Fabrication and Installation of Storefront Awnings

Location: California
Posted: Oct 21, 2026
Due: Nov 17, 2026
Agency: City of Temple City
Type of Government: State & Local
Category:
  • 71 - Furniture
  • D - Automatic Data Processing and Telecommunication Services
Publication URL: To access bid details, please log in.
Bid Title: Fabrication and Installation of Storefront Awnings
Category: Bids
Status: Open
Publication Date/Time:
10/20/2026 12:00 AM
Closing Date/Time:
11/17/2026 2:00 PM
Submittal Information:
City Clerk | 9701 Las Tunas Drive
Pre-bid Meeting:
10/28/2026 at 2:00 PM
Contact Person:
Adam Talbot, Project Manager
pwbids.templecity@transtech.org
Download Available:
Yes
Plan & Spec Available:
See Appendix B and C
Business Hours:
8:00 a.m. to 5:00 p.m.
Miscellaneous:
Competitive Bidding and Design Intent

The City is soliciting competitive bids from qualified contractors for the fabrication and installation of storefront awnings. The drawings provided in Appendix C were prepared by a third-party vendor to illustrate the City's design intent and establish a basis for bidding. The identification of that vendor on the drawings does not indicate a preference for or endorsement of that company. All qualified contractors are encouraged to submit bids. The successful bidder will be responsible for preparing final engineered shop drawings, obtaining required approvals, and fabricating and installing the awnings in accordance with the project specifications.

See Appendix B and C for Design and Specifications

Related Documents:

Attachment Preview

CITY OF TEMPLE CITY, CALIFORNIA
BIDDING AND CONTRACT DOCUMENTS, PLANS AND SPECIFICATIONS
for
FABRICATION & INSTALLATION OF STORE FRONT AWNINGS
FOR LAS TUNAS DRIVE STREETSCAPE PROJECT
CITY PROJECT ID: P24-06
Date Issued: October 20, 2026
There will be a non-mandatory pre-bid meeting for this project at the
project site on October 28, 2026, at 2:00 PM.
Meeting Point: 5944 Temple City Blvd, Temple City, CA 91780
Bid Due Date:
November 17, 2026, 2:00 PM
Submit bids to:
Office of the City Clerk
City of TEMPLE CITY
9701 Las Tunas Drive, TEMPLE CITY, CA 91780

TABLE OF CONTENTS
DESCRIPTION SECTION
NOTICE INVITING SEALED BIDS A
INSTRUCTIONS TO BIDDERS B
BIDDER'S PROPOSAL (Entire section C shall be submitted with the bid) C
BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND PAGES IN SECTION "C. BIDDER'S PROPOSAL"
GENERAL PROVISIONS D
SPECIAL PROVISIONS E
APPENDICES:
APPENDIX A - SAMPLE CONTRACT TO BE EXECUTED
APPENDIX B - TECHNICAL PROVISIONS
APPENDIX C - DESIGN INTENT DRAWINGS - FOR PRICING ONLY / NOT FOR CONSTRUCTION

Pre-Bid Meeting (Non-Mandatory):
There will be a non-mandatory pre-bid meeting for this project at the project site on October 28,
2026, at 2:00 PM. (Meeting Point: 5944 Temple City Blvd, Temple City, CA 91780). While the pre-bid
meeting is non-mandatory, it is highly recommended that all interested bidders/prime
contractors/sub-contractors/vendors attend the pre-bid meeting.
Bidding and Contract Documents, Plans and Specifications Available:
1. Please e-mail your request with your contact information to: pwbids.templecity@transtech.org.
Upon receipt of your e-mail, you will be registered as a plan holder, and a pdf file of the Bidding
and Contract Documents, Plans and Specifications will be e-mailed to you at no cost.
2. Hard copies will not be mailed.
Pre-Bid Inquiries:
All questions regarding this bid shall be directed via email, no later than 10 calendar days prior to the
Bid due date and time, to Adam Talbot, Project Manager at pwbids.templecity@transtech.org . Any
questions received after this deadline will not be answered. It is the responsibility of the bidder to
confirm transmission of correspondence.
Location of Work:
Locations of work is shown on 'Appendix C - DESIGN INTENT DRAWINGS - FOR PRICING ONLY / NOT
FOR CONSTRUCTION'
Estimated Cost of Work:
Estimated cost for bid schedule is in the range of $65,000.00.

A. NOTICE INVITING FORMAL SEALED BIDS
FABRICATION & INSTALLATION OF STORE FRONT AWNINGS
FOR LAS TUNAS DRIVE STREETSCAPE PROJECT
CITY PROJECT ID: P24-06
City of Temple City
PUBLIC NOTICE IS HEREBY GIVEN that the City of Temple City invites sealed bids for the above stated
project and will receive such bids in the office of the City Clerk, City of Temple City, 9701 Las Tunas Drive,
Temple City, CA 91780, up to the hour of 2:00 PM on November 17, 2026. The bids received will be
publicly opened approximately 15 minutes after the bid submittal deadline in the City Hall.
This Notice Inviting Formal Sealed Bids will be advertised in a newspaper of general circulation, printed,
and published in the jurisdiction of the City of Temple City at least fourteen (14) calendar days before the
bid opening date.
Pre-Bid Meeting (Non-Mandatory):
There will be a non-mandatory pre-bid meeting for this project at the project site on October 28,
2026, at 2:00 PM. (Meeting Point: 5944 Temple City Blvd, Temple City, CA 91780). While the pre-bid
meeting is non-mandatory, it is highly recommended that all interested bidders/prime
contractors/sub-contractors/vendors attend the pre-bid meeting.
Bidding and Contract Documents, Plans and Specifications Available:
Copies of the Bidding and Contract Documents, Plans and Specifications can be obtained as follows:
1. Please e-mail your request with your contact information to: pwbids.templecity@transtech.org.
Upon receipt of your e-mail, you will be registered as a plan holder, and a pdf file of the Bidding
and Contract Documents, Plans and Specifications will be e-mailed to you at no cost.
2. Hard copies will not be mailed.
Pre-Bid Inquiries:
All questions regarding this bid shall be directed via email, no later than 10 calendar days prior to the
Bid due date and time, to Adam Talbot, Project Manager at pwbids.templecity@transtech.org. Any
questions received after this deadline will not be answered. It is the responsibility of the bidder to
confirm transmission of correspondence.
Scope of Work:
The work consists of furnishing all materials, equipment, tools, labor, and incidentals as described in
detail in the Bidding and Contract Documents, Plans and Specifications to construct the project.
Location of Work:
Locations of work is shown on 'Appendix C - DESIGN INTENT DRAWINGS - FOR PRICING ONLY / NOT
FOR CONSTRUCTION'
Estimated Cost of Work:
Estimated cost for bid schedule is in the range of $65,000.00.
Retention:
The City will deduct a State-mandated 5 percent retention from all progress payments.
Page: A.1

Project Completion:
The project shall be completed per the schedule specified in Section "B. INSTRUCTIONS TO BIDDERS",
Subsection "CONSTRUCTION SCHEDULE, PROGRESS OF WORK, LIQUIDATED DAMAGES".
Bid Bond:
Bids must be accompanied by a bid bond, made payable to the City of TEMPLE CITY for an amount no
less than ten percent (10%) of the bid amount.
Required License Classification:
Required License Classification is State of California, California CSLB C-61/D-3 (Awnings Contractor) or
B - General Building Contractor. No bid will be accepted from a Contractor who has not been licensed
in accordance with the provisions of the Business and Professions Code.
Federal Funds:
DBE:
There is no mandatory DBE Participation requirement. All bidders are required to comply with all
applicable competitive bidding and labor compliance laws including, but not limited to, active
solicitation of subcontract bids from minority-owned businesses, women-owned businesses, and
businesses owned by disabled veterans. The City hereby notifies all qualified bidders that it will
affirmatively ensure that qualified minority business enterprises will be afforded full opportunity to
submit bids in response to this invitation and will not be discriminated against on the basis of race,
color, national origin, ancestry, sex, religion, or handicap in consideration for an award. Attention is
directed to the provisions of Section 1777.5 (Chapter 1411, Statutes of 1968) and 1777.5 of the Labor
Code concerning the employment of apprentices by the Contractor's or any such subcontractors
under hire. The bidders and the selected Contractor shall not allow discrimination in employment
practices on the basis of race, color, national origin, ancestry, sex, religion, or handicap.

Project Completion:
The project shall be completed per the schedule specified in Section "B. INSTRUCTIONS TO BIDDERS",
Subsection "CONSTRUCTION SCHEDULE, PROGRESS OF WORK, LIQUIDATED DAMAGES".
Bid Bond:
Bids must be accompanied by a bid bond, made payable to the City of TEMPLE CITY for an amount no
less than ten percent (10%) of the bid amount.
Required License Classification:
Required License Classification is State of California, California CSLB C-61/D-3 (Awnings Contractor) or
B - General Building Contractor. No bid will be accepted from a Contractor who has not been licensed
in accordance with the provisions of the Business and Professions Code.
SB 854 Requirements
This project is subject to the requirements of SB 854. No prime contractor or subcontractor may be
listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless
registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. No
prime contractor or subcontractor may be awarded a contract for public work on a public works
project (awarded on or after April 1, 2015) unless registered with the Department of Industrial
Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring
and enforcement by the Department of Industrial Relations. The bid proposal must include a printout
from the DIR registration website showing that the prime contractor and each subcontractor is
currently registered. No bid proposals will be accepted, nor any contract entered into with a prime
contractor without proof of registration as required above. [Unless within the limited exceptions from
this requirement for bid proposals only under Labor Code Section 1771.1(a)]. The prime contractor
will be required to post job site notices regarding Labor Code compliance as described in 8 California
Code of Regulation section 16451(d).
Prevailing Wages Required:
Prevailing wages shall be paid to all workers in accordance with California Labor Code 1771. A copy
of the prevailing wages schedule is on file with the City.
Federal Funds:
There are no Federal Funds utilized for this project.
DBE:
There is no mandatory DBE Participation requirement. All bidders are required to comply with all
applicable competitive bidding and labor compliance laws including, but not limited to, active
solicitation of subcontract bids from minority-owned businesses, women-owned businesses, and
businesses owned by disabled veterans. The City hereby notifies all qualified bidders that it will
affirmatively ensure that qualified minority business enterprises will be afforded full opportunity to
submit bids in response to this invitation and will not be discriminated against on the basis of race,
color, national origin, ancestry, sex, religion, or handicap in consideration for an award. Attention is
directed to the provisions of Section 1777.5 (Chapter 1411, Statutes of 1968) and 1777.5 of the Labor
Code concerning the employment of apprentices by the Contractor's or any such subcontractors
under hire. The bidders and the selected Contractor shall not allow discrimination in employment
practices on the basis of race, color, national origin, ancestry, sex, religion, or handicap.
Page: A.2

Adam Talbot, Project Manager
pwbids.templecity@transtech.org

Bonds Required:
A labor and materials payment bond is required in accordance with California Civil Code 9550 in a
form approved by the City. Also, a performance bond and public improvement warranty are required.
See Sample Contract for the required bond forms.
Substitution of Securities for Retention:
The contractor may deposit securities in lieu of the 5% progress payment retentions in accordance
with California Public Contracts Code 22300.
Excavation Safety:
If the work involves an excavation or trench five feet or deeper, the bid must contain a separate bid
item for adequate sheeting, shoring, bracing and safety measures approved by the City.
City Business License:
The successful Contractor and his subcontractors will be required to possess business licenses from
the City.
In entering into a public works contract, or a subcontract, to supply goods, services, or materials pursuant
to a public works contract, the Contractor, or subcontractors, offers and agrees to assign to the awarding
body all rights, title and interest in, and to, all causes of action it may have under Section 4 of the Clayton
Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of
Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or
materials pursuant to the public work's contract or subcontract. This assignment shall be made and
become effective at the time the awarding body tenders final payment to the Contractor, without further
acknowledgment by the parties.
Bids must be prepared on the approved Proposal forms in conformance with the Instructions to Bidders
and submitted in a sealed envelope plainly marked on the outside. Bids must be accompanied by a bid
bond, made payable to the City of Temple City for an amount no less than 10 percent of the amount of
bid.
The City reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under
advisement for a period of 60 calendar days.
Any contract entered into pursuant to this notice shall become effective or enforceable against the City
of TEMPLE CITY only when the formal written contract has been duly executed by the appropriate officers
of the City.
Submittal of your bid assumes that you have made a thorough and complete investigation of the project
site and that you have discovered no apparent discrepancies between the scope of work set forth in the
plans and specifications and the actual field conditions.
If there are any questions regarding this project, please contact in writing via e-mail:
Adam Talbot, Project Manager
pwbids.templecity@transtech.org
All inquiries must be submitted in writing.
BY ORDER of the City of Temple City, California.
Page: A.3

FABRICATION & INSTALLATION OF STORE FRONT AWNINGS
FOR LAS TUNAS DRIVE STREETSCAPE PROJECT
CITY PROJECT ID: P24-06

B. INSTRUCTIONS TO BIDDERS
FABRICATION & INSTALLATION OF STORE FRONT AWNINGS
FOR LAS TUNAS DRIVE STREETSCAPE PROJECT
CITY PROJECT ID: P24-06
City of Temple City
LOCATION OF WORK
The exact location of the project is outlined in the drawings, specifications, and other Contract Documents
on file at the office of the City Clerk of the City of Temple City. See Appendix C for Project Plans.
PROPOSAL FORMS
Bids shall be submitted in writing on the Proposal forms provided by the City. All information requested
therein must be clearly and legibly set forth in the manner and form indicated. The City will not consider any
proposal not meeting these requirements.
PROPOSAL GUARANTEE
Proposals must be accompanied by a proposal guarantee consisting of a bid bond payable to the City of
Temple City in the amount not less than 10 percent of the total amount of bid. Any proposal not accompanied
by such a guarantee will not be considered. If a bidder to whom a contract is awarded fails or refuses to
execute the contract documents or furnish the required insurance policies and bonds as set forth in those
documents, the proposal guarantee shall be forfeited to the City. The proposal guarantees of all bidders will
be held until the successful bidder has properly executed all contract documents.
DELIVERY OF PROPOSAL
Proposals shall be enclosed in a sealed envelope plainly marked on the outside:
FABRICATION & INSTALLATION OF STORE FRONT AWNINGS
FOR LAS TUNAS DRIVE STREETSCAPE PROJECT
CITY PROJECT ID: P24-06
City of Temple City
DO NOT OPEN WITH REGULAR MAIL
Proposals may be mailed or delivered by messenger. However, it is the bidder's responsibility alone to ensure
delivery of the proposal to the hands of the City's designated official prior to the bid opening hour stipulated
in the Notice Inviting Bids. Late proposals will not be considered.
CONSTRUCTION SCHEDULE, PROGRESS OF WORK, LIQUIDATED DAMAGES
In accordance with the Standard Specifications, and/or as may be provided for within the herein Special
Provisions, after notification of award and prior to start of any work, the Contractor shall submit to the City
Engineer for approval its proposed Construction Schedule. At a scheduled date prior to commencement of
work, the Contractor and all subcontractors shall attend a pre-construction conference at the City Hall.
Page: B.1

Task No Description Date
Step 1. City Task Contract award by the City Council. Date 1
Step 2. City Task City will send out Contract to Contractor for signatures. Date 2 = Date 1 + 2 working days
Step 3. Contractor Task Contractor shall return signed Contract with required bonds and insurances to City. Date 3 = Date 2 + 5 working days
Step 4. City Task City will counter sign the Contract and provide a fully executed Contract to Contractor. Date 4 = Date 3 + 2 working days
Step 5. Joint Task A Pre-construction meeting will be held. Contractor shall submit its project schedule to the City at the Pre-construction meeting, with project start date established based on Date 6 shown in Step 6. Date 5 = Date 4 + 1 working day
Step 6. City Task City will issue to the Contractor NTP (Notice to Proceed) #1 to commence with the Procurement Phase of the project (field measurements, stamped shop drawings, material submittals, engineering, calculations, no-fee plan check/permit submittals, no-fee zoning clearance, coordination, fabrication). Contractor shall complete the Procurement Phase within 40 Working Days. Date 6 = Effective Date for the start of Procurement + specified duration
Step 7. Contractor Task City will issue to the Contractor NTP (Notice to Proceed) #2 to commence with the Construction Phase of the project. Contractor shall complete field construction within 15 Working Days for Bid Schedule scope. Date 7 = Date 6 + specified duration. Note: If Contactor tasks and the work described in this schedule are not completed by the contractor within the required durations, City will assess $1,000 per calendar day as liquidated damages.
All durations above related to Contractor tasks shall remain the same regardless of City's completion of City tasks.

The project shall be completed per the following schedule:
Task No Description Date
Step 1. City Task Contract award by the City Council. Date 1
Step 2. City Task City will send out Contract to Contractor for signatures. Date 2 = Date 1 + 2 working days
Step 3. Contractor
Contractor shall return signed Contract with required bonds and insurances to City. Date 3 = Date 2 + 5 working days
Task
Step 4. City Task City will counter sign the Contract and provide a fully executed Contract to Contractor. Date 4 = Date 3 + 2 working days
A Pre-construction meeting will be held.
Step 5. Joint Task Contractor shall submit its project schedule to the City at the Pre-construction meeting, Date 5 = Date 4 + 1 working day
with project start date established based on Date 6 shown in Step 6.
City will issue to the Contractor NTP (Notice to Proceed) #1 to commence with the
Procurement Phase of the project (field measurements, stamped shop drawings, material
submittals, engineering, calculations, no-fee plan check/permit submittals, no-fee zoning Date 6 = Effective Date for the start of
Step 6. City Task
clearance, coordination, fabrication). Procurement + specified duration
Contractor shall complete the Procurement Phase within 40 Working Days.
Date 7 = Date 6 + specified duration.
City will issue to the Contractor NTP (Notice to Proceed) #2 to commence with the
Note: If Contactor tasks and the work
Construction Phase of the project.
Step 7. Contractor described in this schedule are not
Task completed by the contractor within the
Contractor shall complete field construction within 15 Working Days for Bid Schedule
required durations, City will assess
scope.
$1,000 per calendar day as liquidated
damages.
All durations above related to Contractor tasks shall remain the same regardless of City's completion of City tasks.
The Contractor agrees that failure to complete work within the time allowed will result in damages being
sustained by the City. Contractor and City agree that failure to complete the project will result in
inconvenience to the citizens of the City. The parties also agree that failure to complete the project on
time will prevent the City from having the use of the affected facilities. Therefore, the parties agree such
damages among others are, and will continue to be, impracticable and extremely difficult to determine,
but that One Thousand Dollars ($1,000) a calendar day is the minimum value of such costs to the City and
is a reasonable amount that the Contractor agrees to reimburse the City for each calendar day of delay in
finishing the work in excess of the time specified for completion, plus any authorized time extensions.
Execution of the contract under these specifications shall constitute agreement by the Contractor and the
City that the above indicated liquidated damage amount per calendar day is the minimum value of the costs
and actual damage caused by failure of the Contractor to complete the work within the allotted time, that
such sum is liquidated damages and shall not be construed as a penalty, and that such sum may be deducted
from payments due the Contractor if such delay occurs. Said amount may be reduced by the City if work is
sufficiently completed within the/an allotted time so that the damages are minimized.
All construction graffiti shall be removed prior to the release of retention payment.
WITHDRAWAL OF PROPOSALS
A proposal may be withdrawn by a written request signed by the bidder. Such requests must be delivered to
Page: B.2

the City's designated official prior to the bid opening hour stipulated in the Notice Inviting Bids. Proposals
may not be withdrawn after the bid opening hour stipulated in the Notice Inviting Bids without forfeiture of
the proposal guarantee. The withdrawal of a proposal will not prejudice the right of the bidder to submit a
new proposal, providing there is time to do so.
IRREGULAR PROPOSALS
Unauthorized conditions, limitations, or provisions attached to a proposal will render it irregular and may
cause its rejection. The completed proposal forms shall be without interlineations, alterations, or
erasures. Alternative proposals will not be considered unless specifically requested. No oral, telegraphic,
or telephonic proposal, modification, or withdrawal will be considered.
TAXES
No mention shall be made in the proposal of Sales Tax, Use Tax, or any other tax, as all amounts bid will
be deemed and held to include any such taxes which may be applicable.
DISQUALIFICATION OF BIDDERS
In the event that any bidder acting as a prime contractor has an interest in more than one proposal, all
such proposals will be rejected, and the bidder will be disqualified. This restriction does not apply to
subcontractors or suppliers who may submit quotations to more than one bidder, and while doing so, may
also submit a formal proposal as a prime contractor. No proposal will be accepted from a bidder who has
not been licensed in accordance with the provisions of the State Business and Professions Code.
DISCREPANCIES AND MISUNDERSTANDINGS
Before submitting a Proposal, Bidders must satisfy themselves by personal examination of the work site,
Plans, Specifications, and other contract documents, and by any other means as they may believe
necessary, as to the actual physical conditions, requirements, and difficulties under which the work must
be performed, and shall include in the Proposal, the cost of all items necessary in the construction of the
project. The Bidder shall not be allowed any extra compensation by reason of any matter or thing,
concerning that which such the Bidder might have fully informed himself prior to the bidding. No bidder
shall at any time after submission of a proposal make any claim or assertion that there was any
misunderstanding or lack of information regarding the nature or amount of work necessary for the
satisfactory completion of the job.
Any errors, omissions, or discrepancies found in the Plans, Specifications, or other contract documents
shall be called to the attention of the City. Should a Bidder find any ambiguity, inconsistency or error in
the plans and project manual, or be in doubt as to their meaning, the Bidder shall notify the City, in writing
via e-mail as specified in the Notice of Inviting Bids Section. Issues requiring clarification will be addressed
in a written addendum response, sent by facsimile to each Bidder, person or firm recorded by the City as
having received plans. Any addenda issued by the City during the time of bidding are to be included in
the proposal from the Bidder and shall become a part of the Bid documents. The Bidder shall acknowledge
receipt of addenda on the proposal form in the space provided.
By submitting a bid, the Bidder shall be held to have personally examined the site and the drawings, to
have carefully read the specifications, and to have satisfied itself as to its ability to meet all the difficulties
Page: B.3

attending the execution of the proposed contract before the delivery of this proposal, and agrees that if
awarded the contract, will make no claim against the City based on ignorance or misunderstanding of the
plans, specifications, site conditions and/or contract provisions.
PERMITS AND LICENSES
The Contractor shall procure all permits and licenses, pay all charges and fees, and give all notices
necessary and incidental to the due and lawful prosecution of the work. No fee is charged for the Permit
issued by the City for a public works project. The Contractor shall pay for and obtain a City Business
License.
CONTRACTORS LICENSE LAW
The successful Bidder shall comply with and require all subcontractors to comply with all Federal, State
and City Contractor License Laws and be dully registered and licensed thereunder as required.
The successful Bidder is required to provide and pay for a performance and a payment bond. These bonds
shall cover the faithful performance (100%) of the Contract for Construction and the payment of all
obligations (100%) arising thereunder, in such form as the City may prescribe and with such sureties as
they may approve. The successful Bidder shall require the attorney in fact who executes the required
bonds on behalf of the surety to affix thereto a certified and current copy of his Power of Attorney
indicating the monetary limit of such power.
The City reserves the right to reject any proposed bonding company without stating cause. In this event
the successful Bidder shall provide an alternate bonding company selection acceptable to the City.
Bonds shall conform to state statutes regarding performance bond and labor and material payment bond
with amount shown on each part equal to 100% of the total amount payable by terms of the Contract for
Construction. The surety company shall be licensed to do business in state in which construction project
is located and shall be acceptable to the City. Bond amount shall be increased to include any Change
Order(s) added to the contract to 100% total value amount of each Change Order. Bonds will be recorded
along with a copy of the construction contract in the County Recorder Records by the General Contractor
with written proof submitted to the City.
LIABILITY INSURANCE
The liability insurance coverage values shall be:
1. Public Liability and Property Damage Insurance in an amount of not less than TWO MILLION DOLLARS
($2,000,000);
2. Products/Completed Operations Hazard Insurance in an amount of no less than TWO MILLION
DOLLARS ($2,000,000);
3. Comprehensive Automobile Liability Insurance in an amount not less than TWO MILLION DOLLARS
($2,000,000);
4. Contractual General Liability Insurance in an amount not less than TWO MILLION DOLLARS
($2,000,000);
5. or GENERAL AGGREGATE LIABILITY in an amount of not less than FOUR MILLION DOLLARS
($4,000,000).
Page: B.4

* Automobile and lease vehicle insurance; owned, not owned, and hired. Insurance to include bodily
injury, sickness and death of any person and property damage owned and un-owned per occurrence.
SOCIAL SECURITY ACT
The successful Bidder agrees to comply with and to require all of his subcontractors to comply with all the
provisions of the Act of Congress approved August 14, 1935, known and cited as the Social Security Act
and also the provisions of the act of the State Legislature Approved, and known as the State
Unemployment Compensation Law and all other laws and regulations pertaining to labor and workmen
and all amendments to such data, and the contractor further agrees to indemnify and hold harmless the
City of Temple City of and from any and all claims and demands made against it by virtue of the failure of
the contractor or any subcontractors to comply with the provisions of any or all of said acts and
amendments.
SALES AND USE TAX
The successful Bidder agrees to comply with and to require all of his subcontractors to comply with all the
provisions of applicable state sales excise tax law and compensation use tax law and all amendments to
same. The successful Bidder further agrees to indemnify and hold harmless the City of Temple City of and
from any and all claims and demands made against virtue of the failure of the Contractor or any
Subcontractors to comply with the provisions of any or all said laws and amendments.
WAIVER OF LIENS
The successful Bidder (General Contractor) is responsible for the payment of all bills for labor and
materials furnished by the subcontractors, the suppliers, and the General Contractor on this project. The
General Contractor shall deliver to the City, unconditional Lien Waivers and/or Releases from himself and
from each of his subcontractors and suppliers, and at such time he shall certify that he is submitting such
lien waivers for all subcontractors and suppliers involved.
If any liens are filed against the City property, the City may, at its option, demand General Contractor
immediately provide a bond in accordance with state statutes.
LEGAL RESPONSIBILITIES
All proposals must be submitted, filed and executed in accordance with State and Federal laws relating to
bids for contracts of this nature whether the same or expressly referred to herein or not. Any bidder
submitting a proposal shall by such action thereby agree to each and all of the terms, conditions,
provisions, and requirements set forth, contemplated, and referred to in the Plans, Specifications, and
other contract documents, and to full compliance therewith.
AWARD OF CONTRACT
The award of contract, if made, will be to the lowest responsible bidder as determined solely by the City.
The City of Temple City reserves the right to reject any or all proposals, to waive any irregularity, and to
take the bids under advisement for a period of sixty (60) calendar days, as may be required to provide for
the best interests of the City. In no event will an award be made until all necessary investigations are
made as to the responsibility and qualifications of the bidder to whom the award is contemplated.
Page: B.5

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project: ADMINISTRATION BUILDING CONSTRUCTION PROJECT Ref. #: HD 26-06 Department: HAR Type: RFB... ...

Ventura County

Bid Due: 1/19/2027

...Department Contract # Contract # Buyer Erin Reyes Description On-Call Construction Bid Opening ...

City of Long Beach

Bid Due: 11/25/2026

...Basic Information Title Request for Qualifications - Task Order Construction Agreement - General... ...

State Government of California

Bid Due: 11/24/2026

...RFP for General Contractor - Preconstruction & Construction Services REQUEST FOR PROPOSALS... & ...

City of San Buenaventura

Bid Due: 11/18/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.