| Location: | Washington |
|---|---|
| Posted: | Feb 10, 2026 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project consists of removal and replacement of approximately 34,000 sf of gravel parking lot surface to an 8” depth, installation of concrete curbing, asphalt approaches at entrance and exit, installation of ADA compliant sidewalk, regarding existing water detention areas, regrading of site to improve drainage, jet-vac existing stormwater pipes and inlets and other items associated with the repair work.
Addendum 1 - Issued Tuesday, January 27, 2026
A Non-Mandatory Pre-Bid Meeting is scheduled for 10:00 am on Wednesday, January 21, 2026. Attendees shall meet in the overflow lot located at 361 NE 35 th Avenue, Camas WA 98607.

With GovernmentContracts, you can:
...Bowden.H@portseattle.org Phone 206-962-1370 The Work includes but is not limited to providing..., various ...
Port of Seattle
Bid Due: 9/29/2026
.... and/or Maint.,Bridge (Replacement or Rehabilitation),Bridges/Overpasses,Concrete Pavement,Concrete... Pavement Removal,Concrete Walkway,Concrete/Formed/Flatwork/Foundation,Concrete/Shotcrete/Sprayed...,Construction,Culverts, Waterways, Stormwater Channels,Curbs,Cutting/Recycling ...
City of Wenatchee
Bid Due: 9/16/2026
...working days. Work class 4, asphalt concrete paving . Public Works Publication Date ...
State Government of Washington
Bid Due: 10/07/2026
...area. The work includes demolition and removal of two (2) tensile fabric tents ...
City of Seattle
Bid Due: 9/16/2026