REQUEST FOR PROPOSAL FOR
ENERGY EFFICIENCY INVESTMENT GRADE AUDIT AND IMPLEMENTATION
OF RELATED CONSERVATION MEASURES FROM ENERGY SERVICES
COMPANY (ESCO)
The Santa Barbara Unified School District (“District”) is seeking
proposals/Qualifications from qualified persons or entities (“Responders”) to
provide energy efficiency investment grade audit and implementation of related
conservation measures from an energy service company (ESCO). The District
seeks an Energy Services Company (ESCO) to maximize energy and related
operational cost savings to pay for facility upgrades, improvements, and services.
These upgrades, improvements, and services will be implemented via an Energy
Savings Performance Contract (“ESPC” or “Contract”).
Statements/proposals in the prescribed form must be received by January 16,
2025, by 2:00 p.m. at the Santa Barbara Unified School District Administration
Office, 720 Santa Barbara Street, Santa Barbara, California 93101. Attention:
Marina Verdian
The Request for Proposals (RFP) will be on file and available to view, download
through the District website at www.sbunified.org. Additional information may be
obtained by contacting the Santa Barbara Unified School District, attention
Marina Verdian, Director of Facilities and Operations, 724 Santa Barbara Street,
Santa Barbara, CA 93101; 805-963-4338 X 6238 or mverdian@sbunified.org
The Santa Barbara Unified School District reserves the right to reject any and all
submissions at its discretion.
BY THE ORDER OF THE BOARD OF EDUCATION OF THE SANTA BARBARA
UNIFIED SCHOOL DISTRICT
By: Marina Verdian, Director of Facilities and Modernization
Published: December 4, 2025, December 11, 2025.
SANTA BARBARA UNIFIED SCHOOL DISTRICT
REQUEST FOR QUALIFICATIONS AND PROPOSALS
TO PROVIDE ENERGY EFFICIENCY INVESTMENT
GRADE AUDIT AND IMPLEMENTATION OF RELATED
CONSERVATION MEASURES FROM ENERGY
SERVICES COMPANY (ESCO)
SBUSD # 08-25/26
SANTA BARBARA UNIFIED SCHOOL DISTRICT
724 Santa Barbara Street, Santa Barbara, CA 93101
Date Issued: December 4, 2025
Deadline for Submittal of Qualifications/Proposals: January 16, 2026, 2:00 pm.
SBUSD #08-25/26 - REQUEST FOR QUALIFICATION AND PROPOSAL FOR ENERGY EFFICIENCY IGA AND ECM IMPLEMENTATION
PAGE 1
TABLE OF CONTENTS
SECTION 1: PROJECT-SPECIFIC INFORMATION AND REQUIREMENTS
A. BASIC SCOPE AND NEEDS OF THE CONTRACT:
B. MINIMUM QUALIFICATIONS
C. PROCUREMENT SCHEDULE FOR REQUEST FOR PROPOSALS:
D. SUBMITTAL INFORMATION
E. PRE-PROPOSAL MEETING
F. SUBMITTAL FORMAT
SECTION 2 – PROPOSAL EVALUATION
A. EVALUATION OF PROPOSALS, AND SELECTION OF THE ESCO:
B. EVALUATION CRITERIA
SECTION 3 – DISTRICT REQUIREMENTS
A. OTHER INFORMATION
EXHIBIT A – PROPOSAL CONTENT AND FORMAT
DEFINITIONS AND ACRONYMS
ATTACHMENT A – FACILITY TECHNICAL PROFILE
FACILITY TECHNICAL PROFILE
ATTACHMENT B – INVESTMENT GRADE AUDIT CONTENTS
SAMPLE INVESTMENT GRADE AUDIT AGREEMENT
INVESTMENT GRADE AUDIT AGREEMENT
EXHIBIT A - Investment Grade Audit Scope of Work
EXHIBIT B – Notice of Acceptance of IGA Report
EXHIBIT C – Measurement and Verification Plan
EXHIBIT D – Project Pricing Format
ATTACHMENT E – ENERGY SERVICES AGREEMENT
MODEL ENERGY SERVICES AGREEMENT
MODEL ENERGY SERVICES AGREEMENT
SBUSD #08-25/26 - REQUEST FOR QUALIFICATION AND PROPOSAL FOR ENERGY EFFICIENCY IGA AND ECM IMPLEMENTATION
PAGE 2
SECTION 1: PROJECT-SPECIFIC INFORMATION AND
REQUIREMENTS
A.BASIC SCOPE AND NEEDS OF THE CONTRACT:
The District is a public school district which serves approximately 12,000 students at 18
elementary and junior and senior high schools. A list of sites and District information is
available on the District Web Site (www.sbunified.org/schools/). For more detailed facility
information see Attachment A- Facility Technical Profile
The Santa Barbara Unified School District (the “District” or “SBUSD”) seeks an Energy Services
Company (ESCO) to maximize energy and related operational cost savings to pay for facility
upgrades, improvements and services. These upgrades, improvements, and services will be
implemented via an Energy Savings Performance Contract (“ESPC” or “Contract”).
The ESCO shall be qualified to conduct an Investment Grade Audit (“IGA”) and implement an
ESPC to install Energy Conservation Measures (“ECMs”) to provide energy and maintenance
cost-saving equipment and services. The purpose of this Contract is to focus on energy
efficiency, sustainability, greenhouse gas reduction, equipment maintenance/repair, etc.
The ESCO, through its work under this Contract, shall support the District’s interest in improving
the energy and water efficiency across their portfolio of facilities and maintaining the energy and
water savings for the life of the Contract. The ESCO shall evaluate opportunities for
electrification of fossil-fueled systems, wherever technically and financially feasible. The ESCO
shall seek all available funding opportunities including federal and state funding and separate
grant or rebate opportunities to support the guaranteed savings in funding the upfront and
on-going project costs.
Facility upgrades, operational improvements, and on-going maintenance, management, and
monitoring services to be funded through an ESPC, which:
a. Incurs no initial capital costs but with an option for SBUSD to provide initial
capital if desired;
b. Achieves significant long-term operating efficiencies, cost savings and/or carbon
emission reduction;
c. Provides an annual cost savings and performance guarantee over the term of the
contract;
d. Maintains improvements in, and consistent levels of, operational functionality;
e. Realizes additional related benefits such as reduced maintenance needs, facility
improvements, deferred maintenance, and occupant comfort;
f. Maintains consistency with all applicable state and local codes and standards.
Designs shall comply with all relevant building codes and shall meet or exceed
any SBUSD performance specifications provided;
g. Maximizes financial benefits from participation in utility sponsored energy
efficiency and demand response programs, as well as other Federal or State
grant programs;
PAGE 3
SBUSD #08-25/26 - REQUEST FOR QUALIFICATION AND PROPOSAL FOR ENERGY EFFICIENCY IGA AND ECM IMPLEMENTATION
h. The ESCO will include in the proposal, Investment Grade Audit, and subsequent
Performance Contract, the cost for a Third-Party Consultant or internal staff to
assist in the evaluation of the selected ESCO’s proposed cost-saving measures,
and oversight during both implementation and the performance period.
SCOPE OF SERVICE - PROJECT PHASES
Comprehensive Services: It is the intent of SBUSD to utilize a single ESCO to implement the
comprehensive services described in each phase below. The Investment Grade Audit (IGA)
scope, costs, and savings are non-transferable between ESCOs due to the conflicts of interest
and potential risks that may arise for both SBUSD and the ESCO.
Phase 1 - Preliminary Assessment: The selected ESCO shall conduct a district-wide
Preliminary Assessment (PA) at-risk to identify the potential energy and operational savings
measures, determine potential cost and savings of the project as a whole, and present a
measurement and verification plan with a proposed project cash flow to present to the District.
Phase 2 - Investment Grade Audit and Project Development: Upon completion, review, and
acceptance of the Preliminary Assessment, the District in its sole discretion may enter into an
Investment Grade Audit Agreement (IGAA) with the ESCO to conduct an IGA. This IGA shall
build upon the Phase 1 – Preliminary Assessment and shall be a district-wide IGA to further
identify energy and operational savings measures, determine the cost and savings of each
measure, and present a measurement and verification plan and commissioning plan to verify
the project savings. A project proposal shall present a comprehensive package of measures
that can be financed through guaranteed savings over the proposed ESPC contract term which
shall not exceed 20 years. The District, at its sole option, shall choose the financing approach
and contract term. The ESCO shall submit the IGA Report to the District for review and
approval. The scope & approach of the IGA shall align with the Exhibit A – Scope of Work
detailed in the Sample IGAA in Attachment B.
Phase 3 – ESA/Financing: The District reserves the right to evaluate all forms of financing and
will determine financing structure, cost, and financial terms for the performance contract. When
negotiations are concluded, the District may issue a Notice to Proceed (“NTP”). Through the
Energy Services Agreement (ESA), the ESCO shall proceed to final design, construction, and
commissioning of the improvement measures. The ESA shall define the final agreed upon list of
measures, equipment, and labor costs, guaranteed cost savings, measurement & verification
plans, and additional relevant information. The document shall identify equipment specifications
and warranties and establish the schedule and responsibilities of the ESCO and the District.
Phase 4 – Design, Implementation, and Commissioning: Upon issuance of a Notice to
Proceed, the ESCO shall continue the design process from the IGA phase and initiate
construction. The ESCO shall work continuously with its sub-contractors for each ECM to
provide interim design plans, design drawings, and equipment submittals to SBUSD for review.
Designs shall comply with adopted building codes and receive required permits. Design
charrette(s) shall be held with the ESCO and SBUSD personnel, and submittal reviews at the
30%, 60%, and 95% levels shall be performed by the District. The review process should be
documented accordingly, so that the appropriate designs and related equipment match the final
IGA scopes of work and meet the original ECM intent. During the IGA phase, the ESCO will
provide a construction schedule which includes estimated completion dates for the following:
ECM installation, commissioning (Cx), post-installation Measurement & Verification (M&V),
punch list, and final acceptance. Throughout the implementation phase, this schedule shall be
PAGE 4
SBUSD #08-25/26 - REQUEST FOR QUALIFICATION AND PROPOSAL FOR ENERGY EFFICIENCY IGA AND ECM IMPLEMENTATION