| Location: | Hawaii |
|---|---|
| Posted: | Jan 25, 2026 |
| Due: | Feb 26, 2026 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: The Contractor shall provide all labor, tools, equipment, and materials to perform all work related to relocating ALL NON-BUILT-IN FURNITURE into the hallway/foyer, then demolishing cove bases and approximately 880 Square Feet (SF) of existing carpet flooring, then prepping and installing approximately 880 SF of vinyl floor tiles in the HIARNG RTI Administration building.
All furniture encountered in this project is to be relocated in a manner which is non-destructive and that can ensure that it can be put back in like or better condition.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
|

With GovernmentContracts, you can:
...Day Date Time Area ADD/ / AMD GCA# Project 06/15/26 11:00am Oahu 36084-117 ...
General Contractors Association
Bid Due: 6/15/2026
...Day Date Time Area ADD/ / AMD GCA# Project 06/12/26 2:00pm Oahu 35996-871 ...
General Contractors Association
Bid Due: 6/12/2026
..., consisting of reinforced concrete foundation, exterior walls and flooring, windows, roofing, mechanical...
General Contractors Association
Bid Due: 6/16/2026