| Location: | Utah |
|---|---|
| Posted: | Oct 13, 2025 |
| Due: | Nov 13, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 10/25 Public Works |
| Publication URL: | To access bid details, please log in. |
Project Description: This is the third phase of the project to reconstruct the roadway and replace all of the utilities in the Main Street Right-of-Way from 500 South to 700 South. This includes replacing the culinary waterline and laterals, pressurized irrigation waterline and laterals, sewer main and laterals, adding a new storm drain system and power. The roadway will be reconstructed from the back of sidewalk to the back of sidewalk for the two block length.

With GovernmentContracts, you can:
...Project: Rose Park Golf Course Irrigation and Turf Reduction / Nibley Park Golf ...
State Government of Utah
Bid Due: 9/30/2026
...walk, ramps, and flatwork, addition of plantings, and modifications of existing irrigation and ...
State Government of Utah
Bid Due: 9/30/2026
...of the expansion of an existing concrete lined irrigation pond. Pre-Bid Conference: A ...
State Government of Utah
Bid Due: 10/01/2026
...and irrigation improvements at West Haven City Windsor Park, including grading, concrete and ...
West Haven city
Bid Due: 9/30/2026