ODRC-SCI- 5 -year Structural Fire Escape Inspection- J. Spergin

Location: Ohio
Posted: Sep 28, 2026
Due: Oct 14, 2026
Agency: State Government of Ohio
Type of Government: State & Local
Category:
  • 42 - Fire Fighting, Rescue, and Safety Equipment
  • H - Quality Control, Testing, and Inspection Services
Solicitation No: SRC0000041982
Publication URL: To access bid details, please log in.
Solicitation ID: SRC0000041982
Solicitation Name: ODRC-SCI- 5 -year Structural Fire Escape Inspection- J. Spergin
Original Begin Date: 9/28/2026 12:00:00 PM
Begin Date: 9/28/2026 12:00:00 PM
End Date: 10/14/2026 2:00:00 PM
Inquiry End Date: 10/9/2026 4:00:00 PM
Commodity: Structural engineering
MBE Set Aside: MBE Set Aside
Agency: DRC231500 SOUTHEASTERN CORRECTIONAL INST SECI
Solicitation Status: Open for Bidding
Solicitation Type: Quick Quote

Solicitation General Information
In an MBE set-aside solicitation, only those bidders/suppliers with an active MBE certification at the time the solicitation closes can submit a response
Solicitation ID
SRC0000041982
Solicitation Name
ODRC-SCI- 5 -year Structural Fire Escape Inspection- J. Spergin
RFx Type
Quick Quote
Lot #
1
Solicitation Status
Open for Bidding
Round #
1
MBE Set Aside
Begin Date
9/28/2026 12:00:00 PM (ET)
Amendment?
End Date
10/14/2026 2:00:00 PM (ET)
Inquiry End Date
10/9/2026 4:00:00 PM
Summary

ODRC is seeking proposals to identify a vendor to provide the items listed below in the quantities identified in Ohio Buys to Scope of Work (SOW) / Specifications Package
OhioBuys Solicitation Type: Quick Quote / RFQ Agency: Department of Rehabilitation and Correction
(ODRC)
Facility: Southeastern Correctional Institution (SCI) Location: 5900 BIS Rd SW, Lancaster, OH 43130
Regulatory Mandate: Ohio Fire Code 1104.16.5.1 Inspection Interval: Required 5-Year Certified
Inspection
1. PURPOSE & OBJECTIVE
The State of Ohio, Department of Rehabilitation and Correction (ODRC), on behalf of the Southeastern
Correctional Institution (SCI), is soliciting competitive electronic quotes through OhioBuys for professional
Structural Engineering services. The contractor shall provide all engineering expertise, labor, materials,
equipment, and testing tools required to execute a complete structural safety inspection and code certification
for six ( 6 ) specific exterior emergency egress structures.
This inspection is strictly required to satisfy and clear active State Fire Marshal structural violation
documentation issued under Ohio Fire Code (OFC) Section 1104.16. At the following

Location: Southeastern Correctional Institution Project Objective: Code Certification of Emergency Egress Systems to Remedy State Fire Marshal Violation 1104.16.5.1 1. OBJECTIVE & REGULATORY COMPLIANCE The Consultant shall perform a professional engineering inspection, structural evaluation, and physical live load testing to certify life-safety egress systems. All work must strictly comply with Ohio Fire Code (OHFC) Section 1104.16.5.1, verifying that all stairways, balconies, ladders, cantilevers, and structural anchorages safely support a minimum uniform live load of 100 lbs/sq. ft. 2. SCOPE OF SERVICES Phase 1: Field Investigation & Pre-Test Visual Inspection • Cantilever Systems (2 Units): Inspect the pivot points, counterweights, cables, pulleys, release mechanisms, and structural framing elements of the two (2) designated 2-story cantilever fire exits to ensure complete operational balance and safe deployment. • Metal Fire Escapes (4 Units): Inspect all treads, risers, stringers, handrails, guardrails, platforms, grating, and connection brackets across all four (4) 2-story metal fire escapes. • Corrosion & Section Loss Evaluation: Quantify and document areas of localized rust, pitting, scaling, and material section loss on all structural steel components to ensure safe load testing execution. • Anchorage Analysis: Examine all structural connections to the building's main frame, including through-bolts, expansion anchors, embedded plates, and structural welds. Phase 2: Mandatory Structural Load Testing • Test Plan Design: The engineer shall develop a controlled structural load-testing protocol detailing exact weight placement, structural loading steps, safety boundaries, and deflection criteria. • Testing Execution: The engineer shall supply, coordinate, and witness the placement of certified test weights (such as water bladders or calibrated blocks) to confirm the mandated code capacity of 100 lbs/sq. ft. • Cantilever Function Testing: Perform operational drop-tests on the two cantilever systems to confirm unhindered functional movement and reliable gravity deployment under emergency situations. Phase 3: Reporting & Certification • Condition & Deflection Assessment: Detailed logs, descriptive field notes, and complete photographic logs of each of the six (6) structures under static and loaded environments. • Deficiency Log: A prioritized list of material defects, physical failures, or code compliance gaps identified during inspection and testing. • Repair Specifications: Specific engineering guidance and repair criteria for any necessary structural remediation (e.g., weld procedures, anchor retrofits, paint/coating specifications). • Compliance Certification: A signed and sealed professional engineering statement confirming that the structures comply with the 5-year fire escape safety requirements. 3. DELIVERABLES • Draft Inspection & Testing Report: Submitted electronically for facility administrative review within 14 business days of completing field investigations. • Final Certified Report: Three (3) hard copies and one (1) high-resolution digital PDF file containing the final report, officially stamped and signed by a Professional Engineer (PE) registered in the State of Ohio. 4. SPECIAL CONSIDERATIONS & SECURITY • Correctional Facility Environment: The Consultant must comply with all institution security protocols, background screening checks, gate clearance protocols, tool logging rules, and secure escort requirements. • Access & Test Equipment: The Consultant is solely responsible for providing all necessary ladders, scaffolding, aerial lifts, rigging gear, certified weights, and testing hardware required to perform the scope safely. 5. OHIO BUYS PLATFORM & INVOICE ROUTING Contract procurement, initial award bidding, and formal Purchase Order (PO) generation are processed entirely through the Ohio Buys eProcurement platform. Invoicing can be completed outside of the Ohio Buys platform. All project invoices must be submitted directly to the institution's procurement officer or authorized employee for verification and processing. 6. FINANCIAL & INVOICING TERMS • Pricing Model: This contract is structured as a Fixed-Price Statement of Work. The agreed-upon total fee encompasses all field equipment, travel, background screening compliance, and engineering reporting fees. • Invoicing Schedule: Invoices may be submitted to the institution's procurement agent upon successful receipt, review, and final acceptance of Deliverable 3 (Final Sealed Certification) . Site Visits are encouraged during the bidding cycle. Contact: Jamie Spergin at jamie.m.spergin@drc.ohio.gov or 740-994-0780.

Predecessor Contract
Process


Those wanting to bid will follow the instruction
provided in the document and submit all the
required documentation via Ohio Buys. All bids and
inquiries must come through the Ohio Buys Portal.
The solicitation adheres to the dates provided within
Ohio Buys, shall any changes in dates be necessary
such information will be posted in Ohio Buys. If there
is a need for technical support during proposal
submission contact 1-877-644-6771 or 1-614-466-
5090. This number is for technical support questions
only. No questions regarding this specific solicitation
can be answered by those reached at these listed
numbers. For solicitation- specific questions, utilize
communications methods provided in Ohio Buys.

Vendor recommended to sight visit prior to placing
a proposal.

Ship To
P003118 DRC SCI WAREHOUSE Southeastern Correctional Inst Lancaster
Contracting Entity
DRC231500 SOUTHEASTERN CORRECTIONAL INST SECI
1 Record(s)
0 Record(s)
Solicitation Documents
Keywords
Search Reset
Title Type Att. Validity End Date Validity End Date
Contract Language Public Solicitation Documents (Approved)
Bidding Guide Public Solicitation Documents (Approved)
Executive Order 2019, 2022 Public Solicitation Documents (Approved)
Affirmation and Disclosure (Please Complete) Public Solicitation Documents (Approved)
O building FE Public Solicitation Documents (Approved)
A-building Fire Exit Public Solicitation Documents (Approved)
E-building Southside Fire Exit Public Solicitation Documents (Approved)
E-Building Northside FE Public Solicitation Documents (Approved)
Chapel FE A Public Solicitation Documents (Approved)
Scope Of Work Public Solicitation Documents (Approved)
10 Record(s)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project: Water Treatment Chemicals for 2027 Ref. #: 2026-403 Type: RFB Status: Open ...

City of Westerville

Bid Due: 10/22/2026

...Water Booster Station Improvements Bids Due: 1 p.m. on Wednesday, Oct. 28, 2026 ...

City of Dublin

Bid Due: 10/28/2026

...Bid Title: Hudson Street Water Line Upgrade Category: Engineering / Public Works Status: ...

City of Athens

Bid Due: 10/26/2026

...Basic Information Solicitation # RFQ033877 Solicitation Type INF Document Title 6005 - JP ...

City of Columbus

Bid Due: 10/22/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.