| Location: | Oklahoma |
|---|---|
| Posted: | Sep 1, 2026 |
| Due: | Sep 23, 2026 |
| Agency: | City of Stillwater |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 10-2026 Addendum 1 |
| Publication URL: | To access bid details, please log in. |
Bid Information
| Type | Invitation For Bid |
| Status | Issued |
| Number | 10-2026 Addendum 1 (Lake McMurtry Pump Station) |
| Issue Date & Time | 8/31/2026 10:15:00 AM (CT) |
| Close Date & Time | 9/23/2026 03:00:00 PM (CT) |
| Question Cut Off Date | 9/16/2026 05:30:00 PM (CT) |
| Notes |
Notice is hereby given that the Stillwater Utilities Authority will receive bids for the construction of:
Lake McMurtry Secondary Raw Water System Raw Water Pump Station Project # 23WT03 SUA Bid No. 10-2026 Scope of work to primarily include the following: Construction of a new 24-million gallon per day (mgd) McMurtry Raw Water Pump Station including a CMU Building, five (5) vertical turbine pumps and motors with variable frequency drives, pump pumping and valves, yard piping, electrical components, access road and complete restoration of all areas disturbed by the work.
Bids will only be received electronically through https://stillwater.ionwave.net until 3:00 PM on Wednesday, September 23, 2026. Bids shall be opened and read aloud by the Office of the City Clerk at the above stated time. Bid opening will occur in Room 1112 "B" of the Norman McNickle Municipal Complex, 723 South Lewis, Stillwater, Oklahoma, 74074.
To register for the City’s online bidding portal, visit https://stillwater.ionwave.net.
Bids shall be submitted as stated in the Instructions to Bidders.
Any bid received by the City Clerk more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for the opening of bids, or any bid so received after the time set for opening of bids, shall not be considered and shall be returned unopened to the bidder submitting same. Bids will be referred to city staff for evaluation. Stillwater Utilities Authority may award a contract to the "lowest and best responsible bidder". Stillwater Utilities Authority reserves the right to reject any or all bids or portions thereof and to waive any technicalities in the bidding process. No bid may be altered, withdrawn, or resubmitted within 45 days after the date set for the opening of bids. The documents describing the requirements for this request for bids may be examined at https://stillwater.ionwave.net. Questions regarding the bid package should be directed through the City’s bid portal, Ionwave. Each bidder is required to submit with their bid a guarantee in the form of an acceptable bidder's bond, a certified check, or a cashier's check on a solvent bank in the state of Oklahoma, and in the amount of not less than five percent (5%) of the amount bid. The successful bidder shall execute a contract within 14 calendar days of Notice of Award by the Stillwater Utilities Authority. A contract embodying the terms set forth in the bidding documents shall be executed by the Stillwater Utilities Authority within 60 days of the award of the Contract. The successful bidder shall file a performance bond, maintenance bond, statutory bond and certificates of insurance in the statutory amounts for public liability and workers compensation insurance at the time of signing the contract. Any agreement entered into as a result of this invitation to bid shall be construed under the laws of the State of Oklahoma, and the venue for enforcement of the agreement shall be Payne County in the State of Oklahoma. Stillwater Utilities Authority may issue addenda as may be necessary in the best interest of the public and the City of Stillwater. Addenda issued through Ionwave may amend the date and/or time for receipt of bids or any specification, item, document, or requirement in the Bidding Documents.
A MANDATORY pre-bid conference will be held on Wednesday, September 2, 2026 at 1:00 p.m. local time in Room 2073 of the Norman McNickle Municipal Building, 723 South Lewis, Stillwater, Oklahoma. Anyone desiring to submit a bid is REQUIRED to attend this meeting in person.
|
| Name | John McClenny |
| Address |
723 S. Lewis Street
Stillwater, OK 74074 USA |
| Phone | |
| Fax | |
| john.mcclenny@stillwaterok.gov |
| File Name | Description | File Size | ||
|
||||
|
_Addendum01_23WT03.pdf
|
Addendum #1 | 818 KB | 355687 | 7631687 |
|
23WT03_McMurtryRWPS_Vol 1_TechSpecs_IssuedforBid (1).pdf
|
Project Manual Volume 1 | 8.03 MB | 355687 | 7625790 |
|
23WT03_McMurtryRWPS_Vol 2_TechSpecs_IssuedforBid.pdf
|
Project Manual Volume 2 | 4.92 MB | 355687 | 7625791 |
|
23WT03_McMurtryRWPS_Dwgs_IssuedforBid.pdf
|
Plans | 185.28 MB | 355687 | 7625789 |
|
014K_Bid Bond.pdf
|
Bid Bond | 447 KB | 355687 | 6930791 |
|
Business Relationships Affd.pdf
|
Business Relationships Affidavit | 115 KB | 355687 | 6930792 |
|
Non Collusion Affd.pdf
|
Non Collusion Affidavit | 118 KB | 355687 | 6930804 |
| 017N_Certificate NonDiscrimination.doc (please login to view this document) | Non Discrimination Certificate | 30 KB | 355687 | 5171765 |

With GovernmentContracts, you can:
...are selected as "Lowest Responsible" bidder; current general liability insurance information along... with ...
State of Oklahoma - Commissioners of the Land Office
Bid Due: 9/30/2026
...; current general liability insurance information along with worker's compe nsation or insurance ...
State of Oklahoma - Commissioners of the Land Office
Bid Due: 9/30/2026
...afforded TERO bidders under the CED procurement and contracting policies and procedures. INSURANCE... ...
Cherokee Nation
Bid Due: 9/28/2026