, seal coating, performing profile grinding, hauling and disposal of grinding spoils, ...
Port of Seattle
Bid Due: 9/29/2026
...Concrete Coring 150-07-Boxes, Shoring (For Construction Worker Protection) 959-26-Breakwater Construction... Systems, Including Infrastructure ...
State Government of Washington
Bid Due: 11/20/2026