| Location: | Florida |
|---|---|
| Posted: | Aug 24, 2025 |
| Due: | Sep 25, 2025 |
| Agency: | Toho Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB-25-038 |
| Publication URL: | To access bid details, please log in. |
Project Description: Includes the installation of approximately 191 lineal feet of 24” steel casing 0.25” thick 10” SDR 35 PVC via jack and bore, 118 lineal feet of 10” SDR 35 PVC gravity main along with three,10 – 15 vertical feet manholes to be installed and one, 10 – 15 vertical feet manholes to be removed and replaced via open cut, asphalt roadway open cut and repair with final mill and resurfacing, concrete curb removal and replacement, isolation valves, fire hydrants, new residential services, relocation of existing meters requiring access to private property and Osceola County applicable permits and the usual appurtenances. The Project also includes the abandonment in place of existing gravity mains via grouting.

With GovernmentContracts, you can:
...Belmonte Road and Pershing Way Utility Improvements, Water Main and Sewer Improvements and ...
City of West Palm Beach
Bid Due: 6/23/2026
...to Sewer Project Addenda: 0 Release Date: 5/23/2026 Due Date: 6/23/2026 Follow ITB ...
Citrus County
Bid Due: 6/23/2026
...Improvements, Water Main and Sewer Improvements and Sanitary Sewer Lift Station #9 Improvements ...
City of West Palm Beach
Bid Due: 6/16/2026
...assemblies; the rehabilitation of approximately 17,200 linear feet of gravity sewer mains... to ...
City of Pembroke Pines
Bid Due: 6/23/2026