| Location: | Missouri |
|---|---|
| Posted: | Oct 21, 2026 |
| Due: | Nov 13, 2026 |
| Agency: | Missouri Department of Transportation(MDOT) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| New Posting | Posting Date | Project Number | Solicitation | LPA Contact | LPA Phone | LPA Email | Due Date |
| NEW | 10/21/26 | The State Technical College of Missouri, State Technical College of Missouri Airport, Obstacle (Tree) Clearing, Aviation Hangar Development, Airfield Electrical Replacement, etc. | Brad Crede | brad.crede@statetechmo.edu | 11/13/26 |
NOTICE TO AIRPORT ENGINEERING CONSULTANTS
The State Technical College of Missouri (Sponsor) is hereby soliciting Statements of Qualifications and
Experience from qualified consultants for airfield development projects at the State Technical College of
Missouri Airport (K1H3) located in Linn, Missouri. Projects may be subject to future receipt of Federal
funding under the Federal Aviation Administration (FAA) Airport Improvement Program, as administered by
the Missouri Department of Transportation (MoDOT) through the State Block Grant Program (SBGP). These
projects may include the following:
1. Obstacle (Tree) Clearing, Estimated value $200,000
2. Aviation Hangar Development, Estimated value $10,500,000
3. T-Hangar Development, Estimated value $1,300,000
4. H-Hangar Apron Reconstruction, Estimated value $1,700,000
5. Airfield Electrical Replacement, Estimated value $800,000
6. Runway Pavement Rehabilitation and Marking, Estimated value $250,000
7. Grading and Drainage Improvements, Estimated value $200,000
8. Seal Coat & Pavement Repairs to Taxiways, Estimated value $150,000
The required services include, but are not limited to, engineering services for preliminary, design, bidding,
and construction phases and incidental special services including survey, architectural, and geotechnical.
Additionally, preparing categorical exclusion documentation, as-built ALP updates, and other miscellaneous
tasks may be required. The consultant should provide the name(s) of preferred firm(s) for any work which is
likely to be sub-consulted. Subconsultant changes can occur with Sponsor approval. At the Sponsor's
discretion, this selection can be retained for projects initiated within five years or until all projects are
complete. Projects other than those listed above will require a new solicitation except as allowed in FAA
Advisory Circular 150/5100-14 paragraph 2.7.2 (4). Disclosure: Under a previous agreement, WSP assisted
the Sponsor with preparation of their CIP and the above cost estimates.
A qualification-based selection process conforming to FAA Advisory Circular 150/5100-14 and 8.285, RSMo.,
et seq. will be utilized to select the most qualified firm. Selection criteria will include:
* Recent experience in similar airport projects
* Capability to perform all aspects of the project
* Ability to meet schedules within budget
* Knowledge of FAA/MoDOT design and construction standards, regulations, policies, and procedures
* Quality of previous airport projects undertaken
* Personnel experience and qualifications
* Familiarity with, and proximity to, the project
* For projects utilizing FAA grant funds, an implemented Affirmative Action Program
Fees will be negotiated for projects as federal funds become available. Consultants shall not include fee or
cost information when responding to this solicitation. Prospective consultants are advised that applied
overhead rates must be in accordance with the cost principles established within Federal Regulation 48 CFR
Part 31, Contract Cost Principles and Procedures. After selection, the successful firm will be required to
submit a copy of their current overhead rate audit certification or MoDOT pre-qualification.
The agreement(s) between the Sponsor and the selected consultant will be subject to all applicable local
and State laws, as well as Federal Rules and Regulations as identified in AC 150/5100-14E. The most current
version of the Federal Contract Provisions for A/E agreements will be included in each agreement.
Statements must be concise and contain no more than fifteen (15) pages of material single-sided.
This excludes the front and back covers, the two-page cover letter, table of contents, section
dividers, and resumes. The consultant should also provide an affidavit of compliance with the
federal work authorization program and a copy of the firm's E-Verify Memorandum of
Understanding. Consultants must submit five (5) hard copies of their Statement and a PDF of their
Statement (submitted via email) to the following person:
State Technical College of Missouri
Attention: Brad Crede, Facility Director
1 Technology Drive
Linn, MO 65051
brad.crede@statetechmo.edu
All statements must be received by 5:00 p.m. on November 13, 2026. Statements received after this
deadline will not be considered. The Sponsor reserves the right to reject any and/or all Statements and
waive any irregularities. Submittals will become property of the Sponsor.
Statements are to be provided in a package marked with "Airport Statement of Qualifications". Please
make the email subject line: "Airport Statement of Qualifications" and request delivery/read receipts to
confirm it was received on time.
All questions must be submitted via email to the below contact by 5:00 p.m. on November 6, 2026. Answers
will be sent via reply email.
Brad Crede
Facility Manager
brad.crede@statetechmo.edu

With GovernmentContracts, you can:
Shaw Park Tennis Center Fence Replacement Project Department: Parks and Recreation Category: Construction,
City of Clayton
Bid Due: 11/19/2026
Bid # Title Ad Specs Addendum Plan Holder 26-064 Guthrie Road Bridge 3210021
City of Ofallon
Bid Due: 12/01/2026
Guthrie Road Bridge 3210021 Repairs 26-064 StatusAccepting Bids Prebid Date 11/18/26 10:00am Bid
Drexel Technologies
Bid Due: 12/01/2026
2026 Sanitary Sewer Maintenance Project: White Oak West SSM-2024-01 StatusAccepting Bids Bid Date
Drexel Technologies
Bid Due: 11/18/2026