| Location: | Iowa |
|---|---|
| Posted: | Dec 19, 2024 |
| Due: | Jan 30, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912EK25B0014 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The U.S. Corps of Engineers (USACE} has a requirement for road, trail, and infrastructure repairs at Saylorville lake that includes, but is not limited to, removal of existing aggregate base, preparation of existing aggregate base, compacted Portland cement or fly ash modified base course, new compacted aggregate base, compacted aggregate shoulders, topsoil placement, fill, excavation/cut, asphalt pavement patching, asphalt cement concrete (ACC) milling, asphalt crack/joint sealing, ACC pavement demolition and removal, saw cut asphalt, trail section replacement, bituminous fog coat, hot mix asphalt (HMA) binder course, HMA surface course, Portland cement concrete (PCC) milling, concrete crack/joint sealing, PCC pavement and curb and gutter demolition and removal, steel reinforcement, concrete curb and gutter, concrete pavements and slabs, PCC sidewalks, synthetic fiber reinforcement, seeding, geotextile, pavement marking, steel-backed timber guardrail installation, detectable warning panels, site restoration, and related incidental work.
Estimated Range: Above $10,000,000.00
This action is an Unrestricted Invitation for Bids (IFB) (Full and Open Competition)
See the attached Solicitation and attachments for a detial description of the requirement
| Jan 30, 2025 | [Solicitation (Updated)] Saylorville Lake roads, trails, and infrastructure Repair IDIQ FY25 |

With GovernmentContracts, you can:
...-509-1373 Construction manager: Claire Vorthmann cev@iastate.edu 515-686-0957 Design Professional... West Des Moines Iowa ...
Iowa State University
Bid Due: 10/13/2026
...Construction manager: Claire Vorthmann cev@iastate.edu 515-686-0957 Design Professional: Alyssa Iverson...@mbionline.com McGraw-Hill Construction Dodge ...
Iowa State University
Bid Due: 10/29/2026
...Cho namho-cho@uiowa.edu Estimated Construction Cost: $159,503.00 Pre Bid Date: 9/29/26 Pre Bid... Location: ...
University of Iowa Facilities Management
Bid Due: 10/14/2026
...estimated construction cost range for this project is $150,000 to $250,000. Completion Dates...: ...
State Government of Iowa
Bid Due: 10/27/2026