| Location: | Washington |
|---|---|
| Posted: | Feb 10, 2026 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project consists of removal and replacement of approximately 34,000 sf of gravel parking lot surface to an 8” depth, installation of concrete curbing, asphalt approaches at entrance and exit, installation of ADA compliant sidewalk, regarding existing water detention areas, regrading of site to improve drainage, jet-vac existing stormwater pipes and inlets and other items associated with the repair work.
Addendum 1 - Issued Tuesday, January 27, 2026
A Non-Mandatory Pre-Bid Meeting is scheduled for 10:00 am on Wednesday, January 21, 2026. Attendees shall meet in the overflow lot located at 361 NE 35 th Avenue, Camas WA 98607.

With GovernmentContracts, you can:
...RFP | Fish and Wildlife, On-call River Restoration Engineering/Design Services | Closing Date ...
The Confederated Tribes of the Colville Reservation
Bid Due: 6/26/2026
...; restoration and repair of disturbed mechanical and electrical assemblies, miscellaneous concrete...; restoration ...
King County
Bid Due: 6/09/2026
...installation, channel reconstruction, channel re-alignment, streambed restoration, roadside... restoration, erosion control, water management ...
State Government of Washington
Bid Due: 7/16/2026
...improvements. In addition to the seismic upgrade, this project will include building envelope ...
City of Seattle
Bid Due: 6/10/2026