RFP SSU-2027-01 Campus Building Automation System Preventive Maintenance, Repair, Technical Support, and On-call Services

Location: Massachusetts
Posted: Nov 3, 2026
Due: Nov 16, 2026
Agency: Salem State University
Type of Government: State & Local
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Publication URL: To access bid details, please log in.
RFP SSU-2027-01 Campus Building Automation System Preventive Maintenance, Repair, Technical Support, and On-call Services — Oct 30, 2026

Attachment Preview

SALEM STATE UNIVERSITY
Request For Proposals
RFP SSU-2027-01
Campus Building Automation System Preventive Maintenance, Repair, Technical
Support, and On-call Services
Salem State University
352 Lafayette Street
Salem, MA 01970
Procurement Milestone Date / Time
RFP Issue Date November 2, 2026
Optional Pre-Proposal Conference / Site Walk November 9, 2026, at 10:am
Deadline for Written Questions: email to rramos@salemstate.edu Monday, November 9, by 5pm
Addendum Issuance Target Tuesday, November 10, 2026
Technical/Price Proposals Due*: email to rramos@salemstate.edu Monday November 16, 2026, by 11am
Anticipated Notice of Intent to Award November 2026
Anticipated Contract Start December 2026
*Late submission will be rejected
1

Item Draft Provision
Owner Salem State University
Department Capital Planning and Facilities
Procurement Contact Reynaldo Ramos
Contract Type Service and on-call task authorization contract; final structure subject to Purchasing review
Initial Term Five (5) years
Renewal Options Up to two additional one-year options, exercisable solely by the University, subject to appropriation and written amendment
Award Basis Most advantageous responsible and responsive proposal, considering price and published comparative evaluation criteria
Price Submission Separate electronic price proposal, as directed in the final posting
Record Drawings Salem State Campus BAS Upgrades - Phase 2 ATC Record Drawings, incorporated as reference information and existing-condition documentation

Document Control and Procurement Notes
Item Draft Provision
Owner Salem State University
Department Capital Planning and Facilities
Procurement Contact Reynaldo Ramos
Service and on-call task authorization contract; final structure subject to Purchasing
Contract Type
review
Initial Term Five (5) years
Up to two additional one-year options, exercisable solely by the University, subject to
Renewal Options
appropriation and written amendment
Most advantageous responsible and responsive proposal, considering price and
Award Basis
published comparative evaluation criteria
Price Submission Separate electronic price proposal, as directed in the final posting
Salem State Campus BAS Upgrades - Phase 2 ATC Record Drawings, incorporated as
Record Drawings
reference information and existing-condition documentation
Table of Contents
1. Procurement Overview
2. Instructions to Proposers
3. Minimum Qualifications
4. Campus BAS Background
5. Scope of Services
6. Service Levels and Work Authorization
7. Technical, Cybersecurity, and Documentation Requirements
8. Staffing, Safety, and Campus Operations
9. Deliverables and Acceptance
10. Proposal Content and Format
11. Evaluation and Award
12. Pricing and Payment
13. Contract Terms and Risk Allocation
Appendix A - Campus Systems and Locations
Appendix B - Preventive Maintenance Checklist
Appendix C - Price Proposal Form
Appendix D - Technical Proposal Forms
1. Procurement Overview
1.1 Purpose
Salem State University through the office of the Chief Procurement Officer invites electronic proposals from qualified
building automation system contractors to provide campus-wide preventive maintenance, diagnostics, repair,
programming, integration, operator support, documentation, and on-call emergency and non-emergency services for
the University's existing BAS and automatic temperature control infrastructure. The selected contractor shall furnish all
labor, supervision, tools, test equipment, software access, transportation, incidental materials, and administrative
services necessary to perform the work described in this RFP.
2

The procurement is intended for preventive maintenance, troubleshooting, repair, programming, integration,
documentation, training, and on-call technical services for existing campus building automation systems.
The University will use individual written task authorizations for work beyond including recurring services. No
additional work may proceed without written authorization.
The Phase 2 record drawings indicate a Honeywell WEBs / Niagara N4 supervisory environment with multiple JACE
controllers and legacy LON, BACnet, Modbus, and related field networks. The drawings remain the controlling
reference for specific existing conditions.
1.2 Objectives
* Maintain reliable operation of BAS supervisory, network, controller, sensor, actuator, and controlled-equipment
interfaces.
* Preserve compatibility with the University's existing Honeywell WEBs / Niagara N4 supervisory environment and
campus IP network, and provide all required software, firmware, drivers, licenses, software maintenance
agreements, updates, patches, and related activation or support services necessary for the continued operation,
maintenance, backup, restoration, programming, integration, and cybersecurity of the BAS, unless specifically
identified as University-furnished.
* Improve alarm quality, trend reliability, sequence performance, energy efficiency, and seasonal readiness.
* Provide transparent service records, backups, change logs, deficiency reports, and itemized repair
recommendations.
* Establish competitive labor rates and material markups for authorized on-call work.
* Transfer knowledge to University personnel and avoid unnecessary vendor dependence.
1.3 Contract Framework
The University anticipates one primary award, but reserves the right to make no award, reject proposals, cancel the
solicitation, or make other awards. The resulting contract will consist of the final RFP, addenda, the successful proposal,
negotiated clarifications expressly incorporated by the University, Commonwealth of Massachusetts contract and T&Cs,
purchase orders, and authorized task orders.
1.4 Governing Procurement Requirements
The terms of 801 CMR 21.00: Procurement of Commodities and Services is incorporated by Reference into this RFR. Words
used in this RFR shall have the meanings defined in 801 CMR 21.00. Additional definitions may also be identified in this
RFR. All terms, conditions, requirements, and procedures included in this RFR must be met for a Response to be
determined responsive. If a Bidder fails to meet any material term, condition, requirement or procedure, its Response may be
deemed unresponsive and disqualified. ALL Responses must be submitted in accordance with the specific terms of this
RFP.
Unless otherwise clearly stated in this RFP, any reference to a particular trademark, trade name, patent, design, type,
specification, producer or supplier is not intended to restrict this RFR to any manufacturer or proprietor or to constitute an
endorsement of any good or service, and the Department may consider clearly identified offers of substantially equivalent
goods and services submitted in response to such reference.
2. Instructions to Proposers
2.1 Procurement Contact
Except as may be noted otherwise herein, the issuing office and sole contact for the coordination and dissemination of all
information regarding this RFP is:
Reynaldo Ramos, Assistant Vice President, Purchasing and Auxiliary Services
Salem State University
352 Lafayette Street
Salem, Ma 01970-5353
Email: rramos@salemstate.edu
Bidders are prohibited from communicating directly with any other employee of the University except as specified above. The
University's Procurement Services office is authorized to provide any information or respond to any question or inquiry
concerning this RFP.
2.2 Questions and Addenda
Questions must be submitted in writing by the deadline. Responses and changes will be issued only by written
addendum. Oral interpretations are not binding.
3

2.3 Site Visit
The University will conduct an optional pre-proposal conference site visit. Proposers shall not access control panels,
networks, mechanical rooms, roofs, residence halls, or occupied spaces without authorization.
2.4 Submission
Submit one technical proposal and one separate price proposal in the format, media, file-size, naming, labeling, and
delivery method stated in the final posting. Price information shall not appear in the technical proposal.
2.5 Proposal Validity
Proposals shall remain valid for 120 calendar days after the due date unless the University requests and the proposer
agrees to an extension.
2.6 Public Records
All responses and information submitted in response to this RFB are subject to the Massachusetts Freedom of Information
Law, M.G.L., Chapter 66, Section 10, and to Chapter 4, Section 7, Subsection 26, regarding public access to such
documents. Any statements reserving any confidentiality or privacy rights in submitted Responses or otherwise inconsistent
with these statutes will be void and disregarded
2.7 Costs of Proposal
The University is not responsible for costs incurred in preparing a proposal, attending meetings, conducting site
review, or negotiating a contract.
2.8 Reservations
The University may waive minor informalities, request written clarification, verify information, check references, reject
nonresponsive proposals, and reject any proposer determined not responsible, subject to applicable law and the
published procurement procedure.
3. Minimum Qualifications
A proposer must demonstrate the following at the proposal due date and throughout the contract:
* At least five years of recent organizational experience servicing commercial, institutional, or higher-education BAS
environments of comparable complexity.
* Demonstrated Niagara N4 and Honeywell WEBs capabilities, including appropriately trained personnel able to
service supervisory controllers, graphics, histories, alarms, schedules, and supported field integrations.
* The proposer shall be a current factory-authorized Honeywell WEBs and Niagara Framework N4 service provider
and shall assign factory-trained Niagara N4 personnel to the contract. The technical proposal shall include
documentation of current factory authorization and copies of applicable Niagara N4 training certificates or
credentials for the proposed lead controls engineer, programmer, and service technicians. Authorization and
training shall remain current throughout the contract term, and replacement personnel shall possess qualifications
equal to or greater than those of the personnel originally proposed.
* Experience with BACnet/IP, BACnet MS/TP, LON, Modbus RTU/TCP, Ethernet/IP networking, VFD interfaces,
and common HVAC control devices.
* Ability to provide 24/7 emergency response and remote support, subject to University network and security
approval.
* Qualified Massachusetts-licensed electrical personnel when work requires licensure. Refrigeration, plumbing,
sheet metal, fire alarm, or other licensed work shall be performed only by properly licensed personnel where
applicable.
* A documented safety program and ability to comply with campus access, lockout/tagout, confined-space, hot-
work, fall-protection, and infection-control or occupied-space requirements applicable to each task.
* Commercial general liability, automobile liability, workers compensation This insurance shall be written with
respect to all coverage, for not less than the following policy limit: one million ($1,000,000) per each occurrence
and one million ($1,000,000) aggregate
* No unresolved suspension, debarment, tax, wage, or contract-performance issue that would prevent a
responsible award.
Failure to meet a minimum qualification may result in rejection without comparative evaluation.
4

4. Campus BAS Background
The referenced Phase 2 ATC record drawings describe a campus supervisory architecture based on an existing
Honeywell WEBs N4 Web Supervisor connected to building-level JACE controllers over the Salem State BMS IP
network. The drawings identify existing and upgraded systems at Commons Dining, Berry Library, Horace Mann,
Stanley Building, Gassett Fitness Center, Gordon Center, Peabody Residence Hall, Bowditch Residence Hall, Forten
Resident Hall, O'Keefe Sports Complex, and the School of Social Work / Adaptive Use / Lafayette Annex.
The record drawings also identify mixed existing field communications, including LON, BACnet MS/TP, BACnet/IP,
Modbus RTU, IO-R, and equipment-specific interfaces. Proposers shall treat device counts and conditions as record
information, verify conditions before work, and immediately report material discrepancies. Existing IP addresses,
credentials, host identifiers, software keys, and security configurations are confidential University information and shall
not be reproduced in public-facing reports.
4.1 Owner Standards
* Coordinate all BAS network activity with Salem State Information Technology and Facilities.
* Maintain the University's established N4 graphics conventions, naming, navigation, alarm presentation,
scheduling, and trend standards unless a written task authorization states otherwise.
* Do not introduce unsupported gateways, cloud connections, remote-access tools, wireless connections, or
proprietary dependencies without written approval.
* Return replaced equipment, licensed media, backups, and owner data to the University unless directed otherwise.
* Maintain backward compatibility and operational continuity during repair or migration work.
5. Scope of Services
5.1 Mobilization and Baseline Assessment
* Kickoff meeting with Facilities, Purchasing, IT, and other stakeholders.
* Review available record drawings, controller inventories, software versions, licenses, open deficiencies, alarm
history, and prior service information.
* Submit a site-specific service plan, escalation contacts, safety plan, remote-access approach, and preventive
maintenance calendar.
* Create or validate a secure asset register identifying building, panel, controller role, protocol, software/firmware,
service status, backup status, and observed deficiency.
* Within the first ninety (90) calendar days after the contract start date, perform and submit a comprehensive initial
assessment of the general BAS infrastructure and overall system health. The assessment shall address the
supervisory platform, JACE and field-controller condition, communications networks, system availability, alarms,
trends, backups, licensing and software maintenance status, cybersecurity-related configuration, integration
condition, and observed hardware, software, and firmware deficiencies. The contractor shall also provide a
prioritized written modernization and remediation plan to bring all supported systems to current, stable,
manufacturer-supported software and firmware levels approved by the University. The plan shall identify
recommended versions, compatibility and licensing requirements, dependencies, cybersecurity considerations,
sequencing, outage or operational impacts, estimated labor and material costs, and a proposed implementation
schedule. No upgrade shall be installed without prior written authorization from the University and coordination
with Facilities and Information Technology.
* Perform initial backups before any approved changes and provide encrypted copies to the University.
5.2 Preventive Maintenance
Provide two comprehensive seasonal preventive maintenance visits per contract year, coordinated for heating and
cooling transition, plus recurring remote or on-site review as proposed and accepted. At minimum, perform the tasks
in Appendix B and the following:
* Verify controller, JACE, supervisor, and field network communications; identify offline, intermittent, duplicate-
addressed, or unstable devices.
* Review controller power, grounds, enclosures, labeling, terminal tightness, surge protection, battery or capacitor
condition where applicable, and visible environmental damage.
* Calibrate representative and critical temperature, humidity, pressure, differential pressure, CO2, current, flow, and
status devices; document as-found and as-left readings.
* Exercise approved outputs and verify commanded versus actual operation of valves, dampers, relays, VFD speed
signals, pump/fan status, safeties, and interlocks.
5

* Review heating, cooling, economizer, static-pressure, differential-pressure, hot-water, chilled-water, and
equipment staging loops for stability and expected operation.
* Review schedules, holidays, occupancy modes, overrides, setpoints, deadbands, alarm routing, alarm delays,
and trend sampling.
* Test seasonal sequences without defeating life-safety controls or disrupting occupied operations.
* Confirm that changes are saved, backed up, logged, and available to the University.
* Provide a visit report with findings, completed corrective actions, unresolved conditions, risk ranking, and itemized
recommendations.
5.3 Corrective Maintenance and Repair
* Diagnose BAS software, network, controller, sensor, actuator, wiring, interface, and sequence issues.
* Repair or replace failed components only after written University authorization when the work is not included in
the fixed preventive-maintenance price. Authorized component replacement work shall be priced using the
applicable pre-negotiated contract labor rates and the awarded minimum discount from MSRP or another
University-approved published manufacturer list-price basis, as further specified in Section 6.1, Section 12, and
Appendix C.
* When authorized by the University, the contractor shall furnish and install low-voltage BAS repair and
replacement components, including actuators, JACE controllers, field controllers, temperature sensors, pressure
sensors, differential-pressure sensors, humidity sensors, relays, transducers, power supplies, communications
devices, and other related control-system components. Before proceeding, the contractor shall submit an itemized
written quotation identifying the manufacturer, model or part number, quantity, applicable MSRP or other
University-approved published manufacturer list price, awarded contract discount percentage, net unit price,
extended material price, applicable pre-negotiated labor classification and fully burdened hourly rate, estimated
labor hours, and total not-to-exceed cost. Parts priced under the awarded discount method shall not receive an
additional material markup. No component replacement or installation shall proceed without written University
authorization, except where emergency direction is documented in accordance with University procedures.
* Use new, current-production, compatible components unless the University approves an alternate.
* Preserve existing sequences and graphics unless the task authorization expressly requires changes.
* Provide written root-cause findings for recurring or high-impact failures.
* Do not leave systems in hand, bypass, forced, overridden, or disabled condition without written notice and
University approval.
5.4 Programming, Graphics, and Integration
* Modify programs, databases, control logic, graphics, histories, schedules, and alarms only under written
authorization.
* Use Niagara-native and open-protocol methods where practicable and avoid unnecessary proprietary lock-in.
* Provide editable source files, station backups, databases, graphics files, point lists, program exports, license
documentation, and change logs.
* Perform peer review and functional testing before changes are placed into service.
* Coordinate IP addressing, ports, certificates, accounts, and firewall requirements with IT.
* All new, modified, extended, or replaced communications cabling and associated pathways, terminations,
patching, labeling, testing, grounding, bonding, and documentation shall comply with the current Salem State
University Information Technology wiring standards and shall be coordinated with and approved by University
Information Technology before installation. Where University Information Technology standards are more
stringent than manufacturer requirements or other referenced requirements, the University Information
Technology standards shall govern unless otherwise approved in writing by the University.
* No contractor-maintained hidden account, shared credential, backdoor, unapproved cloud tunnel, or persistent
remote agent is permitted.
5.5 Operator Support and Training
* Provide telephone and approved remote support during normal business hours.
* Provide a minimum of eight (8) hours of scheduled, on-campus technical support during each calendar month at
no additional cost beyond the fixed annual contract price. On-campus support shall be performed by qualified
BAS technical personnel and may include system diagnostics, programming assistance, operator support,
troubleshooting, preventive technical review, minor adjustments, and coordination with University Facilities and
Information Technology personnel. The University shall schedule and direct the use of these hours. Unused
monthly hours shall not be invoiced separately, converted to a credit, or carried forward to a subsequent month
unless otherwise approved in writing by the University.
6

Priority Example Acknowledgment Remote Response On-Site Target
P1 - Critical Campus or major building outage; loss of heat in freezing conditions; loss of central BAS supervision affecting critical operations 30 minutes 1 hour 4 hours, or approved alternative
P2 - Urgent Major equipment or network impairment with limited workaround 1 hour 2 hours Same business day
P3 - Routine Localized malfunction or noncritical repair 4 business hours 1 business day Within 3 business days
P4 - Planned Enhancement, programming, training, or scheduled repair 1 business day As scheduled As authorized

* Provide a minimum of four (4) hours of operator orientation and training during each contract year at no additional
cost beyond the fixed annual contract price.
* Training shall address navigation, alarms, schedules, trends, overrides, backups, basic troubleshooting, and
escalation procedures.
* Provide concise, University-owned training materials and a recording only if authorized by participants and
University policy.
5.6 Optional Project Services
The University may request separately priced services under task authorization, subject to the governing procurement
and contract limits: controls surveys; point-to-point verification; functional performance testing; small controller
replacements; graphics standardization; alarm rationalization; trend analysis; sequence optimization; energy-
conservation control adjustments; integration of supported third-party equipment; and record drawing updates. Work
determined to require a separate public construction procurement will not be ordered under this contract.
6. Service Levels and Work Authorization
Priority Example Acknowledgment Remote Response On-Site Target
Campus or major building outage; loss
of heat in freezing conditions; loss of 4 hours, or approved
P1 - Critical 30 minutes 1 hour
central BAS supervision affecting critical alternative
operations
Major equipment or network impairment
P2 - Urgent 1 hour 2 hours Same business day
with limited workaround
Localized malfunction or noncritical Within 3 business
P3 - Routine 4 business hours 1 business day
repair days
Enhancement, programming, training, or
P4 - Planned 1 business day As scheduled As authorized
scheduled repair
Clock exclusions apply only for documented University access restrictions, force majeure, unavailable owner-
furnished information, or approved parts lead time. The contractor shall continue remote diagnostics when useful and
provide status updates at intervals appropriate to the incident.
6.1 Task Authorization
* No extra work begins without a written task authorization or purchase order from an authorized University
representative.
* Each request shall identify scope, assumptions, exclusions, schedule, labor classification and hours, material and
subcontract cost, markup, not-to-exceed amount, deliverables, and acceptance criteria.
* For low-voltage BAS component repair or replacement, each quotation shall apply the applicable pre-negotiated,
fully burdened contract labor rates and the awarded minimum discount from MSRP or another University-
approved published manufacturer list-price basis. The contractor shall provide supporting price documentation
sufficient for the University to verify the applicable price basis, awarded discount, net material cost, quantities,
labor classifications, labor rates, estimated hours, and total proposed not-to-exceed cost. Parts priced under the
awarded discount method shall not receive an additional material markup. Freight, taxes, expedited delivery, and
other charges shall be separately identified and shall not be included unless permitted by the contract and
approved in writing.
* Emergency verbal direction, if permitted by University procedure, must be documented in writing by the next
business day and does not expand contract authority.
* The contractor shall notify the University before reaching 75 percent of a not-to-exceed amount and shall stop at
the authorized limit unless amended in writing.
7. Technical, Cybersecurity, and Documentation Requirements
7.1 Technical Standards
* Follow manufacturer requirements, approved submittals, record drawings, applicable codes, and recognized BAS
industry practices.
* Use BACnet device instance, network number, naming, and segmentation practices approved by the University.
* Ground network shields at one approved location where required by the applicable system design.
7

* Maintain controller and supervisor software at versions approved by the University. Updates shall not be installed
solely because a newer version exists.
* Verify backups and rollback capability before firmware, station, driver, or programming changes.
* Coordinate shutdowns and testing with Facilities and affected campus stakeholders.
7.2 Cybersecurity
* Comply with Salem State IT security, acceptable-use, identity, remote-access, data-handling, incident-reporting,
and change-management requirements provided during contracting.
* Use named user accounts, multifactor authentication where available, least privilege, and University-approved
remote-access methods.
* Do not store University credentials in unencrypted files or personal password managers.
* Report suspected compromise, malware, credential exposure, unauthorized access, or material vulnerability
immediately through University-designated channels.
* Provide a software bill of materials or component inventory for newly introduced software, gateways, appliances,
and libraries when requested.
* At contract end, return University data, remove contractor access, certify deletion of retained copies except
records legally required, and assist with credential rotation.
7.3 Required Documentation
* Daily field service ticket for each visit.
* Change log identifying date, technician, asset, before/after condition, files changed, reason, test, and rollback
status.
* Updated point lists, controller databases, graphics, sequences, network diagrams, and record drawings for
authorized changes.
* Encrypted backup package after every material change and at least annually.
* Open-items register with owner, status, priority, recommended action, budget estimate, and target date.
* Monthly summary of calls, response performance, recurring issues, authorized spend, and upcoming
maintenance.
8. Staffing, Safety, and Campus Operations
8.1 Key Personnel
Identify an account manager, lead controls engineer/technician, emergency dispatcher, cybersecurity contact, and
backup personnel. Key staff substitutions require advance notice and personnel of equal or better qualifications.
8.2 Background and Conduct
Personnel shall follow University identification, access, parking, anti-harassment, student privacy, residential access,
and conduct requirements. Contractor staff shall remain under contractor supervision.
8.3 Safety
Submit task-specific job hazard analyses when requested. Coordinate lockout/tagout, hot work, energized electrical
work, roof access, ladders/lifts, confined spaces, asbestos/lead awareness, chemical use, and occupied-space
controls. Stop work upon discovering an unanticipated hazard.
8.4 Campus Continuity
Schedule disruptive work during approved windows. Maintain temporary control or safe manual operation where
approved. Protect teaching, research, residence life, athletics, library, dining, event, and administrative operations.
8.5 Environmental Practices
Minimize waste, recycle packaging and replaced electronics where lawful, prevent refrigerant or hazardous-material
releases, and provide disposal documentation when requested.
All removed, replaced, failed, obsolete, or surplus printed circuit boards, controllers, electronic modules, power
supplies, communications devices, and other electronic equipment or electronic waste generated through
performance of the contract shall remain the property of Salem State University and shall be surrendered to the
University at a location designated by Facilities. The contractor shall not remove, discard, recycle, sell, retain, or
otherwise dispose of such materials unless specifically authorized in writing by the University. All removed or replaced
batteries, including controller, backup, rechargeable, lead-acid, lithium, alkaline, and other battery types, shall also be
surrendered to Salem State University for recycling or disposal through University-approved channels. Electronic
8

Deliverable Due Acceptance Basis
Mobilization plan and contact matrix Within 10 business days after notice to proceed Complete, approved by Facilities and IT as applicable
Baseline asset register and condition report Within 45 days Accurate, secure, traceable to drawings and field verification
Seasonal PM report Within 5 business days after visit Checklist complete; findings, readings, changes, backups, and recommendations included
Emergency incident report Within 2 business days after stabilization Timeline, root cause, actions, remaining risk, and prevention recommendation
Monthly service report By the 10th of following month Calls, hours, response, open items, spend, and next actions reconciled
Annual backup and documentation package Before contract anniversary Restorable, encrypted, indexed, and transferred to University custody
Closeout package Within 10 business days after expiration/termination Access removed, data returned, open items transferred, final invoice reconciled
Initial BAS infrastructure and system- health assessment, including software/firmware modernization plan Within 90 calendar days after contract start Complete asset and system-health findings; prioritized, actionable upgrade plan; versions, dependencies, costs, impacts, and schedule identified
Section Required Content
A. Cover Letter Legal name, address, authorized signer, RFP acknowledgment, proposal validity, and commitment to perform.
B. Executive Approach Understanding of campus environment, mobilization, PM methodology, incident response, quality control, and transition.
C. Firm Qualifications Relevant history, company structure, locations, staffing depth, manufacturer/technology capabilities, and financial capacity.
D. Key Personnel Resumes, roles, certifications, years of relevant experience, availability, and backup coverage.
E. Technical Plan Methods for backups, programming, graphics, network troubleshooting, calibration, seasonal testing, documentation, and training.
F. Cybersecurity Plan Remote access, identity, credential protection, vulnerability response, logging, data return, and incident notification.
G. Service Levels Dispatch, escalation, after-hours coverage, response tracking, parts logistics, and continuity approach.
H. Similar Projects At least three references for comparable institutional BAS service contracts completed or active within the last five years.
I. Exceptions Specific exceptions with proposed alternate language. Silence means acceptance, subject to the final contract.

components and batteries shall be safely handled, protected from damage and short circuit, segregated as
appropriate, and transferred with an itemized record identifying the originating building or asset, component type,
quantity, and transfer date.
9. Deliverables and Acceptance
Deliverable Due Acceptance Basis
Within 10 business days after notice to
Mobilization plan and contact matrix Complete, approved by Facilities and IT as applicable
proceed
Baseline asset register and condition Accurate, secure, traceable to drawings and field
Within 45 days
report verification
Checklist complete; findings, readings, changes,
Seasonal PM report Within 5 business days after visit
backups, and recommendations included
Within 2 business days after Timeline, root cause, actions, remaining risk, and
Emergency incident report
stabilization prevention recommendation
Calls, hours, response, open items, spend, and next
Monthly service report By the 10th of following month
actions reconciled
Annual backup and documentation Restorable, encrypted, indexed, and transferred to
Before contract anniversary
package University custody
Within 10 business days after Access removed, data returned, open items
Closeout package
expiration/termination transferred, final invoice reconciled
Complete asset and system-health findings;
Initial BAS infrastructure and system-
Within 90 calendar days after contract prioritized, actionable upgrade plan; versions,
health assessment, including
start dependencies, costs, impacts, and schedule
software/firmware modernization plan
identified
Acceptance does not waive latent defects, warranty obligations, cybersecurity responsibilities, or correction of
inaccurate documentation.
10. Proposal Content and Format
Organize the technical proposal using the following tabs or electronic bookmarks. Omission of required information
may affect responsiveness or rating.
Section Required Content
Legal name, address, authorized signer, RFP acknowledgment, proposal validity, and commitment to
A. Cover Letter
perform.
Understanding of campus environment, mobilization, PM methodology, incident response, quality
B. Executive Approach
control, and transition.
Relevant history, company structure, locations, staffing depth, manufacturer/technology capabilities,
C. Firm Qualifications
and financial capacity.
D. Key Personnel Resumes, roles, certifications, years of relevant experience, availability, and backup coverage.
Methods for backups, programming, graphics, network troubleshooting, calibration, seasonal testing,
E. Technical Plan
documentation, and training.
Remote access, identity, credential protection, vulnerability response, logging, data return, and incident
F. Cybersecurity Plan
notification.
G. Service Levels Dispatch, escalation, after-hours coverage, response tracking, parts logistics, and continuity approach.
At least three references for comparable institutional BAS service contracts completed or active within
H. Similar Projects
the last five years.
Specific exceptions with proposed alternate language. Silence means acceptance, subject to the final
I. Exceptions
contract.
9

Section Required Content
J. Required Forms Certifications, tax forms, non-collusion/good-faith forms, insurance evidence, and other forms in the final package.
Criterion Highly Advantageous Advantageous Not Advantageous
Relevant BAS Experience Extensive comparable higher- education or multi-building experience; strong evidence of successful N4/Honeywell support and mixed-protocol systems. Adequate comparable experience with minor limitations. Limited or weakly relevant experience; material capability gaps.
Technical Approach Detailed, credible, asset-based plan with strong QA, backup, testing, documentation, and lifecycle methods. Generally sound plan with acceptable detail. Generic, incomplete, risky, or overly proprietary approach.
Personnel and Coverage Deep qualified team, clear roles, strong certifications, local/rapid coverage, and credible backups. Qualified team and acceptable coverage. Insufficient qualifications, availability, or backup depth.
Service and Response Robust dispatch, escalation, reporting, parts support, and measurable SLA management. Meets basic service requirements. Response model is unclear or does not meet requirements.
Cybersecurity and IT Coordination Mature controls, named accountability, approved-access model, and strong incident/data practices. Acceptable controls with minor gaps. Material security, access, or data-handling weaknesses.
Documentation and Knowledge Transfer Complete owner-controlled deliverables, editable files, transparent changes, and effective training. Adequate documentation and training. Proprietary dependency or inadequate owner documentation.
References and Performance Excellent verified performance on comparable contracts. Generally satisfactory references. Unsatisfactory, unverifiable, or materially concerning references.
Category Draft Weight
Technical and Management Proposal 55 points
Interview / Demonstration, if conducted 15 points
Price Proposal 30 points
Total 100 points

Section Required Content
Certifications, tax forms, non-collusion/good-faith forms, insurance evidence, and other forms in the
J. Required Forms
final package.
The separate price proposal shall use Appendix C without alteration except to add requested detail.
11. Evaluation and Award
The University will first determine responsiveness and responsibility. Responsive technical proposals meeting all
minimum qualifications will then be evaluated using the published comparative criteria. Price will be evaluated
separately. Final weights and scoring must be confirmed in the issued RFP.
Criterion Highly Advantageous Advantageous Not Advantageous
Extensive comparable higher-
education or multi-building Limited or weakly relevant
Relevant BAS Adequate comparable
experience; strong evidence of experience; material capability
Experience experience with minor limitations.
successful N4/Honeywell support and gaps.
mixed-protocol systems.
Detailed, credible, asset-based plan
with strong QA, backup, testing, Generally sound plan with Generic, incomplete, risky, or
Technical Approach
documentation, and lifecycle acceptable detail. overly proprietary approach.
methods.
Deep qualified team, clear roles,
Qualified team and acceptable Insufficient qualifications,
Personnel and Coverage strong certifications, local/rapid
coverage. availability, or backup depth.
coverage, and credible backups.
Robust dispatch, escalation,
Meets basic service Response model is unclear or
Service and Response reporting, parts support, and
requirements. does not meet requirements.
measurable SLA management.
Mature controls, named
Cybersecurity and IT accountability, approved-access Acceptable controls with minor Material security, access, or
Coordination model, and strong incident/data gaps. data-handling weaknesses.
practices.
Complete owner-controlled
Proprietary dependency or
Documentation and deliverables, editable files, Adequate documentation and
inadequate owner
Knowledge Transfer transparent changes, and effective training.
documentation.
training.
References and Excellent verified performance on Generally satisfactory Unsatisfactory, unverifiable, or
Performance comparable contracts. references. materially concerning references.
11.1 Proposed Evaluation Weights
Category Draft Weight
Technical and Management Proposal 55 points
Interview / Demonstration, if conducted 15 points
Price Proposal 30 points
Total 100 points
Suggested evaluation process: independent review, consensus scoring, reference checks, optional interview or
scenario demonstration, price analysis, responsibility determination, and written award recommendation. Any
interview must use consistent core questions and documented scoring.
12. Pricing and Payment
* Provide a fixed annual price for all base preventive-maintenance, support, reporting, training, and included travel
described in the proposal.
10

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Bid Number Title Bid Notice Release Date Bid Package File Instructions Addendum Bid

City of Somerville

Bid Due: 12/02/2026

Header Information Bid Number: BD-27-1288-LMPD-LMPD-135176 Description: IFB - ON-CALL HVAC PREVENTIVE MAINTENANCE &

Commonwealth of Massachusetts

Bid Due: 11/24/2026

Project ID: Title: 51 Inman Fire Protection Sprinkler Modifications and Related Improvements -

City of Cambridge

Bid Due: 12/17/2026

Bid Number Title Bid Notice Release Date Bid Package File Instructions Addendum Bid

City of Somerville

Bid Due: 12/02/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.