| Location: | South Carolina |
|---|---|
| Posted: | Aug 24, 2025 |
| Due: | Sep 19, 2025 |
| Agency: | County of Greenville |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFP #26025 |
| Publication URL: | To access bid details, please log in. |
Project ID: RFP #26025
Title: Design Services for East Dorchester Blvd. Bridge Replacement
Addenda: 0
Release Date: 8/22/2025
Due Date: 9/19/2025
We are requesting proposals from qualified engineering consultants to provide design services for replacement of the existing East Dorchester Blvd. bridge between Bruce Road and Pine Creek Drive in Greenville. The bridge spans a tributary of Brushy Creek near its discharge into Brushy Creek immediately downstream of where Brushy Creek goes under I-85. The existing bridge is a concrete, 75'L x 38.5'W two lane bridge on timber piles with timber cross-bracing. The bridge is weight restricted.
The new bridge is anticipated to be similar in size to the existing structure. The scope of work will consist of all surveying, geotechnical, design, permitting, utility coordination, bid document preparation, and construction engineering inspection associated with design and construction.
The bridge is nearing the end of it's useful life. Recent inspections indicate damaged piles, which do not pose an imminent threat to the public. However, the County has deemed full replacement of the existing structure as the best remediation.

With GovernmentContracts, you can:
..., 17 hours, 27 minutes Post Information Posted At:Fri, May 15, 2026 2:55 ...
County of Greenville
Bid Due: 6/12/2026
...0002: The purpose of this Amendment is to post the Site Visit Sign ...
DEPT OF DEFENSE
Bid Due: 6/18/2026
...hours, 18 minutes Post Information Posted At:Wed, May 13, 2026 5:00 PM Sealed ...
Richland County
Bid Due: 6/16/2026
...CHS Question and Answer Form Post updated Specification (Removing 3.11 from Section 01 ...
DEPT OF DEFENSE
Bid Due: 6/15/2026