DN01120 (WBS 49463.3.1) BN-0011 GRADING, PAVING, FENCING, DRAINAGE, AND CULVERTS ON NEW BIKE PATH AT TANNERY STATE PARK FROM CASHIERS VALLEY RD TO SILVERSTEEN DR IN TRANSYLVANIA COUNTY Addendum 1

Location: North Carolina
Posted: Jun 18, 2026
Due: Jun 23, 2026
Agency: Division of Highways
Type of Government: State & Local
Category:
  • 56 - Construction and Building Materials
Publication URL: To access bid details, please log in.
  • DN01120 (WBS 49463.3.1)
    POC
    DN01120 (WBS 49463.3.1) BN-0011 GRADING, PAVING, FENCING, DRAINAGE, AND CULVERTS ON NEW BIKE PATH AT TANNERY STATE PARK FROM CASHIERS VALLEY RD TO SILVERSTEEN DR IN TRANSYLVANIA COUNTY
  • Attachment Preview

    This electronic collection of documents is provided
    for the convenience of the user
    and is Not a Cer tified Document -
    The documents contained herein were originally issued
    and sealed by the individuals whose names and license
    numbers appear on each page, on the dates appearing
    with their signature on that page.
    This file or an individual page
    shall not be considered a cer tified document.

    BEGIN
    ESTATOE TRAIL PHASE III
    (TANNERY PROPERTY)
    END
    DOCUMENT NOT CONSIDERED FINAL
    UNLESS ALL SIGNATURES COMPLETED

    DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INDEX OF SHEETS GENERAL NOTES STANDARD DRAWINGS Sheet No. Sheet Title A. (cid:20) (cid:38)O(cid:57)ER SHEET 1. PRIOR TO BEGINNING WORK, THE CONTRACTOR SHALL EXAMINE AND CAREFULLY STUDY ALL CONTRACT DOCUMENTS, DATA AND REFERENCE ITEMS IDENTIFIED. IN SO DOING, THE CONTRACTOR (cid:20)A INDEX OF SHEETS ACKNOWLEDGES THAT HE HAS SATISFIED HIMSELF AS TO THE CONDITIONS TO BE ENCOUNTERED REGARDING THE CHARACTER, QUALITY, AND QUANTITIES OF WORK TO BE PERFORMED, MATERIALS (cid:21) GENERAL LEGEND AND A(cid:37)(cid:37)RE(cid:57)IATIONS TO BE FURNISHED AND WITH ALL OTHER REQUIREMENTS AS SET FORTH IN THE CONTRACT DOCUMENTS. (cid:22) O(cid:57)ERALL SITE (cid:51)LAN 2. THE CONTRACTOR SHALL PRIOR TO THE BEGINNING OF WORK GIVE THE ENGINEER WRITTEN NOTICE OF ANY CONFLICTS, ERRORS, AMBIGUITIES, OR DISCREPANCIES DISCOVERED IN THE CONTRACT (cid:23)(cid:16)(cid:27) (cid:51)EDESTRIAN GREENWA(cid:60) (cid:51)LAN AND (cid:51)ROFILE DOCUMENTS AND SHALL CONFIRM THAT WRITTEN RESOLUTION OF SUCH HAS BEEN RECEIVED FROM THE ENGINEER AND THAT SUCH RESOLUTION IS ACCEPTABLE TO THE CONTRACTOR. (cid:28) T(cid:60)(cid:51)I(cid:38)AL (cid:38)ROSS(cid:16)SE(cid:38)TIONS AND ASSO(cid:38)IATED STATIONS 3. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING CONSTRUCTION STAKING FOR ALL (cid:20)(cid:19)(cid:16)(cid:20)(cid:23) (cid:51)EDESTRIAN GREENWA(cid:60) (cid:38)ROSS(cid:16)SE(cid:38)TIONS IMPROVEMENTS. THE LOCATIONS OF IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS. (cid:20)(cid:24)(cid:16)(cid:20)(cid:25) LANDS(cid:38)A(cid:51)E (cid:51)LAN 4. THE CONTRACTOR SHALL REMOVE FROM THE SITE AND PROPERLY DISPOSE OF ALL MATERIALS AND (cid:20)(cid:21)(cid:16)(cid:20)(cid:25) (cid:51)EDESTRIAN GREENWA(cid:60) (cid:38)ROSS(cid:16)SE(cid:38)TIONS DEBRIS RESULTING FROM CONSTRUCTION OPERATIONS, INCLUDING BUT NOT LIMITED TO RESIDUAL AND DEMOLITION MATERIALS WITH THE EXCEPTION OF SOIL LOCATED ON THE TANNERY PROPERTY. (cid:20)(cid:26) NON(cid:16)STANDARD N(cid:38)DOT (cid:9) (cid:48)IS(cid:38)ELLANEO(cid:56)S DETAILS THE COST OF SUCH SHALL BE INCLUDED IN THE BASE CONTRACT AMOUNT. 5. MATERIAL TO BE REMOVED FROM THE SITE SHALL BE ISOLATED AND TESTED FOR HAZARDOUS (cid:20)(cid:27) SOIL S(cid:56)R(cid:57)E(cid:60) (cid:51)LAT AND TA(cid:37)LES SUBSTANCES PRIOR TO HAULING. IF CONTAMINANT IS IDENTIFIED, THE OWNER AND ENGINEER SHALL BE NOTIFIED AND THE MATERIAL SHALL BE HANDLED AND DISPOSED OF PER EPA REQUIREMENTS. E(cid:38)(cid:20)(cid:16)E(cid:38)(cid:21) EROSION (cid:9) SEDI(cid:48)ENTATION (cid:38)ONTROL NOTES (cid:9) DETAILS THE COST FOR THIS TESTING SHALL BE PAID FOR AS SPECIFIED IN THE "TESTING OF IMPACTED OR POTENTIALLY IMPACTED SOIL" SPECIAL PROVISION. 6. MATERIAL TO BE REMOVED FROM THE SITE SHALL BE ISOLATED AND TESTED FOR HAZARDOUS SUBSTANCES PRIOR TO HAULING. IF CONTAMINANT IS IDENTIFIED, THE OWNER AND ENGINEER SHALL BE NOTIFIED AND MATERIAL SHALL BE HANDLED AND DISPOSED OF PER EPA REQUIREMENTS. 7. ALL CONCRETE WITH THE EXCEPTION OF REINFORCED CONCRETE SHALL BE 4,000psi, UNLESS OTHERWISE NOTED. ALL CONCRETE SIDEWALKS AND DRIVEWAY APRONS SHALL USE HIGH EARLY STRENGTH CONCRETE. B. 1. CONTRACTOR SHALL SHOW PROOF OF 40-HOUR OSHA CERTIFICATION PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR SHALL IDENTIFY BORROW SITE, PERFORM TESTING FOR HAZARDOUS MATERIALS, AND SUBMIT TO NCDEQ BROWNFIELD'S PROGRAM FOR APPROVAL. 1 SAMPLE PER 500 CUBIC YARDS OF MATERIAL (VOC'S, SVOC'S, RCRA MATERIALS) 3. INSTALL APPLICABLE EROSION CONTROL MEASURES AS SHOWN ON THE DRAWINGS (I.E. MUD MATS, DAMS, BY PASS PUMPS, ETC.). 4. COMMENCE SOIL BORING/TESTING FOR VOC'S, SVOC'S, AND RCRA MATERIALS TO IDENTIFY THE LIMITS OF HAZARDOUS MATERIAL. 5. COMMENCE GRADING ACTIVITIES. 6. INSTALL STORMWATER MANAGEMENT DEVICES. 7. ESTABLISH FINAL GRADES. 8. INSTALL AND MAINTAIN EROSION CONTROL DEVICES (I.E. SILT FENCE, CULVERT PROTECTION, ETC.). 9. INSTALL PEDESTRIAN PATH AS SHOWN ON THE PLANS. 10. INSTALL LANDSCAPING AND PERMANENT GRASSING. 11. REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER PERMANENT COVER HAS BEEN ESTABLISHED. C. 1. THE TANNERY PROPERTY IS A DESIGNATED BROWNFIELD. CONTRACTOR SHALL FOLLOW ALL APPLICABLE OSHA REQUIREMENTS. 2. ALL EXCAVATED SOIL SHALL BE STOCKPILED, SIFTED, AND TESTED FOR CONTAMINANTS. 3. STOCKPILED SOILS SHALL BE COVERED AT ALL TIMES TO PREVENT SPREADING. 4. CONTAMINATED SOILS SHALL BE REDEPOSITED ON-SITE AND CAPPED WITH 24" OF CLEAN SOIL. 5. NO SOIL MAY BE BROUGHT ONTO OR LEAVE THE PROPERTY WITHOUT THE APPROVAL OF THE BROWNFIELDS PROGRAM. NT NOT CONSIDERED FINAL LL SIGNATURES COMPLETED

    DOCUMENT NOT CONSIDERED FINAL
    UNLESS ALL SIGNATURES COMPLETED
    INDEX OF SHEETS GENERAL NOTES STANDARD DRAWINGS
    Sheet No. Sheet Title A.
    (cid:20) (cid:38)O(cid:57)ER SHEET 1. PRIOR TO BEGINNING WORK, THE CONTRACTOR SHALL EXAMINE AND CAREFULLY STUDY ALL
    CONTRACT DOCUMENTS, DATA AND REFERENCE ITEMS IDENTIFIED. IN SO DOING, THE CONTRACTOR
    (cid:20)A INDEX OF SHEETS ACKNOWLEDGES THAT HE HAS SATISFIED HIMSELF AS TO THE CONDITIONS TO BE ENCOUNTERED
    REGARDING THE CHARACTER, QUALITY, AND QUANTITIES OF WORK TO BE PERFORMED, MATERIALS
    (cid:21) GENERAL LEGEND AND A(cid:37)(cid:37)RE(cid:57)IATIONS TO BE FURNISHED AND WITH ALL OTHER REQUIREMENTS AS SET FORTH IN THE CONTRACT
    DOCUMENTS.
    (cid:22) O(cid:57)ERALL SITE (cid:51)LAN
    2. THE CONTRACTOR SHALL PRIOR TO THE BEGINNING OF WORK GIVE THE ENGINEER WRITTEN NOTICE
    OF ANY CONFLICTS, ERRORS, AMBIGUITIES, OR DISCREPANCIES DISCOVERED IN THE CONTRACT
    (cid:23)(cid:16)(cid:27) (cid:51)EDESTRIAN GREENWA(cid:60) (cid:51)LAN AND (cid:51)ROFILE
    DOCUMENTS AND SHALL CONFIRM THAT WRITTEN RESOLUTION OF SUCH HAS BEEN RECEIVED FROM
    THE ENGINEER AND THAT SUCH RESOLUTION IS ACCEPTABLE TO THE CONTRACTOR.
    (cid:28) T(cid:60)(cid:51)I(cid:38)AL (cid:38)ROSS(cid:16)SE(cid:38)TIONS AND ASSO(cid:38)IATED STATIONS
    3. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING CONSTRUCTION STAKING FOR ALL
    (cid:20)(cid:19)(cid:16)(cid:20)(cid:23) (cid:51)EDESTRIAN GREENWA(cid:60) (cid:38)ROSS(cid:16)SE(cid:38)TIONS
    IMPROVEMENTS. THE LOCATIONS OF IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE
    CONTRACT PLANS AND SPECIFICATIONS.
    (cid:20)(cid:24)(cid:16)(cid:20)(cid:25) LANDS(cid:38)A(cid:51)E (cid:51)LAN
    4. THE CONTRACTOR SHALL REMOVE FROM THE SITE AND PROPERLY DISPOSE OF ALL MATERIALS AND
    (cid:20)(cid:21)(cid:16)(cid:20)(cid:25) (cid:51)EDESTRIAN GREENWA(cid:60) (cid:38)ROSS(cid:16)SE(cid:38)TIONS DEBRIS RESULTING FROM CONSTRUCTION OPERATIONS, INCLUDING BUT NOT LIMITED TO RESIDUAL
    AND DEMOLITION MATERIALS WITH THE EXCEPTION OF SOIL LOCATED ON THE TANNERY PROPERTY.
    (cid:20)(cid:26) NON(cid:16)STANDARD N(cid:38)DOT (cid:9) (cid:48)IS(cid:38)ELLANEO(cid:56)S DETAILS THE COST OF SUCH SHALL BE INCLUDED IN THE BASE CONTRACT AMOUNT.
    5. MATERIAL TO BE REMOVED FROM THE SITE SHALL BE ISOLATED AND TESTED FOR HAZARDOUS
    (cid:20)(cid:27) SOIL S(cid:56)R(cid:57)E(cid:60) (cid:51)LAT AND TA(cid:37)LES
    SUBSTANCES PRIOR TO HAULING. IF CONTAMINANT IS IDENTIFIED, THE OWNER AND ENGINEER SHALL
    BE NOTIFIED AND THE MATERIAL SHALL BE HANDLED AND DISPOSED OF PER EPA REQUIREMENTS.
    E(cid:38)(cid:20)(cid:16)E(cid:38)(cid:21) EROSION (cid:9) SEDI(cid:48)ENTATION (cid:38)ONTROL NOTES (cid:9) DETAILS
    THE COST FOR THIS TESTING SHALL BE PAID FOR AS SPECIFIED IN THE "TESTING OF IMPACTED OR
    POTENTIALLY IMPACTED SOIL" SPECIAL PROVISION.
    6. MATERIAL TO BE REMOVED FROM THE SITE SHALL BE ISOLATED AND TESTED FOR HAZARDOUS
    SUBSTANCES PRIOR TO HAULING. IF CONTAMINANT IS IDENTIFIED, THE OWNER AND ENGINEER SHALL
    BE NOTIFIED AND MATERIAL SHALL BE HANDLED AND DISPOSED OF PER EPA REQUIREMENTS.
    7. ALL CONCRETE WITH THE EXCEPTION OF REINFORCED CONCRETE SHALL BE 4,000psi, UNLESS
    OTHERWISE NOTED. ALL CONCRETE SIDEWALKS AND DRIVEWAY APRONS SHALL USE HIGH EARLY
    STRENGTH CONCRETE.
    B.
    1. CONTRACTOR SHALL SHOW PROOF OF 40-HOUR OSHA CERTIFICATION PRIOR TO BEGINNING
    CONSTRUCTION.
    2. CONTRACTOR SHALL IDENTIFY BORROW SITE, PERFORM TESTING FOR HAZARDOUS MATERIALS, AND
    SUBMIT TO NCDEQ BROWNFIELD'S PROGRAM FOR APPROVAL. 1 SAMPLE PER 500 CUBIC YARDS OF
    MATERIAL (VOC'S, SVOC'S, RCRA MATERIALS)
    3. INSTALL APPLICABLE EROSION CONTROL MEASURES AS SHOWN ON THE DRAWINGS (I.E. MUD MATS,
    DAMS, BY PASS PUMPS, ETC.).
    4. COMMENCE SOIL BORING/TESTING FOR VOC'S, SVOC'S, AND RCRA MATERIALS TO IDENTIFY THE LIMITS
    OF HAZARDOUS MATERIAL.
    5. COMMENCE GRADING ACTIVITIES.
    6. INSTALL STORMWATER MANAGEMENT DEVICES.
    7. ESTABLISH FINAL GRADES.
    8. INSTALL AND MAINTAIN EROSION CONTROL DEVICES (I.E. SILT FENCE, CULVERT PROTECTION, ETC.).
    9. INSTALL PEDESTRIAN PATH AS SHOWN ON THE PLANS.
    10. INSTALL LANDSCAPING AND PERMANENT GRASSING.
    11. REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER PERMANENT COVER HAS BEEN
    ESTABLISHED.
    C.
    1. THE TANNERY PROPERTY IS A DESIGNATED BROWNFIELD. CONTRACTOR SHALL FOLLOW ALL APPLICABLE
    OSHA REQUIREMENTS.
    2. ALL EXCAVATED SOIL SHALL BE STOCKPILED, SIFTED, AND TESTED FOR CONTAMINANTS.
    3. STOCKPILED SOILS SHALL BE COVERED AT ALL TIMES TO PREVENT SPREADING.
    4. CONTAMINATED SOILS SHALL BE REDEPOSITED ON-SITE AND CAPPED WITH 24" OF CLEAN SOIL.
    5. NO SOIL MAY BE BROUGHT ONTO OR LEAVE THE PROPERTY WITHOUT THE APPROVAL OF THE
    BROWNFIELDS PROGRAM.

    GENERAL LEGEND ABBREVIATIONS Item Description Existing Legend Proposed Legend Description Abbreviation UTILITIES PLAN LEGEND - SEDIMENT & EROSION CONTROL Item Description Symbol DEMOLITION TASKS below. Know what's Call before you dig. R N.C. One-Call Center Dial 811 or 1-800-632-4949
    GENERAL LEGEND Item Description Existing Legend Proposed Legend
    UTILITIES
    DEMOLITION TASKS
    ABBREVIATIONS Description Abbreviation

    GENERAL LEGEND ABBREVIATIONS
    Item Description Existing Legend Proposed Legend Description Abbreviation
    UTILITIES
    PLAN LEGEND - SEDIMENT & EROSION CONTROL
    Item Description Symbol
    DEMOLITION TASKS
    below.
    Know what's
    Call
    before you dig.
    R
    N.C. One-Call Center
    Dial 811 or 1-800-632-4949

    OVERALL SITE PLAN SCALE: 1" = 100'-0"

    OVERALL SITE PLAN
    SCALE: 1" = 100'-0"
    -

    PEDESTRIAN PATH PLAN STA: 0+00 - 5+00 SCALE: 1" = 20'-0" PEDESTRIAN PATH PROFILE STA: 0+00 - 5+00 HORIZONTAL SCALE: 1" = 20'-0" VERTICAL SCALE: 1" = 10'-0"
    PEDESTRIAN PATH PROFILE
    STA: 0+00 - 5+00
    HORIZONTAL SCALE: 1" = 20'-0"
    VERTICAL SCALE: 1" = 10'-0"

    PEDESTRIAN PATH PLAN
    STA: 0+00 - 5+00
    SCALE: 1" = 20'-0"
    PEDESTRIAN PATH PROFILE
    STA: 0+00 - 5+00
    HORIZONTAL SCALE: 1" = 20'-0"
    VERTICAL SCALE: 1" = 10'-0"

    PEDESTRIAN PATH PLAN STA: 5+00 - 9+50 SCALE: 1" = 20'-0" PEDESTRIAN PATH PROFILE STA: 5+00 - 9+50 HORIZONTAL SCALE: 1" = 20'-0" VERTICAL SCALE: 1" = 10'-0"

    PEDESTRIAN PATH PLAN
    STA: 5+00 - 9+50
    SCALE: 1" = 20'-0"
    PEDESTRIAN PATH PROFILE
    STA: 5+00 - 9+50
    HORIZONTAL SCALE: 1" = 20'-0"
    VERTICAL SCALE: 1" = 10'-0"

    PEDESTRIAN PATH PLAN STA: 9+50 - 14+00 SCALE: 1" = 20'-0" PEDESTRIAN PATH PROFILE STA: 9+50 - 14+00 HORIZONTAL SCALE: 1" = 20'-0" VERTICAL SCALE: 1" = 10'-0"

    PEDESTRIAN PATH PLAN
    STA: 9+50 - 14+00
    SCALE: 1" = 20'-0"
    PEDESTRIAN PATH PROFILE
    STA: 9+50 - 14+00
    HORIZONTAL SCALE: 1" = 20'-0"
    VERTICAL SCALE: 1" = 10'-0"

    PEDESTRIAN PATH PLAN STA: 14+00 - 19+00 SCALE: 1" = 20'-0" PEDESTRIAN PATH PROFILE STA: 14+00 - 19+00 HORIZONTAL SCALE: 1" = 20'-0" VERTICAL SCALE: 1" = 10'-0"

    PEDESTRIAN PATH PLAN
    STA: 14+00 - 19+00
    SCALE: 1" = 20'-0"
    PEDESTRIAN PATH PROFILE
    STA: 14+00 - 19+00
    HORIZONTAL SCALE: 1" = 20'-0"
    VERTICAL SCALE: 1" = 10'-0"

    PEDESTRIAN PATH PLAN STA: 19+00 - END OF NCDOT CONTRACT SCALE: 1" = 20'-0" PEDESTRIAN PATH PROFILE STA: 19+00 - END OF NCDOT CONTRACT HORIZONTAL SCALE: 1" = 20'-0" VERTICAL SCALE: 1" = 10'-0"

    PEDESTRIAN PATH PLAN
    STA: 19+00 - END OF NCDOT CONTRACT
    SCALE: 1" = 20'-0"
    PEDESTRIAN PATH PROFILE
    STA: 19+00 - END OF NCDOT CONTRACT
    HORIZONTAL SCALE: 1" = 20'-0"
    VERTICAL SCALE: 1" = 10'-0"

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Bid Title: EAST WILLIAMS LOWER Substation Structural & Electric Materials Category: Utility Construction

    Town of Apex

    Bid Due: 8/21/2026

    D6D1.SBE.008 SBE Light Duty Maintenance Crew - Various Routes - Robeson D6D1.SBE.008 -

    Division of Highways

    Bid Due: 8/05/2026

    July 24, 2026 | Advertisements Advertisement for Bids - Avent Ferry Technology Center

    North Carolina State University

    Bid Due: 8/18/2026

    Follow Appalachian Ranger District Office and Work Center Janitorial Services Active Contract Opportunity

    AGRICULTURE, DEPARTMENT OF

    Bid Due: 8/20/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.