Request for Proposal: Building Fire Sprinkler Retrofit

Location: Illinois
Posted: Aug 7, 2026
Due: Aug 12, 2026
Agency: City of Rock Island
Type of Government: State & Local
Category:
  • H - Quality Control, Testing, and Inspection Services
Publication URL: To access bid details, please log in.
Bid Title: Request for Proposal: Building Fire Sprinkler Retrofit
Category: Construction Projects
Status: Open
Description:

The City of Rock Island is soliciting bids for the retrofit of a fire sprinkler system at the SAL Building, located at 1609 4th Street, Rock Island, IL. The objective of this project is to install a functional fire suppression system to support the building’s current use, with a focus on necessary code compliance and safety. This project will be prevailing wage with certified payroll. Please refer to the attachment for the full scope of this project.

Publication Date/Time:
8/7/2026 12:00 am
Closing Date/Time:
8/12/2026 2:00 pm
Contact Person:
Jeff Laxton
Special Requirements:
Walk though date: August 12,2026 at 9a.m. @ 1609 4th Street Rock Island
Related Documents:

Attachment Preview

Request for Proposal (RFP): Building Fire Sprinkler Retrofit
Project Overview
The City of Rock Island is soliciting bids for the retrofit of a fire sprinkler system at the SAL
Building, located at 1609 4th Street, Rock Island, IL. The objective of this project is to install a
functional fire suppression system to support the building’s current use, with a focus on
necessary code compliance and safety. This project will be prevailing wage with certified
payroll.
Project Name: Sprinkler
Location: 1609 4th street
Walk through: August 12, 2026 at 9 a.m. @ 1609 4th Street Rock Island
Bid due Date: August 19, 2026 by 2 p.m. City Hall 1528 Third Avenue Rock Island, IL. Second
floor.
Scope of Work
The successful bidder will be responsible for the design, permitting, and installation of a wet
pipe sprinkler system. The scope includes, but is not limited to:
System Design: Installation of a Two (2) Zone Wet Pipe Sprinkler System per NFPA-13
guidelines and local city code.
Water Supply: Installation/replacement of the backflow preventer with a new RPZ as required by
the local water authority.
System Infrastructure
Provision of a new 4-inch fire sprinkler riser through the stairwell, feeding the 1st and 2nd floors.
Separate zone control for each floor.
Installation of a light hazard "shell" type system throughout.
Water Supply Data
Hydraulic calculations are based on the following flow test data (07-17-26):
Static Pressure: 65 PSI, Residual Pressure: 25 PSI, Flow: 615 GPM
Requirements & Stipulations
Expediency: This project is time-sensitive. Please provide a clear timeline for completion.
Cost Efficiency: The City of Rock Island is looking for a "barebones" approachonly what is
necessary to meet code requirements, as a full building rehabilitation is anticipated for 2027.
Exclusions: All electrical work (alarms and lighting), removal of combustibles above ceilings,
and patching/finishing of non-sprinkler related surfaces are the responsibility of the successful
bidder as specified in the full contract requirements.
Compliance: All work must meet the minimum requirements of NFPA-13 and local ordinances.
Stamped drawings (NICET LVL III/IV minimum) are required.
Evaluation Criteria
Proposals will be evaluated based on the following metrics:
Total cost and value.
Proposed timeline and minimal disruption to the facility.
Completeness of the submission.
Bid Submission
Please submit your lump-sum proposal, including a detailed breakdown of costs and a project
timeline, to the attention of Jeff Laxton, Construction Officer, City of Rock Island. Sealed bids
must be received on or before August 19, 2026 by 2p.m. 1528 Third Avenue Rock Island, IL.
Second floor.
They shall be addressed and marked as follows.
Contact Information
The primary contact person for this project is the City’s Construction Officer.
Jeff Laxton, CED Department, 1528 3rd Avenue, Rock Island, IL 61201, 309.732.2906,
laxton.jeff@rigov.org.
ɑ ‡‡”ƒŽ‡…‹•‹‘—„‡”ś ɩɥɩɭɥɥɨɩɥɮŵɪɥŵɩɥɩɭ
–ƒ–‡ś ŽŽ‹‘‹•
‘•–”—…–‹‘›’‡•ś ‡ƒ˜›ƒ† ‹‰Š™ƒ›
‘—–‹‡•ś ŽŽ‹‘‹•‘—–‹‡•‘ˆ
—”‡ƒ—řƒ””‘ŽŽř ‡”›ř ‘ƒ˜‹‡••ř‡‡ř
‰Ž‡ř‘… •Žƒ†ř–‡’Ї•‘řŠ‹–‡•‹†‡
ƒ†‹‡„ƒ‰‘
‡ƒ˜›‘•–”—…–‹‘
‹‰Š™ƒ›‘•–”—…–‹‘
‘†‹ˆ‹…ƒ–‹‘—„‡”—„Ž‹…ƒ–‹‘ƒ–‡
ɥɥɨŵɥɩŵɩɥɩɭ
ɨɥɬŵɨɯŵɩɥɩɭ
ɩɥɮŵɪɥŵɩɥɩɭ
ɥɥɥɫŞɥɨɥɥɬŵɥɨŵɩɥɩɬ
ƒ–‡• ”‹‰‡•
ſ   ƀŜŜŜŜŜŜŜŜŜŜɛɪɯŜɥɥɪɬŜɨɭ
ŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞ
ɥɨɮɫŞɥɥɩɥɬŵɥɨŵɩɥɩɬ
ƒ–‡• ”‹‰‡•
ſƀŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜɛɫɥŜɩɯɪɯŜɰɬ
ŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞ
ɥɮɰɥŞɥɥɫɥɬŵɥɨŵɩɥɩɬ
ƒ–‡• ”‹‰‡•
ſř  řř ſ 
   ƀř ř  
 ƀŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜɛɫɯŜɭɥɪɯŜɬɪ
ŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞ
ɥɮɰɩŞɥɥɩɥɬŵɥɨŵɩɥɩɬ
ƒ–‡• ”‹‰‡•
ſ ſ Ş  ƀř  
 ƀŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜɛɬɨŜɥɥɪɭŜɨɪ
ŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞ
ɥɥɬɨŞɥɥɬɥɨŵɥɨŵɩɥɩɫ
ƒ–‡• ”‹‰‡•
  ś ŵ 
ſ   Şɫřɨɬ
 ƀſĺ ſřř
  ř řřř 
ƀƀŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜɛɬɩŜɭɪɩɫŜɪɬ
  ś ŵ ſĺ
ſřř  ř řř
ř ƀƀŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜɛɪɰŜɰɩɩɥŜɩɩ
  ś  
   ſĺ ſřř
  ř řřř 
ƀƀŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜɛɬɯŜɬɯɩɭŜɩɰ
ŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞ
ɥɨɫɬŞɥɥɪɨɩŵɥɫŵɩɥɩɪ
ƒ–‡• ”‹‰‡•
  ř ſ
ſ     ř řř
řř  ř像’Śƀř
 ſ    ř ř
  ř ř  ř   ř
ř ř ř řř
   像’Ś ƀř ſ
řř  ř řřř
 ƀ 像’Ś  
ſ  řř ř ř ř
 řŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜɛɬɪŜɨɩɩɫŜɬɪ
  ř ſſ  
  ř řřřř
  ř像’Śƀř  
ſ    ř ř  ř
ř  ř   ř ř ř
 ř řř   像’Ś
 ƀř ſřř
  ř řřř 
ƀ 像’Ś  ſ  
řř ř ř ř  ř
řŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜɛɫɪŜɰɩɩɨŜɫɰ
  ř ſſ  
  ř řřřř
  ř像’Śƀř  
ſ    ř ř  ř
ř  ř   ř ř ř
 ř řř   像’Ś
 ƀř ſřř
  ř řřř 
ƀ 像’Ś  ſ  
řř ř ř ř  ř
řŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜɛɪɫŜɭɫɨɯŜɫɪ
  ř  
ſſ     ř ř
řřř  ř像’Ś
ƀř  ſ    ř
 ř  ř ř  ř
  ř ř ř ř ř
ř   像’Ś ƀř 
ſřř  ř řř
ř ƀ 像’Ś
  ſ  řř ř
ř ř ŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜɛɫɨŜɭɨɩɥŜɮɪ
  ř  ſ
ſ     ř řř
řř  ř像’Śƀř
 ſ    ř ř
  ř ř  ř   ř
ř ř ř řř
   像’Ś ƀř ſ
řř  ř řřř
 ƀ 像’Ś  
ſ  řř ř ř ř
ŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜɛɪɭŜɨɬɨɯŜɰɪ
  ř ř   ř 
 ſſ    
ř řřřř
  ř像’Śƀř  
ſ    ř ř  ř
ř  ř   ř ř ř
 ř řř   像’Ś
 ƀř ſřř
  ř řřř 
ƀ 像’Ś  ſ  
řř ř ŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜɛɬɩŜɭɮɩɫŜɪɯ
ŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞŞ
ɥɨɫɬŞɥɥɬɥɭŵɥɩŵɩɥɩɬ
ƒ–‡• ”‹‰‡•
 ſſ  řŜř
 ƀř ſ  
řř  ř řřř
 ƀř  ſ
ƀř  ſ  ƀř
 ƀŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜŜɛɫɮŜɥɥɩɯŜɭɫ
  ſſ  řŜř
 ƀř ſ  
řř  ř řřř
 ƀř  ſ
ƀř  ſ  ƀř
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow Construction Inspection Services Active Contract Opportunity Notice ID 86614126R00002... contractor support to ...

HOUSING AND URBAN DEVELOPMENT, DEPARTMENT OF

Bid Due: 10/14/2026

...Bid Title: Oak Street Sidewalk Construction Category: Bids Status: Open Description: Notice...

Troy city

Bid Due: 10/08/2026

...Status Ref# Project Close Date Dayes Left Action Open P-22015 P-22015 Rapid Response ...

Chicago Park District

Bid Due: 12/31/2026

...Status Ref# Project Close Date Dayes Left Action Open P-22015 P-22015 Rapid Response ...

Chicago Park District

Bid Due: 12/31/2027

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.