Main Street Well 3 & Newport Well 3 Improvements Project (2026/2027) - CIP No. 60177
| Location: |
California |
| Posted: |
Aug 9, 2026 |
| Due: |
Sep 15, 2026 |
| Agency: |
City of Tustin |
| Type of Government: |
State & Local |
| Category: |
- Y - Construction of Structures and Facilities
- Z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No: |
CIP No. 60177 |
| Publication URL: |
To access bid details, please log in. |
Project ID: CIP No. 60177
Title: Main Street Well 3 & Newport Well 3 Improvements Project (2026/2027) - CIP No. 60177
Addenda: 0
Release Date: 8/7/2026
Due Date: 9/15/2026
Main Street Well 3 & Newport Well 3 Improvements Project (2026/2027) - CIP No. 60177
Invitation for Bids
Public Works
Project ID: CIP No. 60177
Release Date: Friday, August 7, 2026
·
Due Date: Tuesday, September 15, 2026 2:00pm
Posted
Friday, August 7, 2026 4:31pm
All dates & times in Pacific Time
Draft Response Events RSVP No Bid
Time Remaining:
36 days, 19 hours, 38 minutes
Post Information
Posted At:Fri, Aug 7, 2026 4:31 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview
NOTICE IS HEREBY GIVEN that the CITY OF TUSTIN, hereinafter referred to as City or AGENCY invites sealed bids for the above stated project and will receive sealed bids for the construction, materials, supplies, equipment and/or services set forth herein, subject to all conditions outlined in the Bid Package.
Scope of Work: The Work encompassed by the Project is more specifically defined in the Contract Documents, but in general consists of, but is not limited to the following Work:
Main Street Well #3:
-
Perform pre-removal testing and document existing pump and motor operating conditions.
-
Remove, transport, inspect, test, and evaluate the existing pump and motor; submit condition-assessment reports.
-
Perform downhole video inspection and submit well-condition assessment report.
-
Convert the existing oil-lubricated lineshaft system to a continuous water-lubricated configuration, where indicated and authorized.
-
Perform brushing, bailing, chemical treatment, dual-swab airlifting, redevelopment, and related well rehabilitation only when authorized by the City based on inspection results.
-
Rehabilitate, rewind, reinstall, or replace the existing pump and/or motor as authorized by the City.
-
Reinstall the approved rehabilitated or replacement pump and motor and provide a complete operational pumping system.
-
Perform startup, performance, vibration, electrical, operational testing, flushing, disinfection, and post-rehabilitation inspection where required.
-
Restore disturbed areas and complete closeout requirements.
Newport Well #3:
-
Perform pre-removal testing and document existing pump and motor operating conditions.
-
Remove, transport, inspect, test, and evaluate the existing pump and motor; submit condition-assessment reports.
-
Perform downhole video inspection and noninvasive electromagnetic casing-thickness/integrity analysis; submit well-condition assessment report.
-
Because Newport Well No. 3 is considered fragile, perform well cleaning, redevelopment, casing repair, or other downhole rehabilitation only when specifically authorized by the City.
-
Rehabilitate, rewind, reinstall, or replace the existing pump and/or motor as authorized by the City.
-
Install new magnetic flow meter and MOV on the waste-discharge piping.
-
Remove and replace the existing magnetic flow meter and MOV on the system-discharge piping.
-
Remove existing electrical equipment as needed and furnish/install new electrical, controls, instrumentation, PLC, and SCADA work where required.
-
Reinstall the approved rehabilitated or replacement pump and motor and provide a complete operational pumping system.
-
Perform startup, performance, vibration, electrical, operational testing, flushing, disinfection, meter/MOV testing, and post-work inspection where required.
-
Restore disturbed areas and complete closeout requirements.
Project Schedule (contract days):
150 Days
Engineer’s Estimate: $
775,000
Liquidated Damages: $
1,000 Per Day
Bid Valid (calendar days):
60 Days
Contractor's License(s):
Class A
Timeline
Advertisement/Release Project Date:
August 7, 2026
Pre-Bid Meeting (Mandatory):
August 20, 2026, 10:00am
Begin at Main Street Well No. 3 (235 E. Main St., Tustin)
Question Submission Deadline:
August 27, 2026, 5:00pm
Bid Opening:
September 15, 2026, 2:00pm
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...Follow Shasta Trinity NF Drinking Water Sampling & Testing Active Contract Opportunity Notice...) ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/25/2026
...Project ID: 060-3118801-MB Title: Testing, Insulation and Repair of Boilers & Water Heaters... ...
Orange County
Bid Due: 10/09/2026
...Project ID: 060-3118801-MB Title: Testing, Insulation and Repair of Boilers & Water Heaters... ...
Orange County
Bid Due: 9/17/2026
...Category Information UNSPSC 60104200 Teacher resources materials - Water testing & conservation... & ...
State Government of California
Bid Due: 9/29/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.