| Location: | New Mexico |
|---|---|
| Posted: | Aug 9, 2026 |
| Due: | Sep 7, 2026 |
| Agency: | City of Santa Fe |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: 70-M0087-26-EM078 - Airport Runway Patch Work
Addenda: 0
Release Date: 8/7/2026
Due Date: 9/7/2026
Approval of Emergency Procurement for the amount of $21,172.29 to GM Emulsions for emergency patch work on Airport runway.
Emergency patch work was done to the runway at the Santa Fe Regional Airport on 8.5.26. This patch posed as a safety risk to incoming flights and required the Airport to close the runway until repairs were completed. Staff at the airport spoke to Travis Dutton-Leyda who approved this work to be done and submitted as an emergency within 72 hours.

With GovernmentContracts, you can:
...and other high-risk conditions. Problems Solved: DC Recruiter solves this problem by using... ...
ENERGY, DEPARTMENT OF
Bid Due: 12/15/2026
..., prototype risk reduction, fabrication/purchase, assembly, integration, and testing of directed energy...
DEPT OF DEFENSE
Bid Due: 8/10/2027
...and simulation (M&S), design, component/subsystem, prototype risk reduction, fabrication...
DEPT OF DEFENSE
Bid Due: 8/10/2027
...treatment optimization and development efficiency, reducing technical risk and accelerating translation... therapeutic effect ...
ENERGY, DEPARTMENT OF
Bid Due: 12/03/2026