Lube Unit Slide In Service Utility Body

Location: Pennsylvania
Posted: Aug 31, 2026
Due: Sep 14, 2026
Agency: State Government of Pennsylvania
Type of Government: State & Local
Category:
  • 25 - Vehicular Equipment Components
Solicitation No: 6100066623
Publication URL: To access bid details, please log in.

General Information

Department for this solicitation:
Procurement

Date Prepared:

08/31/26
Types:
IFB

Advertisement Type:
Service Materials Service & Materials PW Construction Agency Construction Real Estate

Solicitation/Project#:
6100066623
Solicitation/Project Title:
Lube Unit, Slide In (Service Utility Body)

Description:
This purpose of these specification drawings describes minimum requirements for slide in lube units to be attached in the bed of existing Department shop trucks. Slide In Lube Units shall have four 60-gallon storage tanks with all necessary pumps, lines, fittings and reels to make a complete operating system to dispense and store oils, waste oil and anti-freeze. Slide in lube unit shall have a grease system with all necessary pumps, lines, fittings and reels to make a complete grease system. Slide in lube unit may be used in all types of weather environments and shall be constructed to now allow infiltration of weather elements into storage tanks. The slide in lube unit shall be capable of being operated from a central air supply from an existing air compressor on the Department shop truck.

Department Information

Department/Agency:
Department of Transportation
Delivery Location:

1700 Arsenal Blvd  Harrisburg Pa 17120

County:

Dauphin
Duration:

90 Days

Contact Information

First Name:
Jessica
Last Name:
Shughart

Phone Number:

(XXX-XXX-XXXX)
717-783-8559
Email:
jeshughart@pa.gov

Solicitation Information

Bids must be received by the purchasing agency on the Solicitation Due Date no later than the Solicitation Due Time as set forth in the solicitation. Any conflict between the dates and/or times contained in the solicitation itself or its attachments and this advertisement shall be resolved in favor of the solicitation.


Solicitation Start Date:

08/31/26

Solicitation Due Date:

09/14/26
Solicitation Due Time:

12:00 PM

Solicitation Opening Date:

09/14/26
Solicitation Opening Time:

12:01 PM

Opening Location:

1700 Arsenal Blvd  Harrisburg Pa 17120

No. of Addendums:

0

Amended Date:
08/31/26
Related Solicitation Files

Original Files
Spec-087705-SLIDE IN LUBE UNIT 8-28-26.pdf
EQN-540-1.pdf
EQN-540-2.pdf
EQN-540-3.pdf
1075 Genl Reg's for Bidding DOT Equipment.pdf
blank lube and component.xls
BOP-2201 EO 2021-06 Worker Protection Form BOP 02072022 FINAL.docx


Attachment Preview

-1-
SPECIFICATIONS
087705
LUBE UNIT, SLIDE IN
INDEX
I.
GENERAL EQUIPMENT SPECIFICATIONS:
A. Intent Statement
B. Slide in Lube Unit
1. Understructure Frame
2. Tanks
3. Chassis Grease Pump
4. Pumps
5. Reels
6. Paint
7. Safety
II. Drawings
III. Manuals
IV. Warranty
August 28, 2026, GAW
-2-
SPECIFICATIONS
I. GENERAL EQUIPMENT SPECIFICATIONS:
A. INTENT STATEMENT:
Pennsylvania Department of General Services, PCID No. 1075, “General Requirements for Bidding
PENNDOT Vehicles/Equipment”, most current version effective at the time and date of bid opening is
included as a part of this specification. PCID No. 1075 may be reviewed and downloaded from the
Department of General Services website, http://www.dgs.state.pa.us.
Delivery as required per Department of General Services PCID NO. 1075 Section “G”. All units must be
delivered within 90 days after receipt of the purchase order by the successful bidder.
Pursuant to Executive Order 2021-06, Worker Protection and Investment (October 21, 2021), the
Commonwealth is responsible for ensuring that every Pennsylvania worker has a safe and healthy work
environment and the protections afforded them through labor laws. To that end, contractors and grantees
of the Commonwealth must certify that they are in compliance with all applicable Pennsylvania state
labor and workforce safety laws. Such certification shall be made through the Worker Protection and
Investment Certification Form (BOP-2201) and submitted with the bid, proposal or quote.
This specification drawings describes minimum requirements for slide in lube units to be attached in the
bed of existing Department shop trucks. Slide in Lube units shall have four 60-gallon storage tanks with
all necessary pumps, lines, fittings, and reels to make a complete operating system to dispense and
store oils, waste oil and anti-freeze. Slide in lube unit shall have a grease system with all necessary
pumps, lines, fittings and reels to make a complete grease system. Slide in lube unit may be used in all
types of weather environments and shall be constructed to not allow infiltration of weather elements into
storage tanks. The slide in lube unit shall be capable of being operated from a central air supply from an
existing air compressor on the Department shop truck.
Awarded OEM vendor shall be responsible for contacting the Specification Section of the Fleet
Management Division at (717) 787-1567 to set up a pre-build meeting for all chassis and body mounting
component locations prior to chassis build. Any deviations to the specification must be granted in writing
by the Chief of the Specification Section. It shall be understood that any discrepancies/deviations
between the specification and the completed unit(s), chassis or body up-fitter related, must be addressed
and corrected prior to the delivery deadline and the Departments acceptances.
It is understood that the components specified are minimum. The burden of responsibility is
hereby placed on the manufacturers engineering department to supply a unit that is totally
engineered.
-3-
SPECIFICATIONS
I.
GENERAL SPECIFICATIONS: (Continued)
B. SLIDE IN LUBE UNIT:
1. UNDERSTRUCTURE FRAME:
Unit shall be constructed to fully accommodate the weight of the unit when fully loaded with material.
Framework shall be steel, and all joints shall be fully welded. There shall be a hold down system on all
four corners to secure unit to the bed of truck. There shall be two forklift slots evenly spaced to aid in
mounting and dismounting unit from truck. Inside dimensions shall be 7 inches wide by 3 inches high.
Reference EQN-540, Sheet 3
2. TANKS:
There shall be four (4) sixty (60) gallon tanks. Tanks shall be constructed using 3/16-inch thickness
aluminum. There shall be a vented weatherproof fill cap on each tank. Tanks shall be labeled by product.
Two shall be used for oil products (motor oil, transmission fluid, hydraulic oil etc.), one shall be used for
anti freeze, and one shall be used for waste oil. Tanks shall be securely mounted to the understructure
frame.
Reference EQN-540, Sheet 1.
3. CHASSIS GREASE PUMP:
There shall be a 50 to 1 ratio grease pump, including tie downs, top plate, and follower plate. Unit shall
be capable of being secured to the understructure frame in a manner that allows for exchanging out
grease drums. All necessary fittings and hoses to make a complete operating system shall be supplied.
Reference EQ-540, Sheet 2.
4. PUMPS:
The two oil tanks shall each have an air operated piston pump at a 5 to 1 ratio. Each pump shall be
equipped with a filter lubricator regulator. All necessary fittings and hoses to make a complete operating
system shall be supplied. Reference Lincoln 40 series pump or approved equal.
The anti freeze tank shall be equipped with an air operated diaphragm pump at a 1 to1 ratio. Pump shall
be equipped with a filter lubricator regulator. All necessary fittings and hoses to make a complete
operating system shall be supplied.
The waste oil tank shall be equipped with an AEROQUIP part number FF9330A-01 FLOCS pump. All
necessary fittings and hoses to make a complete operating system shall be supplied.
5. REELS:
All (Except Chassis Grease) hose reels shall be mounted securely to the understructure frame and
mounted facing the rear of the unit. Chassis grease reel shall be mounted above on a secure bracket,
shall be braced sufficiently as to not allow any lateral movement. Reference EQN-540, Sheet 3.
The chassis grease shall be a high-pressure spring-loaded heavy duty large capacity chassis lube
service reel equipped with a 50 feet two wire braid hose with a 3/8 inch inside diameter.
Unit will be used to lube vehicles and equipment in temperatures from 0 degrees to 90 degrees F. Hose
shall be equipped with a "Z" swivel and control handle. Ref: LINCOLN Model 94553H Hose Reel
w/81729 Swivel and 3050 Control; GRACO 237034 350 Series Grease Reel with 242058 Grease valve &
224569 Swivel Zee. No deviations.
-4-
SPECIFICATIONS
I.
GENERAL SPECIFICATIONS: (Continued)
B. SLIDE IN LUBE UNIT: (Continued)
5. REELS: (Continued)
The engine oil shall be a heavy-duty large capacity spring loaded fluid reel equipped with a 50 feet x 1/2
inch inside diameter single wire braid hose. It will be used to dispense multi-viscosity motor oil at
temperatures between 0 degrees F and 90 degrees F. Hose shall be equipped with a totalizing control.
Ref: LINCOLN 85009-50B Hose Reel w/3867 Countdown Meter; BALCRANK 820418 Reel Package
w/1485 Control Handle; or GRACO 237022 350 series reel With GRACO 255200 metered valve non-drip
nozzle. No deviations.
The remaining oil and anti freeze shall be medium pressure heavy duty large capacity spring loaded
reels equipped with a 50 feet x 1/2 inch inside diameter single wire braid hose. Units will be used to
dispense either Universal Tractor Fluid, premixed antifreeze or hydraulic oil in temperatures from 0
degrees F to 90 degrees F. Hose shall be equipped with a volume control handle.
Ref: LINCOLN Model 85009-50B Hose Reel w/776 Volume Control Handle; BALCRANK 820415 Hose
Reel Package w/1481 Handle; or GRACO 237022 350 series reel and GRACO 247712 valve for oil &
247715 valve for Anti-freeze. No deviations.
The FLOCS reel shall be capable of handling 30 feet x 1-inch diameter single wire braid hose. All
necessary fittings and hoses to make a complete operating system shall be supplied.
6. PAINT:
All steel exterior surfaces shall be cleaned and properly prepared prior to painting. The frame shall be
painted black in color.
Factory colors for pumps & reels is acceptable.
All aluminum surfaces to be cleaned and unpainted.
7. SAFETY:
All corners/sharp edges shall be angled, rounded or a protective covering added.
Manufacturer shall install all safety decals, warning labels, guards and devices available as standard
equipment on all equipment supplied.
II. DRAWINGS:
EQN-540
dated
04-15-13
sheets 1,2,3 SLIDE IN LUBE UNIT
The above referenced drawings shall become part of these specifications.
These drawings reflect the intent of the Department, and any discrepancies shall be resolved at the
meeting between the vendor and the Equipment Chief, or the pre-production inspection of the unit.
DRAWINGS APPEAR AT THE END OF THE SPECIFICATIONS.
-5-
SPECIFICATIONS
III. MANUALS:
The successful vendor shall furnish all applicable manuals per unit:
1 Operator's
1 Parts
1 Service
0 Engine
0 Transmission (Automatic or Manual)
1 Body and Sub-frame (Parts and Service)
1 Complete set of manuals for any additional items/equipment added to a piece of equipment.
The manuals listed shall be official O.E.M. publications supplemented with technical manuals for all
components as published by sub-vendors/manufacturers.
Parts Manual presented must be relative to "all" items utilized to build these units, with appropriate part
numbers.
All manuals shall be supplied on thumb drive in PDF format that can be loaded to a dedicated website.
Paper manuals may be supplied if available from manufacture. Paper manuals do not relieve the
requirement for thumb drives.
Delivery of manuals shall be completed with the delivery of each unit.
IV. WARRANTY:
The complete unit shall be warranted for a period of 2 years. Warranty shall cover all parts, labor,
shipping and travel required to repair the unit. If the unit needs returned to the vendor’s place of business
for repairs, it shall be the sole responsibility of the vendor to pick up & return the unit to the PennDOT
location.
The warranty start-up date shall be defined as the date of transfer from the PennDOT Fleet Management
Division to the designated county location.
This will be considered the date of delivery to the county and NOT the date of delivery by the successful
bidder to the Department.
The PennDOT Fleet Management will supply the actual start-up date, equipment number, and serial
number of the machine, via email, to the successful bidder.
It is the responsibility of the successful bidder to ensure that the equipment manufacturer recognizes and
applies the Department’s actual warranty start-up date in their database.
This warranty is in effect as follows, starting from the date that the vehicle is placed into service by the
Department. Warranty shall not be voided due to Department operation as explained in the Intent
Statement. It is understood that the components specified are minimum and if the manufacturer's
Engineering Department recommends or deems necessary a more robust component, other than
specified, be installed to meet the vehicles intent statement and to not void the warranty, it shall be the
bidders/vendor’s responsibility.
Warranty on all parts will be for minimum two (2) calendar years or manufacturer’s standard commercial
term (whichever is greater), from date of departments acceptance. If the manufacturer neglects or fails to
correct defect(s) during the warranty period, their responsibility shall continue until such time as it takes
to correct the defect(s). The manufacturer is expected to respond to warranty problems and administrate
effective solutions in the best interest of the Commonwealth.
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...: Municipal Waste Services Description: The purpose of the Municipal Waste Services ITQ ...

State Government of Pennsylvania

Bid Due: 6/30/2027

...Removal Services Description: The purpose of the Hazardous/Residual Waste Removal Services ITQ... HAZARDOUS/RESIDUAL ...

State Government of Pennsylvania

Bid Due: 12/31/2031

...Follow Waste Water Treatment Services Newton Square PA Active Contract Opportunity Notice ID... ...

DEPT OF DEFENSE

Bid Due: 9/21/2026

...Services E Waste Itq Contract 4400009722 Must Submit A Bid In Response To ...

State Government of Pennsylvania

Bid Due: 12/31/2099

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.