| Location: | California |
|---|---|
| Posted: | May 26, 2026 |
| Due: | Jun 25, 2026 |
| Agency: | Sutter County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | B2201 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, transportation and services necessary for the Live Oak Canal Bridge Replacement at Sanders and Larkin Roads. The work includes removal of existing bridge and roadway elements, excavation, traffic control, storm water pollution prevention measures, construction of a reinforced concrete box culvert and retaining wall, installation of aggregate base and hot mix asphalt, guardrail systems, drainage improvements, pavement delineation, reflective thermoplastic striping and markings, and all associated restoration work necessary to complete the project. The work limits are shown on the Project Plans and associated contract documents.

With GovernmentContracts, you can:
...Project ID: Title: Citywide Striping - Phase 3 Addenda: 0 Release Date: 10/27/2026 ...
City of Napa
Bid Due: 11/16/2026
...Basic Information Title Install lighting, striping, and signage upgrades. Agency Department...
State Government of California
Bid Due: 11/19/2026
...West Rail Safety Project - Near-Term Improvements (NTI) consists of proposed signage and ...
City of Oakland
Bid Due: 11/19/2026
...concrete, and pavement striping. Copies of the Contract Documents may be downloaded from ...
City of Turlock
Bid Due: 11/04/2026